Monthly Operating Repts for Feb 1994 for Turkey Point Units 3 & 4.W/940314 Ltr
ML17352A480
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 03/14/1994
From: Knorr J, Plunkett J
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
L-94-057, L-94-57, NUDOCS 9403220131
Download: ML17352A480 (15)


Text

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)ACCESSION NBR: 9403220131 DOC.DATE: 94/03/14 NOTARIZED:

NO FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C AUTH.NAME AUTHOR AFFILIATION"KNORR,J.E.

Florida Power&Light Co.PLUNKETT,J.F.

Florida Power&Light Co.RECIP.NAME RECIPIENT AFFILIATION DOCKET 05000250 05000251

SUBJECT:

Monthly operating repts for Feb 1994 for Turkey Point Units 3&.4.W/940314 ltr.DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR l ENCL f SIZE: TITLE: Monthly Operating Report (per Tech Specs)NOTES: D A RECIPIENT ID CODE/NAME PD2-2 PD INTERNAL: AEOD/DOA R/PCS.OEAB EG FILE 01 EXTERNAL: EG&G BRYCE,J.H NSIC COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME CROTEAU,R AEOD/DSP/TPAB NRR/DRIL/RPEB RGN2 NRC PDR COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 1 D D D NOTE TO ALL"RIDS" RECIPIENTS:

D D PLEASE HELP US TO REDUCE WASTE!CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT.20079)TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!TOTAL NUMBER OF COPIES REQUIRED: LTTR 11 ENCL 11 K p~d'0')~J~1~~aa 1 t , e

..Box 029100, Miami, FL, 33102-9100 MAR 14 Sg<L-94-057 10 CFR 50.36 U.ST Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C.20555 Gentlemen:

Re: Turkey Point Units 3 and 4 Docket Nos..50-250 and 50-251 Monthl 0 eratin Re ort In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9'.5, and the guidance of NUREG-0020, attached are the February 1994 Operating Status and Summary'f Operating Experience Reports for Turkey Point Units 3 and 4.Very truly yours, T.F.Plunkett Vice President Turkey Point Plant TFP/JEK/jk Attachments cc: S.D.Ebneter, Regional Administrator, Region II, USNRC T.P.Johnson, Senior Resident Inspector, USNRC, Turkey Point Plant 9403220131; 940314 PDR ADOCK,',OS000250

';-'R--'--,'.-'.'.P..DR"'," 2 CO~~')fl f;A m an FPL.Group company 4U'Q O~9 gpg' I 4C C V I f AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.UNIT DATE COMPLETED BY TELEPHONE 50-250 TURKEY POINT 3 MARCH 11 1994 J.E.Knorr 305-246-6757 MONTH FEBRUARY 1994 AVERAGE DAILY POWER LEVEL (MWe-Net)2/01/94 2/02/94 2/03/94 2/04/94 2/05/94 2/06/94 2/07/94 2/08/94 2/09/94 2/10/94 2/11/94 2/12/94 2/13/94 2/14/94 2/15/94 2/16/94 2/17/94 2/18/94 2/19/94 2/20/94 2/21/94 2/22/94 2/23/94 2/24/94 2/25/94 2/26/94 2/27/94 2/28/94 694 702 706 703 695 689 685 684 683 683 681 681 678 676 691 691 695 699 697 688 14 143 671 678 678 678 682 689 UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.50-250 UNIT NAME: TURKEY POINT UNIT 3 DATE: March 11 1994 COMPLETED BY: J.E.Knorr TELEPHONE:

