Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARML17355A4471999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Turkey Point,Units 3 & 4.With 991008 Ltr ML17355A4121999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Turkey Point,Units 3 & 4.With 990909 Ltr ML17355A3981999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Turkey Point,Units 3 & 4.With 990809 Ltr ML17355A3841999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Turkey Point,Units 3 & 4.With 990713 Ltr ML17355A3511999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Turkey Point,Units 3 & 4.With 990609 Ltr ML17355A3331999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Turkey Point,Units 3 & 4.With 990511 Ltr ML17355A2911999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Turkey Point,Units 3 & 4.With 990414 Ltr ML17355A2551999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Turkey Point Nuclear Power Plant,Units 3 & 4.With 990315 Ltr ML17355A2261999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for Turkey Point,Units 3 & 4.With 990211 Ltr ML17355A1911998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Turkey Point,Units 3 & 4.With 990112 Ltr ML18008A0461998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Turkey Point,Units 3 & 4.With 981209 Ltr ML17354B1901998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Turkey Point,Units 3 & 4.With 981112 Ltr ML17354B1311998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Turkey Point Unit 3 & 4.With 981012 Ltr ML17354B0981998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Turkey Points,Units 3 & 4.With 980915 Ltr ML17354B0771998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Turkey Point,Units 3 & 4.W/980810 Ltr ML17354B0241998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Turkey Point,Units 3 & 4.W/980709 Ltr ML17354A9711998-05-31031 May 1998 Monthly Operating Repts for Turkey Point,Units 3 & 4. W/980611 Ltr ML17354A9231998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Turkey Point,Units 3 & 4.W/980511 Ltr ML17354A8821998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Turkey Point,Units 3 & 4.W/980409 Ltr ML17354A8311998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Turkey Point,Units 3 & 4.W/980311 Ltr ML17354A7871998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Turkey Point,Units 3 & 4.W/980209 Ltr ML17354A7581997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Turkey Point,Unit 3 & 4.W/980112 Ltr ML17354A7381997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Turkey Point,Units 3 & 4.W/971215 Ltr ML17354A7211997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Turkey Point,Units 3 & 4.W/971114 Ltr ML17354A6811997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Turkey Point,Units 3 & 4.W/971009 Ltr ML17354A6221997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for Turkey Point. W/970909 Ltr ML17354A6051997-07-31031 July 1997 Monthly Operating Repts for July 1997 for TPS.W/970806 Ltr ML17354A5731997-06-30030 June 1997 Monthly Operating Repts for June 1997 for Turkey Point,Units 1 & 2.W/970710 Ltr ML17354A5261997-05-31031 May 1997 Monthly Operating Repts for May 1997 for Turkey Point Units 3 & 4.W/970612 Ltr ML17354A5071997-04-30030 April 1997 Monthly Operating Repts for April 1997 for TPS.W/970512 Ltr ML17354A4631997-03-31031 March 1997 Monthly Operating Repts for Mar 1997 for Turkey Point Units 3 & 4.W/970408 Ltr ML17354A4351997-02-28028 February 1997 Monthly Operating Rept for Feb 1997 for Turkey Point,Units 3 & 4.W/970311 Ltr ML17354A4131997-01-31031 January 1997 Monthly Operating Repts for Jan 1997 for Turkey Point,Units 3 & 4.W/970213 Ltr ML17354A3851996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for Turkey Points Units 3 & 4.W/970110 Ltr ML17354A3631996-11-30030 November 1996 Monthly Operating Repts for Nov 1996 for Turkey Point Units 3 & 4.W/961211 Ltr ML17354A3461996-10-31031 October 1996 Monthly Operating Repts for Oct 1996 for Turkey Point,Units 1 & 2.W/961113 Ltr ML17354A2981996-09-30030 September 1996 Monthly Operating Repts for Sept 1996 for Turkey Point Units 3 & 4.W/961014 Ltr ML17353A8831996-08-31031 August 1996 Monthly Operating Repts for Aug 1996 for Turkey Point Units 3 & 4.W/960912 Ltr ML17353A8571996-07-31031 July 1996 Monthly Operating Repts for July 1996 for Turkey Point Plant Units 3 & 