Monthly Operating Repts for Feb 1994 for Turkey Point Units 3 & 4.W/940314 Ltr
ML17352A480
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 03/14/1994
From: Knorr J, Plunkett J
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
L-94-057, L-94-57, NUDOCS 9403220131
Download: ML17352A480 (15)


Text

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR: 9403220131 DOC. DATE: 94/03/14 NOTARIZED: NO DOCKET FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 05000250 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 AUTH. NAME AUTHOR AFFILIATION "KNORR,J.E. Florida Power & Light Co.

PLUNKETT,J.F. Florida Power & Light Co.

RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating repts for Feb 1994 for Turkey Point Units D 3 &. 4.W/940314 ltr.

DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR l ENCL f SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES:

A RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL D PD2-2 PD 1 1 CROTEAU,R 1 1 D

INTERNAL: AEOD/DOA 1 1 AEOD/DSP/TPAB 1 1 R/PCS. OEAB 1 1 NRR/DRIL/RPEB 1 1 EG FILE 01 1 1 RGN2 1 1 EXTERNAL: EG&G BRYCE,J.H 1 1 NRC PDR 1 1 NSIC 1 1 D

D D

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 11 ENCL 11

K p

'0')~

~ d J~

1

~

~

aa 1

t

, e

.. Box 029100, Miami, FL, 33102-9100 MAR 14 Sg<

L-94-057 10 CFR 50.36 U. ST Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Gentlemen:

Re: Turkey Point Units 3 and 4 Docket Nos.. 50-250 and 50-251 Monthl 0 eratin Re ort In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9 '.5, and the guidance of NUREG-0020, attached are the February 1994 Operating Status and Summary'f Operating Experience Reports for Turkey Point Units 3 and 4.

Very truly yours, T. F. Plunkett Vice President Turkey Point Plant TFP/JEK/jk Attachments cc: S. D. Ebneter, Regional Administrator, Region II, USNRC T. P. Johnson, Senior Resident Inspector, USNRC, Turkey Point Plant 9403220131; 940314

-'RPDR--'- -,ADOCK,',OS000250

. '.P..DR" ',"

gpg'

')fl CO~~

2 4U'Q f; A m O~9 an FPL.Group company

I 4C C

V I

f

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-250 UNIT TURKEY POINT 3 DATE MARCH 11 1994 COMPLETED BY J. E. Knorr TELEPHONE 305-246-6757 MONTH FEBRUARY 1994 AVERAGE DAILY POWER LEVEL (MWe-Net) 2/01/94 694 2/02/94 702 2/03/94 706 2/04/94 703 2/05/94 695 2/06/94 689 2/07/94 685 2/08/94 684 2/09/94 683 2/10/94 683 2/11/94 681 2/12/94 681 2/13/94 678 2/14/94 676 2/15/94 691 2/16/94 691 2/17/94 695 2/18/94 699 2/19/94 697 2/20/94 688 2/21/94 14 2/22/94 143 2/23/94 671 2/24/94 678 2/25/94 678 2/26/94 678 2/27/94 682 2/28/94 689

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-250 UNIT NAME: TURKEY POINT UNIT 3 DATE: March 11 1994 COMPLETED BY: J. E. Knorr TELEPHONE: 305 246-6757 REPORT MONTH FEBRUARY 1994 No. Date Type Duration Reason Nethod of Licensee System Co ponep. Cause 4 Corrective Action to (Hours) Shutting Event Code Code Prevent Recurrence Down 3

Reports Reactor 04 022194 31. 2 N/A CC PIPEXX Reduced power to 2% to repair 3D MSR Drain Line 05 022294 0.0 N/A PIPEXX Steam Generator Chemistry hold-point at 30i P Pozced Reason Nethod Exhibit G - Ins ructions Exhibit - Same Source S Scheduled A - Equipment Failure 1 Ymnual for Preparation of Data 1

B Y~intenance or Test 2 - Nanual Scram Entry Sheets Licensee C - Refueling 3 - Automatic Scram Event Report (LER) Pile D - Regulatory restriction 4 - Continued (NUREG-0)61)

E - Operator Training 4 5 - Load Reduction License Examination 9 - Other (Explain)

P Administrative G - Operational Error (Explain)

H - Other (Explain)

L r

I g t 0

OPFRAT ING DATA REPORT DOCKET NO 50 - 250 DATE 3/ 7/94 COMPLETED BY J. E. KNORR TELEPHONE 305/246/6757 OPEflATlNG STATUS

1. UNIT NAME: TURKEY POINT UNIT 3

?. RFPOflTING PERIOD: FEBRUARY 1994 3, 1 ICFNSED THERMAL POWER (MWT): 2200 4, NAMEPl.ATE RATING (GROSS MWE): 760 DESIGN FLLCTR ICAl. RATING (NET MWE): 693

6. MAXlMUM DEPFNDABLE CAPAClTY (GROSS MWE): 699
7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 666
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)

SINCE LAST REPORT, GIVE REASONS:

9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE)
10. REASONS FOR RESTRICTIONS, IF ANY:

MONTHLY -YTD- CUMULATIVE f>. HOffRS IN REPORT PERIOD: 672 1416 186153. 6 1? NffMBER OF ffOURS REACTOR WAS CRITICAL 672.0 1416. 0 122676. 2

