Monthly Operating Repts for June 1994 for Turkey Point Units 3 & 4.W/940708 Ltr
ML17352A720
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 06/30/1994
From: KNORR J E, PLUNKETT T E
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
L-94-174, NUDOCS 9407180242
Download: ML17352A720 (13)


Text

P RIORITY 1 (ACCELERATED RIDS PROCESSIN REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C AUTH.NAME AUTHOR AFFILIATION KNORR,J.E.

Florida Power&Light Co.PLUNKETT,T.E.

Florida Power&Light Co.RECIP.NAME RECIPIENT AFFILIATION DOCKET 05000250 05000251

SUBJECT:

Monthl ting repts for June 1994 for Turkey Point Units 3&./940708 ltr.DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR Q ENCL J SIZE:/5'ITLE: Monthly Operating Report (per Tech Specks NOTES: RECIPIENT ID CODE/NAME PD2-2 PD INTERNAL: AEOD/DSP/TPAB NRR/DRIL/RPEB RGN2 EXTERNAL EG&G BRYCE i J~H NSIC COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME CROTEAU,R S/EAB 01 NRC PDR COPIES LTTR ENCL 1 1 1.1 1 1 1 1 NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE iVASTE!CONTACT THE DOCUMENT CONTROL DESK, ROOM P!-37 (EXT.504-2083)TO ELIMINATE YOUR NAME FROM DISTRIBUTION LI~I'OR DOCUMENTS YOU DON'T NEED!TOTAL NUMBER OF COPIES REQUIRED: LTTR 10 ENCL 10

'C~e JUL~8 1%<L-94-174 10 CFR 50.36 U.S.Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C..20555 Gentlemen:

Re: Turkey Point Units 3 and 4 Docket Nos.50-250 and 50-251 Monthl 0 eratin Re ort In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of NUREG-0020, attached are the June 1994 Operating Status and Summary of Operating Experience Reports for Turkey Point Units 3 and 4.Very truly yours, T.F~Plunkett Vice President Turkey Point Plant jek Attachments cc: S.D.Ebneter, Regional Administrator, Region II, USNRC T.P.Johnson, Senior Resident Inspector, USNRC, Turkey Point Plant r'.,P A AA T rrr407180242 940630 PDR ADOCK 050002SO R PDR an FPL Group company AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.UNIT DATE COMPLETED BY TELEPHONE 50-250 Turke Point 3 Jul 12 1994 J.E.Knorr 305-246-6757 MONTH June 1994 AVERAGE DAILY POWER LEVEL (MWe-Net)6/01/94 6/02/94 6/03/94 6/04/94 6/05/94 6/06/94 6/07/94 6/08/94 6/09/94 6/10/94 6/11/94 6/12/94 6/13/94 6/14/94 6/15/94 6/16/94 6/17/94 6/18/94 6/19/'94 6/20/94 6/21/94 6/22/94 6/23/94 6/24/94 6/25/94 6/26/94 6/27/94 6/28/94 6/29/94 6/30/94 598 675 676 680 680 677 673 669 671 670 671 670 649 392 312 482 671 670 670 669 671 671 671 668 667 667 669 668 672 674 UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.UNIT NAME'ATE: COMPLETED BY TELEPHONE:

50-250 Turke Point 43 J01 12 1994 J.E.Knorr 305 246-6757 REPORT MONTH June 1994 No.14 15 Date 940531 940613 Type Duration (Hours)0.0 0.0 Reason2 Method of Shutting Down Reactor Licensee Event Reportf N/A NIA Syste4>Code HC HA Conpon~nt Code VALVEX Cause 4 Corrective Action to Prevent Recurrence CONDENSER WATER BOX TUBE IEAK REPAIR OIL LINE TO INTERCEPT VALVE F-Forced S-Scheduled Reason A-Equipnent Failure B-Maintenance or Test C-Refueling D-Regulatory restriction E-Operator Training 4 License Exartination F-Adninistrative G-Operational Error (Explain)H-Other (Explain)Method 1-Manual 2-Manual Scran 3-Automatic Scrara 4-Continued 5-Load Reduction 9-Other (Explain)Exhibit G-Instructions for Preparation of Data Entry Sheets Licensee Event Report (LER)Flic (NUREG-0161)

Exhibit 1-Sa=e Source OPERATING STATUS OPERATING DATA REPORT DOCKET NO 50-250 DATE 7/7/94 COMPLETED BY J.E.KNORR TELEPHONE 305/246/6757 1.UNIT NAME: TURKEY POINT UNIT 3 2.REPORTING PERIOD: JUNE 1994 3.LICENSED THERMAL POWER (MWT): 2200 4.NAMEPLATE RATING (GROSS MWE): 760 5.DESIGN ELECTRICAL RATING (NET MWE): 693 6.MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 699 7.MAXIMUM DEPENDABLE CAPACITY (NET MWE): 666 B.IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)SINCE LAST REPORT, GIVE REASONS: 9.POWER LEVEL TO WHICH RESTRICTED