4.W/960813 Ltr ML17353A7731996-06-30030 June 1996 Monthly Operating Repts for June 1996 for Turkey Point Units 3 & 4.W/960710 Ltr ML17353A7301996-05-31031 May 1996 Monthly Operating Repts for May 1996 for Turkey Point Units 3 & 4.W/960612 Ltr ML17353A6971996-04-30030 April 1996 Monthly Operating Repts for Apr 1996 for Turkey Point Units 3 & 4.W/960513 Ltr ML17353A6391996-03-31031 March 1996 Monthly Operating Repts for Mar 1996 for Turkey Point Units 1 & 2.W/960415 Ltr ML17353A5971996-02-29029 February 1996 Monthly Operating Repts for Feb 1996 for Turkey Point Units 3 & 4.W/960313 Ltr ML17353A5601996-01-31031 January 1996 Monthly Operating Repts for Jan 1996 for Turkey Points 3 & 4.W/960213 Ltr ML17353A5361995-12-31031 December 1995 Monthly Operating Repts for Dec 1995 for Turkey Point Units 3 & 4.W/960112 Ltr ML17353A4831995-11-30030 November 1995 Monthly Operating Repts for Nov 1995 for Turkey Point Units 3 & 4.W/undated Ltr ML17353A4441995-10-31031 October 1995 Monthly Operating Repts for Oct 1995 for Turkey Point Units 3 & 4.W/951115 Ltr ML17353A4111995-09-30030 September 1995 Monthly Operating Repts for Sept 1995 for Turkey Point Units 3 & 4.W/951012 Ltr ML17353A3541995-08-31031 August 1995 Monthly Operating Repts for Aug 1995 for Turkey Point Units 3 & 4.W/950912 Ltr 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217L9371999-10-20020 October 1999 Safety Evaluation Supporting Licensee Proposed Alternative from Certain Requirements of ASME Code,Section XI for First 10-Yr Interval Request for Relief for Containment Inservice Insp Program ML17355A4471999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Turkey Point,Units 3 & 4.With 991008 Ltr ML17355A4121999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Turkey Point,Units 3 & 4.With 990909 Ltr ML17355A3981999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Turkey Point,Units 3 & 4.With 990809 Ltr ML17355A3891999-07-20020 July 1999 LER 99-001-00:on 990623,manual Rt from 100% Power Following Multiple Control Rod Drops Was Noted.Caused by Manual Action Taken by Reactor Control Operator.Inspected & Repaired Stationary Gripper Regulating Cards.With 990720 Ltr ML17355A3841999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Turkey Point,Units 3 & 4.With 990713 Ltr ML17355A3681999-06-30030 June 1999 Revised Update to Topical QA Rept, Dtd June 1999 ML17355A3611999-06-30030 June 1999 Refueling Outage ISI Rept. ML17355A3511999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Turkey Point,Units 3 & 4.With 990609 Ltr ML17355A3331999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Turkey Point,Units 3 & 4.With 990511 Ltr ML20217B9871999-04-0808 April 1999 Changes,Tests & Experiments Made as Allowed by 10CFR50.59 for Period Covering 971014-990408 ML17355A2881999-04-0505 April 1999 COLR for Turkey Point Unit 4 Cycle 18. ML17355A2911999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Turkey Point,Units 3 & 4.With 990414 Ltr ML17355A2551999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Turkey Point Nuclear Power Plant,Units 3 & 4.With 990315 Ltr ML17355A2261999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for Turkey Point,Units 3 & 4.With 990211 Ltr ML17355A2201999-01-20020 January 1999 Refueling Outage ISI Rept. ML17355A1911998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Turkey Point,Units 3 & 4.With 990112 Ltr ML18008A0461998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Turkey Point,Units 3 & 4.With 981209 Ltr ML17354B1921998-11-18018 November 1998 LER 98-007-00:on 981020,containment Purge Supply,Valve Opened Wider than TS Limit.Caused by Improper Setting of Mechanical Stops.Incorporated Improved Standard Method of Measuring Angular Valve Position Into Sp.With 981118 Ltr ML17354B1891998-11-0909 November 1998 Simulatory Certification Update 2. ML17354B1901998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Turkey Point,Units 3 & 4.With 981112 Ltr ML17354B1591998-10-23023 October 1998 COLR for Turkey Point Unit 3 Cycle 17. ML17354B1361998-10-16016 October 1998 LER 98-004-00:on 980921,automatic Reactor Trip Occurred. Caused by Inadequate re-correlation of Intermediate Range Neutron Flux Instrumentation Reactor Trip Bistable. Enhanced Applicable Plant Procedures.With 981016 Ltr ML17354B1311998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Turkey