Monthly Operating Repts for Nov 1989 for Turkey Point Units 3 & 4.W/891215 Ltr
ML17347B477
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 11/30/1989
From: Bonett D, Harris K
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
L-89-444, NUDOCS 8912220068
Download: ML17347B477 (16)


Text

ACCELERATED DISI'RIBUTION DEMON TION SYSTEM r>

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:8912220068 DOC.DATE: ~8  : ~0 FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and NOTARIZED: NO DOCKET Light C 05000250 50-251 Turkey Point Plant,'nit 4., Florida Power and Light C 05000251 AUTH. NAME AUTHOR AFFILIATION BONETT,D.M. Florida Power 6 Light Co.

HARRIS,K.N. Florida Power 6 Light Co.

RECIP.NAME . RECIPIENT AFFILIATION

SUBJECT:

Monthly 'ng repts for Nov 1989 for Turkey Point Units 3 6 4 /891215 ltr.

DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NA'ME LTTR ENCL. ID CODE/NAME LTTR ENCL PD2-.2 LA 3 3 PD2-2 PD 1 1 EDISON,G INTERNAL: AEOD/DOA IRM TECH ADV 1

1 2

1 1

2 AEOD/DSP/TPAB NRR/DLPQ/LPEB10 1'.

1. 1 NRR/DOEA/OEAB11 1 1 PB11 1 1 NUDOCS-ABSTRACT 1 1 'EG FI 01 1 1 RGN2 1 1 EXTERNAL EGGG S IMPSON I F 1" 1 LPDR 1' NRC PDR 1 1 NSIC 1 1 NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTEI CONTACT THE. DOCUMENT CONTROL DESK, ROOM PI-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION'ISIS FOR DOCUMENTS YOU DON'T NEEDl TOTAL 'NUMBER OF COPIES REQUIRED: LTTR 19 ENCL 19

0 JOE / ~ 4 p ik

~

~P J)

J P" I p 0 I '

~

I ~

P.O. Box14000,Juno Beach, FL 33408-0420 OECEMBER 1 5 ~989 L-89-444 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Gentlemen:

RE: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Monthl 0 eratin Re ort Attached are the November 1989 Operating Status Reports and Summary of Operating Experience Reports for Turkey Point Units 3 and 4.

Very truly yours, Harris Vic President Turkey Point Plant Nuclear KNH/DMB Attachments cc: Stewart D. Ebneter, Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant 3912220063 PDR 39ii30 ADOCK 05000250 PDC an FPL Group company

AVERAGE DAILY'NITPOWER DOCKET NO. '50-250 UNIT Turke Point 3 DATE December 15 1989 COMPLETED BY D. M. Bonett TELEPHONE 407 694-4432 MONTH November 1989 DAY AVERAGE DAILY POWER'EVEL (MWe-Net)

l'1/ 1/89 678 il/ 3/89 2/89'1/

675 674 11/ 4/89 678

l 1/ 5/89 674 1:l/ 6/89 6'72 11/ .7/89 67'6 11/ 8/8'9 676
li/ 9/89 676 11/1'8/89 hl9
li/11/89 484 11/12/89 68()

11/1'3/89 687 11/14/89 688

l1/15/89 684 1 l /16/89 688 11/17/89 685 11/1'8/89 698 li/19/89 '695 1'1/20/89 691 1'1/2:l 689

/89'l/22/89 686 11/23/89 683 1:l/24/89 686 11/25/89 69 11/26/89- 1'87 11/27/89 680 il/28/89 677

l'1/29/89 677 .

il/30/89 681

OFERA'IIHC DATA REFORT DOCKI"=T NG 50 258 DA TF.. 12/15/89 COVFLETED E:Y D. N, aGNETT TF.:LI:-.PHOIVE 407/694/4432 GPI=.:RAT:I:HG STATUS 1, UHXT HhHE; TURKEY F'0 I HT UH1T 3 2 i RI=..F'GRTING PER:I:OD i NGVEHll'ER 1989 3, LICENSED THEfiXAI.. FOMER <VMT>: 220<)

'NANI:-:PL.ATE RhT:l:N(; ( GROSS MME ): 76()

DES:I:GN 'ELECTf<TChL RAT:I:HG <NET HME): 693

b. WAXXVUX DI=PEHDABLE CAF'ACITY (GROSS NHE.>: . 699
7. HAXXHUH DEPENDABLE CAPACITY (HET YiHE>: 666 8 IF CHAN(".ES GCCUI 'N CAPACITY RATINGS ( ITEMS NIJHE'ER 3 THROUGH 7)

