ML18142B390

From kanterella
Revision as of 06:07, 17 June 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
R. E. Ginna - Forwards Revised Unit Shutdown and Power Reduction Data Sheet for Monthly Operating Report for December 1975
ML18142B390
Person / Time
Site: Ginna Constellation icon.png
Issue date: 01/08/1976
From: Platt C
Rochester Gas & Electric Corp
To:
NRC/IE
References
Download: ML18142B390 (28)


Text

MONTHLY" PORTS iFOR GRAY BOOK PREPARATT0%

NRC bsoTRIBUTION FOR PART 50 DOCKE.'IATERIAL (TEMPORARY FORM)CONTROL NO: FILE MONTHLY REPORT FILE oc ester Gas&Elec.C rg,qTEOF DOC Rochester; N.Y.C.E.P1att ORIG DATE R EC'D LTR CC OTHER TWX RPT.OTHER s NRC CLASS UNCLASS PROPINFO XXX DESCRIPTION:

'Ltr trans the following:

1 Si ned INPUT LO NO CYS REC'D DOCKET NO: ENCLOSURES:

Monthly Report for DeCember 1975 Plant&Component Operability

&Availability This Report to be used in preparing Gray Book by Plans&Operations.

NUMBER OP COPIES REC'D: PLANT NAME: FOR ACTION/INFORMATION BUTLER (L)W/Copies CLARK (L)\A//Copssss'ARR (L)W/Copies KNtEt (L)W/Copies G FI~NR DR OGC, ROOM P-506A.GOSSI CK/STAF F CASE/BOYD MOORE (L)DEYOUNG (L)SKOVHOLT (L)GOLLER{L){Ltr)P.COLLINS DENISE REG OPR FI I.F.6 REGION (2)STEELE SCHWENCER (L)W/Copies STOLZ (L)W/Copies VASSALLO (L)-W pies RPLE (L)W/Copies TECH REVIEW SCHROEDER MACCARY KNIGHT PAWLI CKI SHAO STE LLO HOUSTON NOVAK ROSS IPPOLI TO TEDESCO J.COLLINS LAI NAS BENAROYA VOLLMER tNTERNAL DtSTRIBUTION LIC ASST R.DIGGS (L)H.GEAR IN (L)E.GOULBOURNE P.KREUTZER (E)J.LEE (L)M.RUSHBROOK (L)FNVIRO S.REED (EI MULLER'.S VICE (t)DICKER.SHEPPARD (L)KNIGHTON M.SLATER (E)YOUNGBLOOD H.SMITH (L)REGAN S.TEETS (L)PROJECT LDR G.WILLIAMS (E)V.WILSON (L)HARLESS R.INGRAM (L)M DUN A~N EXTERNAL DISTRIBUTION A/T I ND~8 RAITMAN SALTZMAN (L)MELTZ DENTON GRIMES GAMM ILL KASTNER BALLARD SPANGLER PLANS~MCDONALD~CHAPMAN DUBE (Ltr)E.COUP.E PETERSON HARTFIELD (2)KLECKER E ISENHUT Wl GG INl ON K.PARRISH L ZIEMANN (L)BEGAN (E)W/Copies Vil/Copies+0 NOT REMO~DICKER (E)LEAR (L)KNIGHTON (Ei SPELS W/.Copies W/Copies YOUNGBLOOD (E)>>MIPC/PE W/Copies W,4 Copies~1-LOCAL PDR~~Mm Rochester, N.Y.~'l-TIC (ABERNATHY)

(1}(2)('IO)

-NATIONAL LABS~1-NSIC (BUCHANAN) 1-W.PENNINGTON, Rm E-201 GT 1-ASLB 1-CONSULTANTS s 1-Newton Anderson NEWMARK/BLUME/AG BABI AN-ACRS HOLDING/SENT 1-P D R-SAN/LA/N Y 1-BROOKIHAVEN NAT LAB 1-G.ULRIKSON, ORNL 1-AGMED (RUTH GUSSMAN)Rm B-127.GT 1-J.D.RUNKLES, Rm E-201 GT P~

', t ZW///SIXES//I/IIII'ZFiH':

/////I//8'///I///////

ROCHESTER GAS AND ELECTRIC CORPO cj T AVENUE, ROCHESTER, N.Y.14649 URIEL JP, ge.lBES.>~-.r TELEIIHONE AREA coDE 7ld 546-2700 Ginna Station January 8, 1976~ReguTatorP

'Ajtk.N<'irector, Office of Inspection and Enforcement U.S.Nuclear Regulatory Commission Washington, D.C.20555 1 (P i~l/N e

Subject:

Monthly Report for December, 1975 (Revised)Operating Status Information R.E.Ginna Nuclear Power Plant Unit No.1 Docket No.50-244 Gentlemen:

Pursuant to Technical Specification 6.9.1c attached herewith is a re-vised unit shutdown and power reduction data sheet, to correct previous error in reporting reasons for reductions in reactor power levels on 12/13, 12/21 and 12/23.Very truly yours, gtP Charles E.Platt Superintendent CEP:fah Attachments 1 cc: Mr.James P.O'Reilly, NRC (1)Mr.William G.McDonald, NRC (2) t I 11 DOCKET NO.50-244

SUMMARY

The reactor power levels averaged 99%during the period.The major exceptions were the power reduc-tions and Outage 814 detailed below.REPORT MONTH GINNA STATION, UNIT PI January 8, 1976(Revision)

DATE COMPLETED BY Andrew E.McNamara, Operations Aide TELEPHONE Ext.291-214, at Ginna UNIT SHUTDOWN AND POWER REDUCTIONS NO.DATE TYPE F-FORCED S-SCHEDULED DURATION (HOURS)REASON (I)METHOD OF SHUTTING DOWN THE REACTOR OR REDUCING POWER (2)CORRECTIVE ACTIONS/COMMENTS N/A 75 12 13 Reactor power level reduction to~47%=to perform T-'8B, Turbine Main Steam Stop Valves test.N/A 75 12 21 A Reactor power level reduction to~47%to perform M-54.2, Check condenser 1B-1 Water Box for Leaks with Freon.N/A 75 12 23 A Reactor power level reduction to~47%to perform M-54.2, Check condenser 1B-1 Water Box for Leaks, with Freon.14 75 12 30 43.75 See Note)"B" Steam Generator-Tube Leak NOTE: Unit remained shutdown through the end of report month.(I)REASON: (2)METHOD: A-EOUIPMENT FAILURE (EXPLAIN)I-MANUAL B-MAINT.OR TEST 2-MANUAL SCRAM C-REFUELING 3-AUTOMATIC SCRAM D-REGULATORY RESTRICTION 4-OTHER (EXPLAIN)E-OPERATOR TRAINING AND LICENSE EXAMINATION F-ADMINISTRATIVE G-OPERATIONAL ERROR (EXPLAIN)H-OTHER (EXPLAIN).+Power reductions were not previously reported.Data not available.

Commencing January 1, 1976, this data wig bp pegprteg.~9 0 L'~,

DOCKET RO.50-2i:C 5!ARY I The reactor power levels averaged 99Z durirg the period.The ma)or exceptions vere the power reduc-tions and Oueage F'14 deeailed be'v.REPORT MONTH UVIT RAvE DATE GIRRA STATlos, UR'T AI January 8, 1976(Revision)

COMPLETED SY Andzev E.McNamara, Operations Aide TELEPHONE-7 4 Ext.291-214, at Ginra UNIT S-uTDOIY'N AND POWER REDUCTIONS NO.DATE TYP E F-FORCED S-SCHEDUI.ED DURAT I OiN (HOURS)REASON (I)METHOD OF SHUTTING DOWN THE REACTOR OR REDUCING POWER (2)CORRECT I VE ACT I ONS/COLNENTS N/A 75 12 13 Reactor power level reduction toL 47Z to perform T-18B, Turbine venin Seeam Stop Ualves test.N/A 75 12 21 0 Reactor power level reduction toŽ47Z to perform M-54.2, Check condenser 1B-1 Mater Box for Leaks vith Freon.N/A 75 12 23 Reactor power level reduceion to I47Z to perform N-54.2, Check condenser 1B-1 Mater Box for Leaks, with Freon.75 12 30 43.75 See Note)"B" Steam Generator-Tube Leak NOTE: Unit remained shutdown thzough the end of zeport onth.(I)REASORI (2)MEiHOOI A EOUIPME.T FAILURE (EXPLAIII)

I VARUAL S MAINT.OR TEST 2-MARUA'cRAv.

C-REFUELING 3-AUTOVATIC SCRAM 0-REGUlATORY RESTRICTION 4-OTHER (EXPLAIN)E OPERATOR TRAII<IRG ARO lICEiiSE EXAvlRATIOR F-ADMINISTRATIVE OPERATIONAL ERROR (EXPLAIN)H OTHER (EXPL*III)

RPower reducti'ons were not previously reported.Data not available.