Point Unit 3 & 4.With 981012 Ltr ML17354B0971998-09-0909 September 1998 Part 21 Rept Re Possible Machining Defect in Certain One Inch Stainless Steel Swagelok Front Ferrules,Part Number SS-1613-1.Caused by Tubing Slipping Out of Fitting at Three Times Working Pressure of Tubing.Notified Affected Utils ML17354B0981998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Turkey Points,Units 3 & 4.With 980915 Ltr ML17354B0771998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Turkey Point,Units 3 & 4.W/980810 Ltr ML17354B0341998-07-15015 July 1998 LER 98-003-00:on 980619,discovered That Auxiliary Feedwater Sys Was Inoperable Due to Inadequate Inservice Testing of Valves.Caused by Misunderstanding of Testing Criteria.Util Revised Procedures & Verified Operability of Valves ML17354B0241998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Turkey Point,Units 3 & 4.W/980709 Ltr ML17354B0171998-06-29029 June 1998 Rev 1 to PTN-FPER-97-013, Evaluation of Turbine Lube Oil Fire. ML17354A9841998-06-18018 June 1998 LER 97-007-01:on 970730,automatic Reactor Trip Occurred Due to Closure of B Msiv.Caused by Failed BFD22S Relay.Six Relays on 3A,3B & 3C MSIVs Were Replaced & Implemented Plant Change to Disable Electronic Trip Function on 3 AFW Pumps ML17354A9741998-06-0909 June 1998 LER 98-002-00:on 980513,discovered Potential LOCA-initiated Electrical Fault Which Places ECCS Outside Design Basis. Caused by Inadequate Review of Effect on non-safety Circuit failures.Re-powered PC-*-600A Relays ML20248F7441998-05-31031 May 1998 Reactor Vessel Working Group,Response to RAI Regarding Reactor Pressure Vessel Integrity ML17354A9711998-05-31031 May 1998 Monthly Operating Repts for Turkey Point,Units 3 & 4. W/980611 Ltr ML17354A9231998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Turkey Point,Units 3 & 4.W/980511 Ltr ML17354A8821998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Turkey Point,Units 3 & 4.W/980409 Ltr ML17354A8511998-03-24024 March 1998 LER 97-009-01:on 971114,discovered That CR Console Switch for 3B Sgfp Was Not in Start Position.Caused by Inadequate Procedural Guidance.Revised Procedures 3/4-OP-074,informed Personnel of Event & Performed Walkdown of CR ML17354B0001998-03-18018 March 1998 Florida Power & Light Topical Quality Asurance Rept, Dtd June 1998 ML17354A8441998-03-18018 March 1998 LER 98-001-00:on 980216,manual Reactor Trip Occurred Due to Loss of Turbine Control Oil Pressure W/Steam Leak in Auxiliary Feedwater Steam Supply Piping.Auxiliary Governor Maint Instructions Will Be revised.W/980318 Ltr ML17354A8311998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Turkey Point,Units 3 & 4.W/980311 Ltr ML17354A7871998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Turkey Point,Units 3 & 4.W/980209 Ltr ML17354A7581997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Turkey Point,Unit 3 & 4.W/980112 Ltr ML17354A7361997-12-12012 December 1997 LER 97-009-01:on 971114,identified That CR Console Switch for 3B SG Feedwater Pump Was Not in Start Position.Caused by Inadequate Procedural Guidance.Procedures 3/4-OP-074,SGFP Were revised.W/971212 Ltr ML17354A7381997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Turkey Point,Units 3 & 4.W/971215 Ltr ML17354A7211997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Turkey Point,Units 3 & 4.W/971114 Ltr ML17354A7491997-10-13013 October 1997 SG Insp Rept. ML17354A8851997-10-13013 October 1997 FPL Units 3 & 4 Changes,Tests & Experiments Made as Allowed by 10CFR50.59 for Period Covering 960408-971013. ML17354A6801997-10-0808 October 1997 LER 97-008-00:on 970909,containment Sump Debris Screens Outside Design Basis Due to Stress Damage Was Discovered. Caused by Inadequate Procedural Guidance & Personnel Error. Discrepancies Found on Screens corrected.W/971008 Ltr ML17354A6791997-10-0606 October 1997 COLR Unit 4 Cycle 17, for Turkey Point ML17354A6811997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Turkey Point,Units 3 & 4.W/971009 Ltr 1999-09-30
[Table view] |
Text
ACCELERATED DISI'RIBUTION DEMON r>TION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)ACCESSION NBR:8912220068 DOC.DATE:~8:~0 NOTARIZED:
NO FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 50-251 Turkey Point Plant,'nit 4., Florida Power and Light C AUTH.NAME AUTHOR AFFILIATION BONETT,D.M.