305 246-6757 REPORT MONTH FEBRUARY 1994 No.Date Type Duration (Hours)Reason Nethod of Shutting Down 3 Reactor Licensee Event Reports System Code Co ponep.Code Cause 4 Corrective Action to Prevent Recurrence 04 022194 05 022294 31.2 0.0 N/A N/A CC PIPEXX PIPEXX Reduced power to 2%to repair 3D MSR Drain Line Steam Generator Chemistry hold-point at 30i P-Pozced S-Scheduled Reason A-Equipment Failure B-Y~intenance or Test C-Refueling D-Regulatory restriction E-Operator Training 4 License Examination P-Administrative G-Operational Error (Explain)H-Other (Explain)Nethod 1-Ymnual 2-Nanual Scram 3-Automatic Scram 4-Continued 5-Load Reduction 9-Other (Explain)Exhibit G-Ins ructions for Preparation of Data Entry Sheets Licensee Event Report (LER)Pile (NUREG-0)61)

Exhibit 1-Same Source r L I g t 0 OPEflATlNG STATUS OPFRAT ING DATA REPORT DOCKET NO 50-250 DATE 3/7/94 COMPLETED BY J.E.KNORR TELEPHONE 305/246/6757 1.UNIT NAME: TURKEY POINT UNIT 3?.RFPOflTING PERIOD: FEBRUARY 1994 3, 1 ICFNSED THERMAL POWER (MWT): 2200 4, NAMEPl.ATE RATING (GROSS MWE): 760 DESIGN FLLCTR ICAl.RATING (NET MWE): 693 6.MAXlMUM DEPFNDABLE CAPAClTY (GROSS MWE): 699 7.MAXIMUM DEPENDABLE CAPACITY (NET MWE): 666 8.IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)SINCE LAST REPORT, GIVE REASONS: 9.POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE)10.REASONS FOR RESTRICTIONS, IF ANY: MONTHLY-YTD-CUMULATIVE f>.HOffRS IN REPORT PERIOD: 1?NffMBER OF ffOURS REACTOR WAS CRITICAL 13.REACTOR RFSERVE.SHUTDOWN HOURS 14.cfOURS GFNERAIOR ON-LINE 15.UNI'1 RESERVf: StfU100WN HOURS 1/.GROSS ELECTRICAL ENERGY GENERATEO (MWH)18.NE1 hf.EC 1'R I CAL FNERGY GENERATEO (MWH)19.UNlT SERVICE FACIOR 20.UNIT AVAILABILI IY FACTOR 21.CAPACITY FACTOR (USING MDC NET)??.CAPAC11Y FACTOR (USING DER NET)?3.UNIT FORCED OUfAGE RATE 24.SffUTDOWNS SCHEDULED OVER NEXT 6 MONTHS CYCLE 14 REFUELING SCffEDULED FOR 4/94 672 672.0 0.0 640.8 1391 126 454310 432803 95.4 95.4 96.7 92.9 4.6 1416 1416.0 0.0 1368.2 2975327 977835 932010 96.6 96.6 98.8 95.0 3.4 186153.6 122676.2 844.4 120901.5 251 1 15165 8055965 1 76201515 64.9 65.0 62.5 59.1 11.7 25.IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

t~

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.UNIT: DATE: COMPLETED BY'ELEPHONE:

50-250 Turke Point 3 March 11 1994 J.E.Knorr 305 246-6757 REPORT MONTH FEBRUARY 1994 Unit 3 began the month at essentially 100%and maintained that level until forced to reduce power to approximately 2%to repair the 3D moisture separator reheater drain line on February 21.The unit had a hold at 30%power for steam generator chemistry on February 22 and returned to 100%power that same day.The Unit remained at essentially 100%power for the remainder of the month.