Commencing Januazy 1, 1976, this data I

> DOCKET NO.50-244 PIARYI The reactor power levels averaged 99X during the period.The ma/or exceptions were the power reduc-tions and Outage 814 detailed below.REPORT MONTH DATE GIMNA STATION OMIT> ~. DIARY I The reactor pover levels averaged 99Z during the period.The ma)or exceptions 'were the power reduc-tions and Outage 814 detailed belov.REPORT MONTH DOCKET NO.50-244 UNIT NAME GINNA STATIDN.UNIT<I January 8, 1976(Revision) DATE COVPLETEO SY Andrew E.McNamara, Operations Aide TELEPHONE 7 6-4 Ext.291-214, at Ginna UNIT SI-QTDOWN AND POWER REDUCTIONS DATE TYPE F-FORCED S-SCHEDULED DURATION (HOURS)REASON (I)METHOD OF SHUTTING DOWN THE REACTOR OR REDUCING POWER (2)CORRECTIVE ACTIONS/COAIVENTS N/A 75 12 13 0 B Reactor power level reduction to~47Z to perfo~T-18B, Turbine Yogin Steam Stop Valves test.N/A N/A 75 12 21 75 12 23 0 0 Reactor power level reduction toŽ47Z to perform iM.-54.2, Check condenser 1B-1 Mater Box for Leaks with Freon.Reactor power level reduction to~47Z to perform if-54.2, Check condenser 1B-1 Vater Box for Leaks, with Freon.14 75 12 30 43.75 See Note)"B" Steam Generator-Tube Leak NOTE: Unit remained shutdown through the end of report onth.(I)REASON!(2)METNODI A-EQUIPME::T FAILURE (EXPLAIN)I-VasuaL D-MAINT.OR TEST 2-MANUA'cRav. C-REFUELING 3-AUTGvaTIc scpav D-REGULATORY RESTRICTION 4-OTNER (EXPLA!N)E OPERATOR TRAINING ANO I.ICENSE EXAMINaTION F-ADMINISTRATIVE G-OPERATIONAL ERROR (EXPLAIN)H OTIIER'(EXPLAIN) ~power reductions were not.previouslv reported.Data not available. Connencing January 1, 1976, this data wiQ bp,ge@rte>'c UNIT NAVE GINNA STATION, UNIT AI January 8, 1976(Revision) DATE COMPLETED 8Y Andrew E.McNamara, Operations Aide TELEPHONE 7 4 Ext.291-214, at Ginna UNIT S.uTDOWN AND POWER REDVCTI(NS NO." DATE TYPE F-FORCED S-SCHEDUI.ED DURATION (HOURS)REASON (I)METHOD OF SHUTTING DOWN THE REACTOR OR REDUCING POWER (2)CORRECT I VE ACT I ONS/CO.'i'MENTS N/A 75 12 13 0 B Reactor power level reduction toL"47X to perform T-18B, Turbine Main Steam Stop Valves test.N/A 75 12 21 0 Reactor power level reduction to~47X to perform M-54.2, Check condenser lB-1 Water Box for Leaks with Freon.N/A 75 12 23 S.0 A Reactor power level reduction to I47/to perform M-54.2, Check condenser 1B-1 Water Box for Leaks, with Freon.14 75 12 30 43.75*See Note)"B" Steam Generator-Tube Leak NOTE: Unit remained shutdown through the end of report=anth.(I)REASON: (2)METHOOr A-EOUIPMENT FAILURE (EXPLAIN)I-MANUAL 8-MAINT.OR TEST 2 MANUAL scRAV C-REFUELING 3 AU OuATIC SCRAu D-REGVLATORY RE'STRICTION 4-OTHER (EXPL*III) F.-OPERATOR TR*INI:IG ANO LICENSE EXAul>>lATION F-ADMINISTRATIVE G OPERATIONAL ERROR (EXPLAIN)H-OTHER (EXPLAI.'I) ~Power reductions were not previously reported.Data not aVailable. CODmreneing January 1, 1976, thiS data WiQ bp pep>rtegr t O. DOCKET NO.50-24'.!ARY I The reactor pover levels averaged 99X during the period.The ma)or exceptions vere the power reduc-tions and Outage II14 detailed below.REPORT MONTH UNIT NAME GLNVA STATIOV, UNIT LI January 8, 1976(Revision) DATE COMPLETED SY Andrew E.McNamara, Operations Aide TEIEPHONE-7-4 Ext.291-214, at Ginna UNIT 3-uTDOII AND POWER REDUCTIONS DATE TYPE F-FORCED S-SCHEDULED DURATION (HOURS)REASON (I)METHOD OF SHUTTING DOWN THE REACTOR OR REDUCING POWER (2)CORRECT I VE ACTIONS/COIN! ENTS N/A 75 12 13 0 B Reactor power level reduction to'A 47X to perform T-18B, Turbine venin Steam Stop Ualves test.N/A 75 12 21 0 Reactor power level reduction toŽ47K to perform)(-54.2, Check condenser 1B-1 Water Box for Leaks vith Ereon.N/A 75 12 23 0 Reactor power level reduction to~47X to perform M-54.2, Check condenser 1B-1 Water Box for Leaks, with Freon.14 75 12 30 43.75 See Note)"B" Steam Generator-Tube Leak NOTE: Unit remained shutdown through the end of report onth.