Florida Power 6 Light Co.HARRIS,K.N.
Florida Power 6 Light Co.RECIP.NAME
.RECIPIENT AFFILIATION DOCKET 05000250 05000251.
SUBJECT:
Monthly'ng repts for Nov 1989 for Turkey Point Units 3 6 4/891215 ltr.DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE: TITLE: Monthly Operating Report (per Tech Specs)NOTES: RECIPIENT ID CODE/NA'ME PD2-.2 LA EDISON,G INTERNAL: AEOD/DOA IRM TECH ADV NRR/DOEA/OEAB11 NUDOCS-ABSTRACT RGN2 EXTERNAL EGGG S IMPSON I F NRC PDR COPIES LTTR ENCL.3 3 1 1 1 1 2 2 1 1 1 1 1 1 1" 1 1 1 RECIPIENT ID CODE/NAME PD2-2 PD AEOD/DSP/TPAB NRR/DLPQ/LPEB10 PB11'EG FI 01 LPDR NSIC COPIES LTTR ENCL 1 1 1'.1.1 1 1 1 1 1'1 1 NOTE TO ALL"RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTEI CONTACT THE.DOCUMENT CONTROL DESK, ROOM PI-37 (EXT.20079)TO ELIMINATE YOUR NAME FROM DISTRIBUTION'ISIS FOR DOCUMENTS YOU DON'T NEEDl TOTAL'NUMBER OF COPIES REQUIRED: LTTR 19 ENCL 19 ik 0 JOE~>>/~4~P p J)J p P" I 0 I I'~~
P.O.Box14000,Juno Beach, FL 33408-0420 OECEMBER 1 5~989 L-89-444 10 CFR 50.36 U.S.Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C.20555 Gentlemen:
RE: Turkey Point Units 3 and 4 Docket Nos.50-250 and 50-251 Monthl 0 eratin Re ort Attached are the November 1989 Operating Status Reports and Summary of Operating Experience Reports for Turkey Point Units 3 and 4.Very truly yours, Harris Vic President Turkey Point Plant Nuclear KNH/DMB Attachments cc: Stewart D.Ebneter, Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant 3912220063 39ii30 PDR ADOCK 05000250 PDC an FPL Group company
AVERAGE DAILY'NIT POWER DOCKET NO.'50-250 UNIT Turke Point 3 DATE December 15 1989 COMPLETED BY D.M.Bonett TELEPHONE 407 694-4432 MONTH November 1989 DAY AVERAGE DAILY POWER'EVEL (MWe-Net):l'1/1/89 il/2/89'1/3/89 11/4/89:l 1/5/89 1:l/6/89 11/.7/89 11/8/8'9:li/9/89 11/1'8/89:li/11/89 11/12/89 11/1'3/89 11/14/89:l1/15/89 1 l/16/89 11/17/89 11/1'8/89 li/19/89 1'1/20/89 1'1/2:l/89'l/22/89 11/23/89 1:l/24/89 11/25/89 11/26/89-11/27/89 il/28/89:l'1/29/89 il/30/89 678 675 674 678 674 6'72 67'6 676 676 hl9 484 68()687 688 684 688 685 698'695 691 689 686 683 686 69 1'87 680 677 677.681 GPI=.:RAT:I:HG STATUS OFERA'IIHC DATA REFORT DOCKI"=T NG 50-258 DA TF..12/15/89 COVFLETED E:Y D.N, aGNETT TF.:LI:-.PHOIVE 407/694/4432 1, UHXT HhHE;TURKEY F'0 I HT UH1T 3 2 i RI=..F'GRTING PER:I:OD i NGVEHll'ER 1989 3, LICENSED THEfiXAI..
