R. E. Ginna - Forwards Monthly Operating Status Report for Month of January 1976
ML18142B389
Person / Time
Site: Ginna Constellation icon.png
Issue date: 02/06/1976
From: Platt C
Rochester Gas & Electric Corp
To:
NRC/IE
References
Download: ML18142B389 (10)


Text

)NRC.FORM 195 U.S.NUCLCAR REGULATORY COMi'SION (2-78)NRC DISTRIBUTION FoR PART 50 DOCI(ET MATERIAL DOCKET NUMBER 50-244 FILE NUMBER MONTHLY REPORT TO: NRC FROM: Rochester Gas&Elec.Corp.'Rochester, N.Y.14649 Charles E.Platt DATC OF DOCUMENT DATC RECEIVED OLETTEB NIOB IGINAL CICOPY QNOTORIZED

%UNCLASSIFIED PROP INPUT FORM NUMBER OF COPIES RECEIVED 10.DESCRIPTION LETTER TRANS THE POLLOMXNG:

MNTHLY REPORT FOR JAN.1976 PLANT&COMPONENT OPERABXLXTY

&AVAILABILITY'HXS REPORT TO BE USED XN PREPARXNG GRAY BOOK BY PLANS&OPERATXONS.

PLANT NAME: R.E~Gonna Plant)')gkktIWI.E%8 MXPC P/.CYS POR ArvTON FOR ACTION/INFO RMATI ON)P~)J+P INTERNAL DISTRIBUTION BRANCH CHIEP L Roc ester,~EXTERNAL DISTRIBUTION yons, N.Y.CONTROL NUMBER NBC FORM I96{2.7GI h~'>>I'~t'll a.~'~A~a~~)l~."-e'>"">>fo'l ,"".4 g,'X3"LP I)'/ll gl RegoIatory Docket Filet t ZZZZZ//I/////////

sziisjjs/////////////

ZiSX/////////////

ROCHESTER GAS AND ELECTRIC CORPORATION i4i'--~]g-ii"': o S9 EAST AVENUE, ROCHESTER, N.Y.14649 P TELEPHONE AREA CODE Tld 546-2700 Ginna Station February 6, 1976 Director, Office of Inspection and Enforcement U.S.Nuclear Regulatory Commission Washington, D.C.20555

Subject:

Monthly Report for January, 1976 Operating Status Information R.E.Ginna Nuclear Power Plant Unit No.1 Docket No.50-244 l~gg@%tm WWOÃbtfNL~ma lp/Gentlemen:

Pursuant to Technical Specification 6.9.1:c attached herewith is the monthly operating status report.for Ginna Station for the month of January, 1976.Also, ten additional copies of the attach-ment are enclosed.Very truly yours, Q~z Charles E.Platt Superintendent CEP:fah Attachments cc: Mr.James P.O'Reilly, NRC (1)Mr.William G.McDonald, NRC (2)op c't 5>pPQ f;gt$7AS~m~~~@

II II' fjLii8fory DOCketlIl8'PERATING DATA REPORT g~<Q(jg+)Ur eclat~DOCKET NO.'0-2<4 OPERATING STATUS UNIT Nl Ginna Station DATE February 6, 1976 COMPLETED BY Andrew.c amara, TEI.EPHONE l-716-546-2700 Ext.at Ginna erations Aid 91-214 1.REPORTING PERIOD: y GROSS HOURS IN REPORTING PERIOD: 2.CURRENTLY AUTHORIZED POWER LEVEL (MWt): 520 MAX.DEPEND.CAPACITY (MWe-Net):

470 DESIGN ELECTRICAL RATING (MWe.Net)s 47 3.POWER LEVEL TO WHICH RESTRICTED (IF ANY)(MWe-Net)s 4.REASONS FOR RESTRICTION (IF ANY): THIS MONTH YR TO DATE CUMULATIVE'.