(I)REASOV: A EOUIPAtE;:T FAILURE (EXPLAIN)8-MAINT.OR TEST C-REFUELING D-REGULATORY RESTRtCTION E OPERATOR TRAINING AND LICENSE EXAMINATION F ADAIINISTRATIVE G OPERATIONAL ERROR (EXPLAIN)H-OTHER (EXPLAIN)~Power reductions vere not previously reported.Data not available. Commencing January 1, 1976, this data viQ bp,ge@rtegt>> ~.>A DOCKET NO.50-244'MARY: The reactor power levels averaged 99%during the period.The ma)or exceptions were the power reduc-tions and Outage 814 detailed below.REPORT MONTH UV I'T VAilE Gl NNA STA'Tl OV, UV I~> DOCKET NO.50-2(4 t.'!PRY I The reactor power levels averaged 99X during the period.The ma)or exceptions vere the power reduc-tions and Outage f14 detailed below.REPORT NORTH UVIT VAvE GINVA STATIOV.~v!T=', DATE January 8, 1976(Revision) COMPLETED 8Y Andrew E.McNamara, Operations Aide TELEPHONE-7-4 Ext.291-214, at Ginna UNIT SI-IUTOOWiil AND POWER RFOUCTIGMS DATE TYP E F-FORCED S-SCHEDULED DURATION (HOURS)REASON (I)METHOD OF SHUTTING DOIlVN THE REACTOR OR REDUCING POPOVER (21 CORRECTIVE ACTIONS/CONTENTS N/A>>75 12 13 Reactor power level reduction toA"47X to perform T-18B, Turbine Ruin Steam Stop Valves test.N/A 75 12 21 0 Reactor power level reduction to~47X to perform)(-54.2, Check condenser lB-1 Mater Box for Leaks with Preon.N/A 75 12 23 0 Reactor power level reduction to~47!to perform H-54.2, Check condenser 1B-1 Vater Box for Leaks, with Freon.14 75 12 30 43.75 See Note)"BH Steam Generator-Tube Leak NOTE: Unit remained shutdown through the end of report onth.(I)REASOMI (2)A!ETHOD: A-EOUIPUE::t FAII.ORE (EXPLAIN)I UAVQAI.8-MAINT.OR TEST 2-MANUAL SCPAv.C-REFUELING 3-AUTOVATIC SCRAM D-REGULATORY RESTRICTION C-OTHER (EXPLAIN)E-OPERATOR TRAINING AND LICENSE EXAvIMATIOV F-ADA'll NI STRATI YE G OPERATIONAL ERROR (EXPLAIN)H-OTHER (EXPI.AIN) ~power reductions were not previously reported.Data not available. Commencing January 1, 1976, this data w'QT bp ge+rtegt>> DOCKET NO.50 AC VARY: The reactor power levels averaged 99%during the period.The ma)or exceptions were the power reduc-t'ons and Outage LB14 detailed below.REPORT MONTH UV IT NAVE GINNA STAT I OV, UN I T~l January 8, 1976(Revision) DATE COMPLETED BY Andrew E.McNamara, Operations Aide TELEPMONE 7 4 Ext.291-214, at Ginna uwtT 3.RJTOORM AND POMER REOUCTIGQS NO.DATE TYPE F-FORCED S-SCHEDULED DURATION (HOURS)REASON (I)hIETHOD OF SHUTTING DOWN THE REACTOR OR REDUCING POWER (2)CORRECTIVE ACTIONS/COI'MENTS N/A 75 12 13 0 Reactor power level reduction toL 47%to perform T-18B, Turbine wain Steam Stop Valves test.N/A 75 12 21 0 Reactor power level reduction to~47%to perform)(-54.2, Check condenser 1B-1 Water Box for Leaks with Preon.N/A 75 12 23 0 Reactor power level reduction to~47%to perform"(-54.2, Check condenser 1B-l Water Box for Leaks, with Freon.14 75 12 30 43.75 See Note)A"B" Steam Generator-Tube Leak NOTFI Unit remained shutdown through the end of repozt onth.(I)REASON: (2)METNODI A-EOUIPME.T FAILURE (EXPLAIN)I VANDAL B-MAINT.OR TEST 2-VANUA'CRAV C REFUELING 3 AUTOVATIC SCRAM D-REGULATORY RESTRICTION OTHER (EXPLAIN)E-OPERATOR TRAltllNG AND LICENSE EXAVINATION F-ADXIINI STRATI YE G OPERATIOVAL ERROR (EXPLAIN)H-OTHER (EXPLAIN)IIPower reductions were not previouslv reported.Data not available. COIImIencing Januazy I, 1976, this data wig bp,gegrtegt '0 OOCKET NO.50-24C YI The eactor power levels averaged 99X dur'ng the period.The ma)or exceptions were the power reduc-tions and Outage i14 detailed below.REPORT MONTH UNIT NAVE GINNA STATION,"NIT<> Ce