Monthly Operating Repts for Sept 1991 for Turkey Point,Units 3 & 4.W/911014 Ltr
ML17348B182
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 09/30/1991
From: Leonard C, Plunkett T
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
L-91-273, NUDOCS 9110210305
Download: ML17348B182 (18)


Text

ACCELERATED DI UTION DEMONSTTION SYSTEM 4

1'~

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9110210305 DOC.DATE: M~~

FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and NOTARIZED: NO Light C DOCKET 05000250 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 AUTH. NAME AUTHOR AFFILIATION LEONARD,C.M. Florida Power & Light Co.

PLUNKETT,T.F. Florida Power & Light Co.

RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly o 'ng repts for Sept. 1991 for Turkey Point, Units 3 & 4-.W 11014 tr. D DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR I ENCL  ! SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL D PD2-2 LA 3 3 PD2-2 PD 1 1 AULUCK,R 1 1 D INTERNAL: AEOD/DOA 1 1 AEOD/DSP/TPAB 1 1 NRR/D WREB10 1 1 NRR/DOEA/OEAB 1 1 RE ~ E 1 1 1 RGN2 1 1 EXTERNAL EG&G BRYCE i J ~ H 1 1 NRC PDR 1 1 NSIC 1 1 D

D D

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK ROOM P 1-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISIS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 14 ENCL 14

~

P.O. Box 029100, Miami, FL, 33102-9100 POT 14 $ 91 L-91-273 10 CFR 50 '6 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Gentlemen:

RE: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Monthl 0 eratin Re ort In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of NUREG 0020, attached are the September 1991 Operating Status and Summary of Operating Experience Reports for Turkey Point Units 3 and 4.

Very truly yours, T. F. Plunkett Vice President Turkey Point Nuclear TFP/DRP/CML attachments cc: Stewart D. Ebneter,, Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant 9ii02i0305 910930 PDR ADOCK 05000250 R PDR >r>q an FPL Gcoop company I

)

IO r

I l

E.

I'

AVERAGE'AILY UNIT POWER LEVEL DOCKET NO. 50-250 UNIT Turke Point 3 DATE October 7 1991 COMPLETED BY C. M. Leonard TELEPHONE 305 246-7103 MONTH Se tember 1991 AVERAGE DAILY POWER 'LEVEL (MWe-Net) 09/01/91 0 09/02/91 0 09/03/91 0 09/04/91 0 09/05/91 0 09/06/91 0 09/07/91 0 09/08/91 0 09/09/91 0 09/10/91 0 09/11/91 0 09/12/91 0 09/13/91 0 09/14/91 0 09/15/91 0 09/16/91 0 09/17/91 0 09/18/91 0 09/19/91 0 09/20/91 0 09/21/91. 0 09/22/91 0 09/23/91 0 09/24/91 0 09/25/91 0 09/26/91 0 09/27/91 0 09/28/91 0 09/29/91 0 09/30/91 0

OPERATING DATA REPORT DOCKET NO 50 - 250 DATE 10/ 7/91 COMPLETED BY C. M. LEONARD TELEPHONE 305/246/7103 OPERATING STATUS

l. UNIT NAME: TURKEY POINT UNIT 3
2. REPORTING PERIOD:SEPTEMBER 1991
3. LICENSED THERMAL POWER (MWT): 2200
4. NAMEPLATE RATING (GROSS MWE): 760
5. DESIGN ELECTRICAL RATING (NET MWE): 693
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 699
7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 666
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)

SINCE LAST REPORT, GIVE REASONS:

9. POWER LEVEL TO'HICH RESTRICTED'F ANY (NET MWE)
10. REASONS FOR RESTRICTIONS, IF ANY:

MONTHLY -YTD- CUMULATIVE

11. HOURS IN REPORT PERIOD: 720 6551 164984.6
12. NUMBER OF HOURS REACTOR WAS CRITICAL 60.9 60.9 104534. 1
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 844.4
14. HOURS GENERATOR ON-LINE 0.0 0.0 103055.7
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 121. 8
16. GROSS THERMAL ENERGY GENERATED (MWH) 0 0 214231642
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 0 0 68615991
18. NET ELECTRICAL ENERGY GENERATED (MWH) -9020 -17478 64861040
19. UNIT SERVICE FACTOR 0.0 0.0 62.5
20. UNIT AVAILABILITYFACTOR 0.0 0.0 62.5
21. CAPACITY FACTOR (USING MDC NET) 0.0 0.0 60.2
22. CAPACITY FACTOR (USING DER NET) 0.0 0.0 56.7
23. UNIT FORCED OUTAGE RATE 0.0 0.0 12.5
24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS
25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: 10/04/91

Ik

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO. 50-250'NIT Turke Point 3 DATE October 7 1991 COMPLETED BY C. M. Leonard TELEPHONE 305 246-7103 REPORT MONTH Se tember 1991 Unit 3 was .shutdown on December 12, 1990 for a scheduled Upgrades Outage.