S:l:HCE LAST 'REF'ORT t GIVE RL".ASONS+

POWER LF'Vl='L TO WHICH RESTRICTL".D ~ XF ANY ( NET HHE )

10, REhSGHB FOR RESTRICTIONS TF ANY:

MONTHLY YTD- CUMULATIVE

11. HOURS XN RFPORT F'ERIGD: 720 8016 148929.6 12, NUxaFR OF I-IGURS REACTOR HAS CRITICAL 720iO 5062+5 98446+2 13, I'EAC'I'OR RESERVI= SHUTDOWN HOURS OiO OiO 844 4 F

l4. I.IGURS GENERATOR GN-L:I:NF 720+0 4960ib 97118iO 15 ~ IJNXT RI=SERVE SHUTDOWN I.IOURS OiO OoO 121i8 16 ~ GfiGSS THERMAL ENERGY GENFRATED (HWIH) 1565712 1029358l 201487330

17. GROSS ELFCTRXCAL ENERGY GENERATED <NWH) 506520 3294378 64556896 18 ~ HET L.LEG Tf<XCAL ENERGY GENERATED ( NMH ) 482959 3106297 ble36841 UH:I:T SERVII:E FACTOR 1<)Oi 0 61+9 65+2 2(), (JNXT A VAXLhBXLXTY FACTOR 1()0i0 blo9 65.3 21 CAF'ACITY FACTOR < USING HDC NI=T) 1()e+ 7 58i2 62i8 22 o 'CAF'ACITY FACTOR ( USING DFR NET ) 96 i 8 55i9 59 1
23. UHXT FORCED OUTAGE RATE OiO 17ib 13ie 24 ~ SHUTDOWNS SCI-IEDULED OVER NEXT 6 MONTHS 2/15/90 ~ RFFUEI ING 25 ~ XF SI.IUT DOWN AT END OF RFPORT F'ERIGD r ESTIMATED DATE OF STARTUF':

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

UNIT NAME Turke Poi t COMPLETED BY 0. M REPORT MONTH N TELEPHONE 407 694-.4432 Method of No. Date Type'uration (Kours) Reason~

Shutting Down Reactor Ucensee Event Reports'ystem Code4 Code'ause Component

& Corrective Actionto Prevent Recurrence 12 891110 0.0 HA TURBIN Unit 3 reduced power to perform a turbine va1ve test. Power reduction was extended to perform B-North and B-South Materbox Amertap Screen Inspections. Ful1 power operation was resumed.

F Forced Reason Method ExhMG-Instructions S Scheduled A - Equipment Failure (Explain) 1 - Manual for Preparation of Data B - Maintenance or Test 2 - Manual Scram Entry Scheets Ucensee C - Refueling 3 - Automatic Scram Event Report(LER) Rle D - Regulatory Restriction 4 - Continued (NUREG4161)

E - Operator Training & Ucense Examination 5 - Load Reduction F - Administrative 9 - Other(Exphin)

G - Operational Error (Explain) Exhibit 1-Same Source H - Other (Explain)

4k

SUMMARY

'OF OPERATING EXPERIENCE" DOCKET NO. 50-250 UNIT Turke Point 3 DATE December 15 1989 COMPLETED BY D. M. Bonett TELEPHONE 407 694-4432 REPORT MONTH November 1989 Unit 3 reduced, power to perform a turbine valve test. Full power operation was resumed.

AVERAGE DA1LY UNIT POWER DOCKET NO. 50-251 UNIT Turke Point 4 DATE December 15 1989 COMPLETED BY D. M. Bonett TELEPHONE 407 694-4432 MONTH November 1989 DAY AVERAGE DAILY POWER (MWe-Net) 11/ 1/89 674 11/ 673 3/89 2/89'i/

674 I.' / 4/89 678 li/

11/ 6/89 5/89 675 672 11/ 7/89 676 11/ 8/89 677 11/ 9/89 ,676 11/10/89 673 li/11/89 678 11/12/89 677 li/13/89 683 11/14/89 683 li/15/89 679 11/16/89 677 il/17/89 685