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.UNIT DATE COMPLETED BY TELEPHONE 50-251 TURKEY POINT 4 MARCH ll 1994 J.E.Knorr 305-246-6757 MONTH FEBRUARY 1994 AVERAGE DAILY POWER LEVEL (MWe-Net)2/01/94 2/02/94 2/03/94 2/04/94 2/05/94 2/06/94 2/07/94 2/08/94 2/09/94 2/10/94 2/11/94 2/12/94 2/13/94 2/14/94 2/15/94 2/16/94 2/17/94 2/18/94 2/19/94 2/20/94 2/21/94 2/22/94 2/23/94 2/24/94 2/25/94 2/26/94 2/27/94 2/28/94 143 525 701 699 694 690 687 687 686 685 684 684 681 681 691 692 695 699 699 691 682 681 682 682 679 680 686 692 UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.50-251 UNIT NAME: TURKEY POINT UNIT 4 DATE: MARCH 11 1994 COMPLETED BY: J.E.Knorr TELEPHONE:

305 246-6757 REPORT MONTH FEBRUARY 1994 No.Date Typel Duration (Hours)Reason Yothod of Shutting Down Reactor Licensee Event Reportf Syste4>Code Coupon op Code cause 4 corrective Action to Prevent Recurrence 01 020194 38.5 N/A CH VALVEX REPAIR TO FEEDNATER REG VALVE FCV 4-498 F-Forced S-Scheduled Reason A-Equip"ent Failure 8-Maintenance or Test C-Refueling D-Regulatory restriction E-Operator Training 6 License Exanination F-Adninistratlve G-Operational Error (Explain)H-Other (Explain)Yethod 1-Nanual 2-Nanual scran 3-Auto"-atlc Scran 4-Continued 5-Load Reduction 9-Other (Explain)Exhibit G-Instructions for Preparation of Data Entry sheets Licensee Event Report (LER)File (NUREG-0161)

Exhibit 1-Same Source H)a t~I, f w J 4~)II)4'II OPERATING DA'fA REPORT OPERATING STATUS DOCKET NO 50-251 DATE 3/7/94 COMPLETED BY J.E.KNORR TELEPHONE 305/246/6757 1.UNIT NAME: TURKEY POINT UNIT 4 2.REPORTING PERIOD: FEBRUARY 1994 3.LICENSED 1HERMAL POWER (MWT): 2200 4 NAMEPLATE RATING (GROSS MWE): 760 b.DESIGN ELECfRICAL RATING (NET MWE): 693 6.MAXIMUM DEPENDABLF CAPACITY (GROSS MWE): 699 7.MAXIMUM DEPENDABLE CAPACITY (NET MWE): 666 8.IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)SINCE I.AST REPOR f, GIVE REASONS: 9.POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE)10.REASONS FOR RESTRICTIONS, IF ANY: MONTHLY-YTO-CUMULATIVE 1 1.HOURS IN RFPORT PERIOD: 12.NUMBER OF HOURS REACTOR WAS CRITICAL 13.REACTOR RESERVE SHUTDOWN HOURS 14.HOURS GENERATOR ON-LiNE 15.UNIT RESERVE SHUTDOWN HOURS 16.GROSS THERMAL ENERGY GENERATED (MWH)17.GROSS ELECIRICAL ENERGY GENERATED (MWH)18.NET ELFCTRICAL ENERGY GENERATED (MWH)19.UNlr SERVICE FACTOR 20.UNIf AVAILABILITY FACTOR 21.CAPACITY FACTOR (USING MDC NET)27.CAPACITY FAC'fDR (USING DER NET)23.UNIT FORCED OUTAGF RATE 24.S>>ufDOWNS SCHEDULED OVER NEXT 6 MONTHS NONE 672 672.0 0.0 672.0 1435483 467230 445373 100.0 100.0 99.5 95.6 0.0 1416 1416.0 0.0 1416.0 3068984 1004470 958255 100.0 100.0 101.6 97.7 0.0 179885.0 118696.3 166.6 114741.0 242128939 77358440 73193487 63.8 64.1 62.1 58.7 11.2 25.IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.UNIT: DATE COMPLETE BY: TELEPHONE:

50-251 Turke Point 4 March 11 1994 J.E.Knorr 305 246-6757 REPORT MONTH FEBRUARY 1994 Unit 4 began the month of February at reduced power of approximately 40%to repair Feedwater Reg Valve FCV 4-498.The Unit was returned to essentially 100%power on February 2 and remained at that level through the end of the month.