13. REACTOR RFSERVE. SHUTDOWN HOURS 0.0 0.0 844.4
14. cfOURS GFNERAIOR ON-LINE 640.8 1368.2 120901. 5
15. UNI'1 RESERVf: StfU100WN HOURS 1391 126 2975327 251 1 15165 1/. GROSS ELECTRICAL ENERGY GENERATEO (MWH) 454310 977835 8055965 1
18. NE1 hf.EC 1'R I CAL FNERGY GENERATEO (MWH) 432803 932010 76201515
19. UNlT SERVICE FACIOR 95.4 96. 6 64.9
20. UNIT AVAILABILIIY FACTOR 95.4 96. 6 65.0
21. CAPACITY FACTOR (USING MDC NET) 96.7 98.8 62.5

??. CAPAC11Y FACTOR (USING DER NET) 92.9 95.0 59. 1

?3. UNIT FORCED OUfAGE RATE 4.6 3.4 11.7

24. SffUTDOWNS SCHEDULED OVER NEXT 6 MONTHS CYCLE 14 REFUELING SCffEDULED FOR 4/94
25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

t ~

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO. 50-250 UNIT: Turke Point 3 DATE: March 11 1994 COMPLETED J. E. Knorr BY'ELEPHONE:

305 246-6757 REPORT MONTH FEBRUARY 1994 Unit 3 began the month at essentially 100% and maintained that level until forced to reduce power to approximately 2% to repair the 3D moisture separator reheater drain line on February 21.

The unit had a hold at 30% power for steam generator chemistry on February 22 and returned to 100% power that same day. The Unit remained at essentially 100 power for the remainder of the month.

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-251 UNIT TURKEY POINT DATE COMPLETED BY MARCH J. E.

ll 1994 Knorr 4

TELEPHONE 305-246-6757 MONTH FEBRUARY 1994 AVERAGE DAILY POWER LEVEL (MWe-Net) 2/01/94 143 2/02/94 525 2/03/94 701 2/04/94 699 2/05/94 694 2/06/94 690 2/07/94 687 2/08/94 687 2/09/94 686 2/10/94 685 2/11/94 684 2/12/94 684 2/13/94 681 2/14/94 681 2/15/94 691 2/16/94 692 2/17/94 695 2/18/94 699 2/19/94 699 2/20/94 691 2/21/94 682 2/22/94 681 2/23/94 682 2/24/94 682 2/25/94 679 2/26/94 680 2/27/94 686 2/28/94 692

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-251 UNIT NAME: TURKEY POINT UNIT 4 DATE: MARCH 11 1994 COMPLETED BY: J. E. Knorr TELEPHONE: 305 246-6757 REPORT MONTH FEBRUARY 1994 No. Date Typel Duration Reason Yothod of Licensee Syste4> Coupon op cause 4 corrective Action to (Hours) Shutting Event Code Code Prevent Recurrence Down Reportf Reactor 01 020194 38.5 N/A CH VALVEX REPAIR TO FEEDNATER REG VALVE FCV 4-498 F Forced Reason Yethod Exhibit G - Instructions Exhibit 1 - Same Source S - Scheduled A - Equip"ent Failure 1 - Nanual for Preparation of Data 8 - Maintenance or Test 2 - Nanual scran Entry sheets Licensee C - Refueling 3 Auto"-atlc Scran Event Report (LER) File D Regulatory restriction 4 - Continued (NUREG-0161)

E - Operator Training 6 5 - Load Reduction Exanination 9 - Other (Explain)

F - License Adninistratlve G Operational Error (Explain)

H Other (Explain)

H

)a t ~

I, f

w J 4

~ )II) 4 '

II

OPERATING DA'fA REPORT DOCKET NO 50 - 251 DATE 3/ 7/94 COMPLETED BY J. E. KNORR TELEPHONE 305/246/6757 OPERATING STATUS

1. UNIT NAME: TURKEY POINT UNIT 4
2. REPORTING PERIOD: FEBRUARY 1994
3. LICENSED 1HERMAL POWER (MWT): 2200 4 NAMEPLATE RATING (GROSS MWE): 760
b. DESIGN ELECfRICAL RATING (NET MWE): 693
6. MAXIMUM DEPENDABLF CAPACITY (GROSS MWE): 699
7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 666
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)

SINCE I.AST REPOR f, GIVE REASONS:

9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE)
10. REASONS FOR RESTRICTIONS, IF ANY:

MONTHLY -YTO- CUMULATIVE 1 1. HOURS IN RFPORT PERIOD: 672 1416 179885.0

12. NUMBER OF HOURS REACTOR WAS CRITICAL 672.0 1416.0 118696.3
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 166.6
14. HOURS GENERATOR ON-LiNE 672.0 1416.0 114741. 0
15. UNIT RESERVE SHUTDOWN HOURS
16. GROSS THERMAL ENERGY GENERATED (MWH) 1435483 3068984 242128939
17. GROSS ELECIRICAL ENERGY GENERATED (MWH) 467230 1004470 77358440
18. NET ELFCTRICAL ENERGY GENERATED (MWH) 445373 958255 73193487 19 . UNlr SERVICE FACTOR 100.0 100.0 63.8
20. UNIf AVAILABILITYFACTOR 100. 0 100.0 64.1
21. CAPACITY FACTOR (USING MDC NET) 99.5 101. 6 62.1
27. CAPACITY FAC'fDR (USING DER NET) 95.6 97.7 58.7
23. UNIT FORCED OUTAGF RATE 0.0 0.0 11.2
24. S>>ufDOWNS SCHEDULED OVER NEXT 6 MONTHS NONE
25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO. 50-251 UNIT: Turke Point 4 DATE March 11 1994 COMPLETE BY: J. E. Knorr TELEPHONE: 305 246-6757 REPORT MONTH FEBRUARY 1994 Unit 4 began the month of February at reduced power of approximately 40% to repair Feedwater Reg Valve FCV 4-498.

The Unit was returned to essentially 100% power on February 2 and remained at that level through the end of the month.