FOMER<VMT>: 220<)'NANI:-:PL.ATE RhT:l:N(;(GROSS MME): 76()DES:I:GN'ELECTf<TChL RAT:I:HG<NET HME): 693 b.WAXXVUX DI=PEHDABLE CAF'ACITY (GROSS NHE.>:.699 7.HAXXHUH DEPENDABLE CAPACITY (HET YiHE>: 666 8 IF CHAN(".ES GCCUI'N CAPACITY RATINGS (ITEMS NIJHE'ER 3 THROUGH 7)S:l:HCE LAST'REF'ORT t GIVE RL".ASONS+
POWER LF'Vl='L TO WHICH RESTRICTL".D
~XF ANY (NET HHE)10, REhSGHB FOR RESTRICTIONS TF ANY: MONTHLY-YTD-CUMULATIVE 11.HOURS XN RFPORT F'ERIGD: 12, NUxaFR OF I-IGURS REACTOR HAS CRITICAL 13, I'EAC'I'OR RESERVI=SHUTDOWN HOURS l4.I.IGURS GENERATOR GN-L:I:NF 15~IJNXT RI=SERVE SHUTDOWN I.IOURS 16~GfiGSS THERMAL ENERGY GENFRATED (HWIH)17.GROSS ELFCTRXCAL ENERGY GENERATED<NWH)18~HET L.LEG Tf<XCAL ENERGY GENERATED (NMH)UH:I:T SERVII:E FACTOR 2(), (JNXT A VAXLhBXLXTY FACTOR 21 CAF'ACITY FACTOR<USING HDC NI=T)22 o'CAF'ACITY FACTOR (USING DFR NET)23.UHXT FORCED OUTAGE RATE 24~SHUTDOWNS SCI-IEDULED OVER NEXT 6 MONTHS 2/15/90~RFFUEI ING 720 720iO OiO 720+0 OiO 1565712 506520 482959 1<)Oi 0 1()0i0 1()e+7 96 i 8 OiO 8016 5062+5 OiO 4960ib OoO 1029358l 3294378 3106297 61+9 blo9 58i2 55i9 17ib 148929.6 98446+2 844 F 4 97118iO 121i8 201487330 64556896 ble36841 65+2 65.3 62i8 59 1 13ie 25~XF SI.IUT DOWN AT END OF RFPORT F'ERIGD r ESTIMATED DATE OF STARTUF':
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.UNIT NAME Turke Poi t REPORT MONTH N COMPLETED BY 0.M TELEPHONE 407 694-.4432 No.Date Type'uration (K ours)Reason~Method of Shutting Down Reactor Ucensee Event Reports'ystem Code4 Component Code'ause&Corrective Actionto Prevent Recurrence 12 891110 0.0 HA TURBIN Unit 3 reduced power to perform a turbine va1ve test.Power reduction was extended to perform B-North and B-South Materbox Amertap Screen Inspections.
Ful1 power operation was resumed.F Forced S Scheduled Reason A-Equipment Failure (Explain)B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training&Ucense Examination F-Administrative G-Operational Error (Explain)H-Other (Explain)Method 1-Manual 2-Manual Scram 3-Automatic Scram 4-Continued 5-Load Reduction 9-Other(Exphin)
ExhMG-Instructions for Preparation of Data Entry Scheets Ucensee Event Report(LER)
Rle (NUREG4161)
Exhibit 1-Same Source 4k
SUMMARY
'OF OPERATING EXPERIENCE" DOCKET NO.50-250 UNIT Turke Point 3 DATE December 15 1989 COMPLETED BY D.M.Bonett TELEPHONE 407 694-4432 REPORT MONTH November 1989 Unit 3 reduced, power to perform a turbine valve test.Full power operation was resumed.