'695 11/18/89'1/19/89 695 11/20/89 689 li/21/89 685 11/22/89 684 1 1/23/89 683 il/24/89 686 11/25/89 692 I. 1/26/89 689 li/27/89 618 il/28/89 597 li/29/89 680 11/30/89 684

4 QF'ERA'I'IHG DhTA REF'ORT DQCI(I="T NO 50 25 .l DA TI. 12/15/S9 COMPLETED E'Y D. H+ B(3HE:TT TF.:LEPI.IQHE 487/694/4432 OPE".RATING STAT(JS

i. UNIT NAME:; TUR!,EY FQIHT UNIT 4 2+ REP(3RTING PER:KQD+ H(3VLME'ER 1989 3+ L:KCE:HSED THERHAI.. F'OWER < HWT ) + 2200 NAMEPLATE RATING ( GROSS HWE ): 76O DESIGN ELF.:C'I'R:KChL RAT:KHG <,NET MWE ): . 693 6+ HAX:KHUH DEF EHDAI3LE CAI'ACXTY < GR'(3SS HWI"= ): 699 7, MAXIMUM Dl='PE:NDABLE CAPACITY ( HET HWE ); 666 8 II-" CHAN("E!v OCCUR IN CAPACITY RATINGS < XTEHS NUMEtER 3 'I'HROUGI I 7 )

. TNCE L'A..T REF'ORT . GIVE RFASQHS; POWE:R LFVI=..L TO WHXCI-I RESTRICTFD ~ IF ANY (NET HWF)

lO. 'REASOHS FOR RESTRI(3TIONS~ IF AHY:

HONTHI Y YTD- CUHUI..ATIVE 11, HOlJRS IN REPOR1ERXODl 720 8016 142661iO 12 i NUMBE:R OF I.IQURS REACTQR WAS CRITICAL 720.0 3580' 93736+7

l3 ~ I 'EACTOR RE! EI'VL= SHUTDOWN HOURS 0+0 0 i0 166 ib 14 ~ I.IQURS GENERATOR OH-LINF 720' 3037i2 9e231.3
15) UN:KT RESERVE SHUTDOWN..HOURS OiO 0+0 321
le Gf'OSS THFRMAL F.:NFRGY GFHFRATED (MWH) 1575762 5996647 190079067 17 'ROSS ELFCTR:KCAL ENERGY GENERATED (HWH) 510170 1882929 60631731

'1 8, HET FLEC1'RICAL ENERGY GENERATED ( HWH ) 486876 1746582 57329841

.(9.i UH:KT SERVX(3E FACTOR leo,e 37i9 63.2
20. UH:KT A VA:KLABXLITYFACTOR 1<)0i0 37.9 63+3 21 i CAI='ACXTY FACTOR (USING HDC NET) 101 i 5 3217 61+5 22'AF'ACX'I'Y FACTOR (USXNG DFR NFT) 97+6 31 i4 58iO
23. UN:KT. FORCED OUTAGE RATE 0 i0 . 26.2 . 12+0 24 i SH(JTDQWNS SCI-IEDULED OVFR NEXT 6 HONTI-IS 25 ~ IF SHUT DOWN, AT 'END OF RFF'ORT F'ERI(3D ~ ESTIMATED DATE OF 'STARTUF,'.:

lg I

iq

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50- 251 DATE December 15 1989 ',

COMPLETED BY REPORT MONTH Method of Shutting Licensee Cause 8 Corrective Down Event System Component Action to Date Type'uration (Hours) Reason~ Reactor Reports Code i Codes Prevent Recurrence Unit 4 had no shutdowns or significant power reductioris.

F Forced Reason Method Exhibit G-instructions S SchedWed A - Equipment Failure(Explain) 1 - Manual for Preparation of Data B - Maintenance or Test 2 - Manual Scram Entry Scheets Licensee C - Refueling 3 - Automatic Scram Event Report(LER) File D - Reguhtory Restriction 4 - Continued (NURE&0161)

E -. Operator Training & Ucense Examination 5 - Load Reduction F - Administrative 9 - Other(Explain)

G - Operational Error (Explain) Exhibit 1-Same Source H - Other (Exphin)

SUMKQtY OF OPERATING EXPERIENCE DOCKET NO 50-251 UNIT Turke Point 4 DATE December 15 1989 COMPLETED BY D. M. Bonett TELEPHONE 407 694-4432 REPORT MONTH November 1989 Unit 4 had no shutdowns or significant power reductions.