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

UNIT NAME Turkey Point ¹3 DATE October 7, 1991 COMPLETED BY C. M. Leonard REPORT MONTH September 1991 TELEPHONE 305 246-7103 Method of Shutting Licensee Cause 8 Corrective Down Event System Component Actionto Date Type'uration (Hours) Reason~ Reactor Reports Code4 Codes PreventRecurrence 22 901212 S 720 H N/A EB Engine Unit 3 was shutdown for scheduled Upgrades Outage.

F Forced Reason Method Exhibit G- Instructions S Scheduled A - Equipment Failure(Explain) 1 - Manual for Preparation of Data 8 - Maintenance or Test 2 - Manual Scram Entry Scheets Ucensee C - Refueling 3 - Automatic Scram Event Report (LER) File D - Regulatory Restriction 4 - Continued (NUREG<161)

E - Operator Training 8 Ucense Examination 5 - Load Reduction F - Administrative 9 - Other (Explain)

G - Operational Error (Explain) Exhibit 1-Same Source H - Other (Explain)

(Ql 0 ~

f

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-251 UNIT Turke Point 4 DATE October 7 1991 COMPLETED BY C. M. Leonard TELEPHONE 305 246-7103 MONTH Se tember 1991 AVERAGE DAILY POWER LEVEL (MWe-Net) 09/01/91 09/02/91 09/03/91 09/04/91 09/05/91 09/06/91 09/07/91 09/08/91 09/09/91 09/10/91 09/11/91 09/12/91 09/13/91 09/14/91 09/15/91 09/16/91 09/17/91 09/18/91 09/19/91 09/20/91 09/21/91 09/22/91 09/23/91 09/24/91 09/25/91 09/26/91 09/27/91 09/28/91 09/29/91 09/30/91

i~ i~

' )

J

OPERATING DATA REPORT DOCKET NO 50 - 251 DATE 10/ 7/91 COMPLETED BY C. M. LEONARD TELEPHONE 305/246/7103 OPERATING STATUS

l. UNIT NAME: TURKEY POINT UNIT 4
2. REPORTING PERIOD:SEPTEMBER 1991
3. LICENSED THERMAL POWER (MWT): 2200
4. NAMEPLATE RATING (GROSS MWE): 760
5. DESIGN ELECTRICAL RATING (NET MWE): 693
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 699
7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 666
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)

SINCE LAST REPORT, GIVE REASONS:

9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE)
10. REASONS FOR RESTRICTIONS, IF ANY:

MONTHLY -YTD- CUMULATIVE

11. HOURS IN REPORT PERIOD: 720 655 I 158716. 0
12. NUMBER OF HOURS REACTOR WAS CRITICAL 0.0 0.0 101186. 4
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 166. 6
14. HOURS GENERATOR ON-LINE 0.0 0.0 97567. 1
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 32. 1
16. GROSS THERMAL ENERGY GENERATED (MWH) 0 0 205630060
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 0 0 65612880
18. NET ELECTRICAL ENERGY GENERATED (MWH) -1881 -9911 62043717
19. UNIT SERVICE FACTOR 0.0 0.0 61.5
20. UNIT AVAILABILITYFACTOR 0.0 0.0 61.5 0.0 0.0 59.8
22. CAPACITY FACTOR (USING DER NET) 0.0 0.0 56.4
23. UNIT FORCED OUTAGE RATE 0.0 0.0 11.9
24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS
25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: 11/04/91

~0

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO. 50-251 UNIT Turke Point 4 DATE October 7 1991

,COMPLETED BY C. M. Leonard TELEPHONE 305 246-7103 REPORT MONTH Se tember 1991 Unit 4 was shutdown for a scheduled Upgrades and Refueling Outage on November 24, 1990.

~ ~

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50 251 Turke Point ¹4 DATE, October 7 1991, ~

COMPLETED BY C. M. Leonard REPORT MONTH Se tember 1991 TELEPHONE (305) 246-7103 Method of Shutting Licensee Cause 8 Corrective Duration Down Event System Component Action to No. Date Type (Hours) Reason2 Reactor Report¹ Code4 Codes PravantRecurrence 10 901124 720 C/H N/A C/SE PuelXX Unit 4 shutdown for a scheduled Engine Upgrades and Refueling Outage.

F Forced Reason Method Exhibit G- Instructions S Scheduled A - Equipment Failure(Explain) 1 - Manual for Preparation of Data B - Maintenance or Test 2 - Manual Scram EntryScheetsLicensee C - Refueling 3 - Automatic Scram Event Report(LER) File 0 - Regulatory Restriction 4 - Continued (NUREG%161)

E - Operator Training & Ucense Examination 5 - Load Reduction F - Administrative 9 - Other (Explain)

G - Operational Error(Explain) Exhibit1-Same Source H - Other (Explain)