HUMMER OF HOURS REACTOR EAS CRITICAL....,.:...,...376.89 376.89 41 545.59 6.REACTOR RESERVE SHUTDOWN HOURS 1.85 1.85 293.98 7.HOURS GENERATOR ON LINE 371 371 407283.63 8.UNIT RESERVE SHUTDOWN HOURS~T~~~~~~~~~~~1~~0 0 8.5+9 GROSS THERMAL ENERGY GENERATED (MEN>'532 560 10.GROSS ELECTRICAL ENERGY GENERATED (MWH)11.NET ELECTRICAL ENERGY GENERATED (MWH).............

1669526 532 560 50,903,434 175,205 16,981,066 166,526 16,058,891-12.REACTOR SERVICE FACTOR 50.66 50.66 76.1 13.REACTOR AVAILABILITY FACTOR~50.9 50.9 76.6 14.UNIT SERVICE FACTOR 15.UNIT AVAILABILITY FACTOR~..49.9 49.9'49~9 49~9 16.UNIT CAPACITY FACTOR (U@IIlg MDC)~~~~~~~~~~~~~~~47.6 47.6 17.UNIT CAPACITY FACTOR (UsIng DesIgn MWe).~~..~~~~~~~~~~47~6 47.6 74.3 74.35 67.03 67.03'8.UNIT FORCED OUTAGE RATE 50.13 50.13 9.6 19.SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH): 20.IF 5HUT DowN AT END 0F REP0RT PERI0D, EsTIMATED DATE oF sTARTUPs A ril l 1976 21.UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION)s FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION*Cumulative data commencing January l, 1975 40 dd REVS t0/7d 1C I U'I rt A I I V AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.-50 244 UNIT III@irma Station DATE Februar 6 1976 COMPLETED B Andrew E.~~McNamara",~~0 eration Ai e TELEPHONE EXT.291-214, at Gonna MON TH Januar 1976 DAY AVERAGE DAILY POWER LEVEL (M We-N'et)DAY;AVERAGE DAlLY POWER LEVEL (MWe-Net)10 ll 12 13 16 16 0 25 212 359 480 17 480 479 480 479 480 480 478 478 480 483 482 28 481 29 93 30 31 INSTRU,CTIONS On this form, list the average daily unit power level in MWe+'et for each.day in the reporting month.Compute to the nearest whole megawatt.These figures will be use'd to plot a graph for each reporting month.Note that when maximum depend-able capacity'.is used for the net electrical rating of the unit, there may."be occasions when the daily average power level exceeds the 100%line (or the restricted power level line).In such cases, the average dail'y unit power output sheet should be footnoted to explain the apparent anomaly.40-87 RKVo 10/75 III 4~~tt ij, t.R DOCKET NO.50-244

SUMMARY

The unit was returned to service on 1/13/76 after repairing a tube leak in the"B" Steam Generator.

NOTE: This outage began on 12/30/75.The reactor power level averaged 100%until 1/29/76 when the unit was taken out of service due to blade failure in the f12 low pressure turbine.REPORT MONTH Janua~, 1976 NAME Gl NNA STAT I ON~UN I T 01 February 6, 1976 COMPLETED BY Andrew E.McNamara, eratzons Aide TELEPHDNE 1-716-546-2700 Ext.291-214 at Ginna UNIT Sl-!UTDOWN AND POWER REDUCTIONS NO.DATE TYPE F-FORCED S-SCHEDULED DURATION (HOURS)REASON (I)METHOD OF SHUTTING DOWN THE REACTOR OR REDUCING POWER (2)CORRECTIVE ACTIONS/COMMENTS 306.75 A"B" Steam Generator, Tube 1'eak (*Outage began on 12/30/75..

Outage hours reflect 1976, only).1 760129 66.25 g2 Low Pressure Turbine-Blade failure.(NOTE: Unit remained shutdown at end of report month).(I)REASON: A-EOUIPMENT FAILURE (EXPLAIN)B-MAINT.OR TEST C-REFUELING D-REGULATORY RESTRICTION E-OPERATOR TRAINING AND LICENSE EXAMINATION F-ADMINISTRATIVE G-OPERATIONAL ERROR (EXPLAIN)H-OTHER (EXPLAIN)(2)METHOD: I-MANUAL 2-MANUAL SCRAM 3-AUTOMATIC SCRAM 4-OTHER (EXPLAIN)REV.$0/75 g9.89

,~~~~gf P 4 J I k'