Monthly Operating Repts for Sept 1991 for Turkey Point,Units 3 & 4.W/911014 Ltr
ML17348B182
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 09/30/1991
From: LEONARD C M, PLUNKETT T F
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
L-91-273, NUDOCS 9110210305
Download: ML17348B182 (18)


Text

ACCELERATED DI UTION DEMONSTTION SYSTEM 4 1'~REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)ACCESSION NBR:9110210305 DOC.DATE: M~~NOTARIZED:

NO DOCKET FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 05000250 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 AUTH.NAME AUTHOR AFFILIATION LEONARD,C.M.

Florida Power&Light Co.PLUNKETT,T.F.

Florida Power&Light Co.RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly o'ng repts for Sept.1991 for Turkey Point, Units 3&4-.W 11014 tr.DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR I ENCL!SIZE: TITLE: Monthly Operating Report (per Tech Specs)NOTES D RECIPIENT ID CODE/NAME PD2-2 LA AULUCK,R INTERNAL: AEOD/DOA NRR/D WREB10 RE~E 1 EXTERNAL EG&G BRYCE i J~H NSIC COPIES LTTR ENCL 3 3 1 1 1 1 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME PD2-2 PD AEOD/DSP/TPAB NRR/DOEA/OEAB RGN2 NRC PDR COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 1 D D D NOTE TO ALL"RIDS" RECIPIENTS:

D D PLEASE HELP US TO REDUCE WASTE!CONTACT THE DOCUMENT CONTROL DESK ROOM P 1-37 (EXT.20079)TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISIS FOR DOCUMENTS YOU DON'T NEED!TOTAL NUMBER OF COPIES REQUIRED: LTTR 14 ENCL 14

~'I P.O.Box 029100, Miami, FL, 33102-9100 POT 14$91 L-91-273 10 CFR 50'6 U.S.Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C.20555 Gentlemen:

RE: Turkey Point Units 3 and 4 Docket Nos.50-250 and 50-251 Monthl 0 eratin Re ort In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of NUREG 0020, attached are the September 1991 Operating Status and Summary of Operating Experience Reports for Turkey Point Units 3 and 4.Very truly yours, T.F.Plunkett Vice President Turkey Point Nuclear TFP/DRP/CML attachments cc: Stewart D.Ebneter,, Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant 9ii02i0305 910930 PDR ADOCK 05000250 R PDR an FPL Gcoop company>r>q I)

IO r I l E.I' AVERAGE'AILY UNIT POWER LEVEL DOCKET NO.50-250 UNIT Turke Point 3 DATE October 7 1991 COMPLETED BY C.M.Leonard TELEPHONE 305 246-7103 MONTH Se tember 1991 AVERAGE DAILY POWER'LEVEL (MWe-Net)09/01/91 09/02/91 09/03/91 09/04/91 09/05/91 09/06/91 09/07/91 09/08/91 09/09/91 09/10/91 09/11/91 09/12/91 09/13/91 09/14/91 09/15/91 09/16/91 09/17/91 09/18/91 09/19/91 09/20/91 09/21/91.09/22/91 09/23/91 09/24/91 09/25/91 09/26/91 09/27/91 09/28/91 09/29/91 09/30/91 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 OPERATING DATA REPORT OPERATING STATUS DOCKET NO 50-250 DATE 10/7/91 COMPLETED BY C.M.LEONARD TELEPHONE 305/246/7103 l.UNIT NAME: TURKEY POINT UNIT 3 2.REPORTING PERIOD:SEPTEMBER 1991 3.LICENSED THERMAL POWER (MWT): 2200 4.NAMEPLATE RATING (GROSS MWE): 760 5.DESIGN ELECTRICAL RATING (NET MWE): 693 6.MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 699 7.MAXIMUM DEPENDABLE CAPACITY (NET MWE): 666 8.IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)SINCE LAST REPORT, GIVE REASONS: 9.POWER LEVEL TO'HICH RESTRICTED'F ANY (NET MWE)10.REASONS FOR RESTRICTIONS, IF ANY: MONTHLY-YTD-CUMULATIVE 11.HOURS IN REPORT PERIOD: 12.NUMBER OF HOURS REACTOR WAS CRITICAL 13.REACTOR RESERVE SHUTDOWN HOURS 14.HOURS GENERATOR ON-LINE 15.UNIT RESERVE SHUTDOWN HOURS 16.GROSS THERMAL ENERGY GENERATED (MWH)17.GROSS ELECTRICAL ENERGY GENERATED (MWH)18.NET ELECTRICAL ENERGY GENERATED (MWH)19.UNIT SERVICE FACTOR 20.UNIT AVAILABILITY FACTOR 21.CAPACITY FACTOR (USING MDC NET)22.CAPACITY FACTOR (USING DER NET)23.UNIT FORCED OUTAGE RATE 24.SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS 720 60.9 0.0 0.0 0.0 0 0-9020 0.0 0.0 0.0 0.0 0.0 6551 60.9 0.0 0.0 0.0 0 0-17478 0.0 0.0 0.0 0.0 0.0 164984.6 104534.1 844.4 103055.7 121.8 214231642 68615991 64861040 62.5 62.5 60.2 56.7 12.5 25.IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: 10/04/91 Ik

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.50-250'NIT Turke Point 3 DATE October 7 1991 COMPLETED BY C.M.Leonard TELEPHONE 305 246-7103 REPORT MONTH Se tember 1991 Unit 3 was.shutdown on December 12, 1990 for a scheduled Upgrades Outage.

UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH September 1991 DOCKET NO.UNIT NAME Turkey Point¹3 DATE October 7, 1991 COMPLETED BY C.M.Leonard TELEPHONE 305 246-7103 Date Type'uration (Hours)Reason~Method of Shutting Down Reactor Licensee Event Reports System Code4 Component Codes Cause 8 Corrective Actionto PreventRecurrence 22 901212 S 720 H N/A EB Engine Unit 3 was shutdown for scheduled Upgrades Outage.F Forced S Scheduled Reason A-Equipment Failure(Explain) 8-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training 8 Ucense Examination F-Administrative G-Operational Error (Explain)H-Other (Explain)Method 1-Manual 2-Manual Scram 3-Automatic Scram 4-Continued 5-Load Reduction 9-Other (Explain)Exhibit G-Instructions for Preparation of Data Entry Scheets Ucensee Event Report (LER)File (NUREG<161)

Exhibit 1-Same Source (Ql 0~f AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.50-251 UNIT Turke Point 4 DATE October 7 1991 COMPLETED BY C.M.Leonard TELEPHONE 305 246-7103 MONTH Se tember 1991 AVERAGE DAILY POWER LEVEL (MWe-Net)09/01/91 09/02/91 09/03/91 09/04/91 09/05/91 09/06/91 09/07/91 09/08/91 09/09/91 09/10/91 09/11/91 09/12/91 09/13/91 09/14/91 09/15/91 09/16/91 09/17/91 09/18/91 09/19/91 09/20/91 09/21/91 09/22/91 09/23/91 09/24/91 09/25/91 09/26/91 09/27/91 09/28/91 09/29/91 09/30/91 i~i~'):J OPERATING DATA REPORT OPERATING STATUS DOCKET NO 50-251 DATE 10/7/91 COMPLETED BY C.M.LEONARD TELEPHONE 305/246/7103 l.UNIT NAME: TURKEY POINT UNIT 4 2.REPORTING PERIOD:SEPTEMBER 1991 3.LICENSED THERMAL POWER (MWT): 2200 4.NAMEPLATE RATING (GROSS MWE): 760 5.DESIGN ELECTRICAL RATING (NET MWE): 693 6.MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 699 7.MAXIMUM DEPENDABLE CAPACITY (NET MWE): 666 8.IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)SINCE LAST REPORT, GIVE REASONS: 9.POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE)10.REASONS FOR RESTRICTIONS, IF ANY: MONTHLY-YTD-CUMULATIVE 11.HOURS IN REPORT PERIOD: 12.NUMBER OF HOURS REACTOR WAS CRITICAL 13.REACTOR RESERVE SHUTDOWN HOURS 14.HOURS GENERATOR ON-LINE 15.UNIT RESERVE SHUTDOWN HOURS 16.GROSS THERMAL ENERGY GENERATED (MWH)17.GROSS ELECTRICAL ENERGY GENERATED (MWH)18.NET ELECTRICAL ENERGY GENERATED (MWH)19.UNIT SERVICE FACTOR 20.UNIT AVAILABILITY FACTOR 22.CAPACITY FACTOR (USING DER NET)23.UNIT FORCED OUTAGE RATE 24.SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS 720 0.0 0.0 0.0 0.0 0 0-1881 0.0 0.0 0.0 0.0 0.0 655 I 0.0 0.0 0.0 0.0 0 0-9911 0.0 0.0 0.0 0.0 0.0 158716.0 101186.4 166.6 97567.1 32.1 205630060 65612880 62043717 61.5 61.5 59.8 56.4 11.9 25.IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: 11/04/91

~0

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.50-251 UNIT Turke Point 4 DATE October 7 1991 ,COMPLETED BY C.M.Leonard TELEPHONE 305 246-7103 REPORT MONTH Se tember 1991 Unit 4 was shutdown for a scheduled Upgrades and Refueling Outage on November 24, 1990.

~~

UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH Se tember 1991 DOCKET NO.50 251 Turke Point¹4 DATE, October 7 1991,~COMPLETED BY C.M.Leonard TELEPHONE (305)246-7103 No.Date Type Duration (Hours)Reason2 Method of Shutting Down Reactor Licensee Event Report¹System Code4 Component Codes Cause 8 Corrective Action to PravantRecurrence 10 901124 720 C/H N/A C/SE PuelXX Engine Unit 4 shutdown for a scheduled Upgrades and Refueling Outage.F Forced S Scheduled Reason A-Equipment Failure(Explain)

B-Maintenance or Test C-Refueling 0-Regulatory Restriction E-Operator Training&Ucense Examination F-Administrative G-Operational Error(Explain)

H-Other (Explain)Method 1-Manual 2-Manual Scram 3-Automatic Scram 4-Continued 5-Load Reduction 9-Other (Explain)Exhibit G-Instructions for Preparation of Data EntryScheetsLicensee Event Report(LER)

File (NUREG%161)

Exhibit1-Same Source Ii 0~~I b ,1