AVERAGE DA1LY UNIT POWER DOCKET NO.50-251 UNIT Turke Point 4 DATE December 15 1989 COMPLETED BY D.M.Bonett TELEPHONE 407 694-4432 MONTH November 1989 DAY AVERAGE DAILY POWER (MWe-Net)11/1/89 11/2/89'i/3/89 I.'/4/89 li/5/89 11/6/89 11/7/89 11/8/89 11/9/89 11/10/89 li/11/89 11/12/89 li/13/89 11/14/89 li/15/89 11/16/89 il/17/89 11/18/89'1/19/89 11/20/89 li/21/89 11/22/89 1 1/23/89 il/24/89 11/25/89 I.1/26/89 li/27/89 il/28/89 li/29/89 11/30/89 674 673 674 678 675 672 676 677 ,676 673 678 677 683 683 679 677 685'695 695 689 685 684 683 686 692 689 618 597 680 684 4 OPE".RATING STAT(JS QF'ERA'I'IHG DhTA REF'ORT DQCI(I="T NO 50 25.l DA TI.12/15/S9 COMPLETED E'Y D.H+B(3HE:TT TF.:LEPI.IQHE 487/694/4432 i.UNIT NAME:;TUR!,EY FQIHT UNIT 4 2+REP(3RTING PER:KQD+H(3VLME'ER 1989 3+L:KCE:HSED THERHAI..F'OWER<HWT)+2200 NAMEPLATE RATING (GROSS HWE): 76O DESIGN ELF.:C'I'R:KChL RAT:KHG<,NET MWE):.693 6+HAX:KHUH DEF EHDAI3LE CAI'ACXTY<GR'(3SS HWI"=): 699 7, MAXIMUM Dl='PE:NDABLE CAPACITY (HET HWE);666 8 II-" CHAN("E!v OCCUR IN CAPACITY RATINGS<XTEHS NUMEtER 3'I'HROUGI I 7).TNCE L'A..T REF'ORT.GIVE RFASQHS;POWE:R LFVI=..L TO WHXCI-I RESTRICTFD
~IF ANY (NET HWF):lO.'REASOHS FOR RESTRI(3TIONS~
IF AHY: HONTHI Y-YTD-CUHUI..ATIVE 11, HOlJRS IN REPOR1ERXODl 12 i NUMBE:R OF I.IQURS REACTQR WAS CRITICAL:l3~I'EACTOR RE!EI'VL=SHUTDOWN HOURS 14~I.IQURS GENERATOR OH-LINF 15)UN:KT RESERVE SHUTDOWN..HOURS
- le Gf'OSS THFRMAL F.:NFRGY GFHFRATED (MWH)17'ROSS ELFCTR:KCAL ENERGY GENERATED (HWH)'1 8, HET FLEC1'RICAL ENERGY GENERATED (HWH):.(9.i UH:KT SERVX(3E FACTOR 20.UH:KT A VA:KLABXLITY FACTOR 21 i CAI='ACXTY FACTOR (USING HDC NET)22'AF'ACX'I'Y FACTOR (USXNG DFR NFT)23.UN:KT.FORCED OUTAGE RATE 24 i SH(JTDQWNS SCI-IEDULED OVFR NEXT 6 HONTI-IS 720 720.0 0+0 720'OiO 1575762 510170 486876 leo,e 1<)0i0 101 i 5 97+6 0 i 0 8016 3580'0 i 0 3037i2 0+0 5996647 1882929 1746582 37i9 37.9 3217 31 i4.26.2 142661iO 93736+7 166 ib 9e231.3 321 190079067 60631731 57329841 63.2 63+3 61+5 58iO.12+0 25~IF SHUT DOWN, AT'END OF RFF'ORT F'ERI(3D~ESTIMATED DATE OF'STARTUF,'.:
lg I iq UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.50-251 REPORT MONTH DATE December 15 1989', COMPLETED BY Date Type'uration (Hours)Reason~Method of Shutting Down Reactor Licensee Event Reports System Code i Component Codes Cause 8 Corrective Action to Prevent Recurrence Unit 4 had no shutdowns or significant power reductioris.
F Forced S SchedWed Reason A-Equipment Failure(Explain)
B-Maintenance or Test C-Refueling D-Reguhtory Restriction E-.Operator Training&Ucense Examination F-Administrative G-Operational Error (Explain)H-Other (Exphin)Method 1-Manual 2-Manual Scram 3-Automatic Scram 4-Continued 5-Load Reduction 9-Other(Explain)
Exhibit G-instructions for Preparation of Data Entry Scheets Licensee Event Report(LER)
File (NURE&0161)Exhibit 1-Same Source SUMKQtY OF OPERATING EXPERIENCE DOCKET NO 50-251 UNIT Turke Point 4 DATE December 15 1989 COMPLETED BY D.M.Bonett TELEPHONE 407 694-4432 REPORT MONTH November 1989 Unit 4 had no shutdowns or significant power reductions.
E I n