~IF ANY (NET MWE)10.REASONS FOR RESTRICTIONS, IF ANY: MONTHLY-YTD-CUMULATIVE 11.HOURS IN REPORT PERIOD: 12.NUMBER OF HOURS REACTOR WAS CRITICAL 13.REACTOR RESERVE SHUTDOWN HOURS 14.HOURS GENERATOR ON-LINE 15.UNIT RESERVE SHUTDOWN HOURS 16.GROSS THERMAL ENERGY GENERATED (MWH)17.GROSS ELECTRICAL ENERGY GENERATED (MWH)'18.NET ELECTRICAL ENERGY GENERATED (MWH)19.UNIT SERVICE.FACTOR 20.UNIT AVAILABILITY FACTOR 21.CAPACITY FACTOR (USING MDC NET)22.CAPACITY FACTOR (USING DER NET)23.UNIT FORCED OUTAGE RATE 24.SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS NONE 720 720.0 0.0 720.0 1521049 485048 461385 100.0 100.0 96.2 92.5 0.0 4343 3327.6 0.0 3180.3 6668822 2159663 2049672 73.2 73.2 70.9 68.1 2.1 189080.6 124587.9 844.4 122713.7 254808660 81741479 77319177 64.9 65.0 62.4 59.0 11.6 25.IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.UNIT'ATE'OMPLETED BY: TELEPHONE:

50-250 Turke Point 3 Jul 12 1994 J.E.Knorr 305 246-6757 REPORT MONTH June 1994 Unit 3 began the month at 100%reactor power.The unit was reduced in power to 70%load due to the failure of a control oil line to the turbine generator north east intercept valve on June 13.While completing that repair, a further load reduction was made to clean a water box.The intercept valve was reopened on June 16 and the plant reached 100%power later that day.Unit 3 continued to operate at 100%power for the remainder of the month.

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.UNIT DATE COMPLETED BY TELEPHONE 50-251 Turke Point 4 Jul 12 1994 J.E.Knorr 305-246-6757 MONTH June 1994 AVERAGE DAILY POWER LEVEL (MWe-Net)6/01/94 6/02/94 6/03/94 6/04/94 6/05/94 6/06/94 6/07/94 6/08/94 6/09/94 6/10/94 6/11/94 6/12/94 6/13/94 6/14/94 6/15/94 6/16/94 6/17/94 6/18/94 6/19/94 6/20/94 6/21/94 6/22/94 6/23/94 6/24/94 6/25/94 6/26/94 6/27/94 6/28/94 6/29/94 6/30/94 361 548 670 675 675 671 669 666 665 664 665 664 661 662 664 667 667 670 660 664 664 665 664 663 662 662 665 665 667 669 UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.UNIT NAME: DATE COMPLETED BY TELEPHONE:

50-251 Turke Point 4 Jul 12 1994 J.E.Knorr 305 246-6757 REPORT MONTH June 1994 No.05 Date 940526 Type Duration (Hours)0.0 Reason Method of Shutting Down Reactor Licensee Event ReportS N/A System Code HH Compongnt code PUMPXX Cause C Corrective Action to Prevent Recurrence POÃER REDUCTION TO REPAIR 4A FEEDNATER PUMP F-Forced S-Scheduled Reason A-Equipment Failure B-Maintenance or Test C-Refueling D-Regulatory restriction E-Operator Training&License Examination F-Administrative G-Operational Error (Explain)H-Other (Explain)Method 1-Manual 2-Manual Scram 3-Automatic Scran 4-Continued 5-Load Reduction 9-Other (Explain)Exhibit G-Instructions for Preparation of Data Entry Sheets Licensee Event Report (LER)File (NUREG-0161)

Exhib).t 1-Same Source

OPERATING STATUS OPERATING DATA REPORT DOCKET NO 50-251 DATE 7/7/94 COMPLETED BY J.E.KNORR TELEPHONE 305/246/6757 1.UNIT NAME: TURKEY POINT UNIT 4 2.REPORTING PERIOD: JUNE 1994 3.LICENSED THERMAL POWER (MWT): 2200 4.NAMEPLATE RATING (GROSS MWE): 760 5.DESIGN ELECTRICAL RATING (NET MWE): 693 6.MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 699 7.MAXIMUM DEPENDABLE CAPACITY (NET MWE): 666 8.IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)SINCE LAST REPORT, GIVE REASONS: 9.POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE)10.REASONS FOR RESTRICTIONS, IF ANY: MONTHLY-YTD-CUMULATIVE 11.HOURS IN REPORT PERIOD: 12.NUMBER OF HOURS REACTOR WAS CRITICAL 13.REACTOR RESERVE SHUTDOWN HOURS 14.HOURS GENERATOR ON-LINE 15.UNIT RESERVE SHUTDOWN HOURS 16.GROSS THERMAL ENERGY GENERATED (MWH)17.GROSS ELECTRICAL ENERGY GENERATED (MWH)'IB.NET ELECTRICAL ENERGY GENERATED (MWH)19.UNIT SERVICE'FACTOR 20.UNIT AVAILABILITY FACTOR 21.CAPACITY FACTOR (USING MDC NET)22.CAPACITY FACTOR (USING DER NET)23.UNIT FORCED OUTAGE RATE 24.SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS REFUELING OUTAGE SCHEDULED TO START OCTOBER 720~720.0 0.0 720.0 1553447 492619 469270 100.0 100.0 97.9 94.0 0.0 3, 1994 4343 416'7.9 0.0 4158.2 8885666 2863584 2726601 95.7 95.7 94.3 90.6 4.3 182812.0 121448.2 166.6 117483.2 247945621 79217554 74961833 64.3 64.6 62.5 59.2 11.I 25.IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.UNIT DATE COMPLETE BY TELEPHONE:

50-251 Turke Point 4 Jul 12 1 994 J.E.Knorr 305 246-6757 REPORT MONTH June 1994 Unit 4 began the month of June at approximately 55%power during repair of a main feed pump.On June 2, the reactor was returned to 100%power and remained so for the remainder of the month.

MRC DttE DATE:~0p gg g4 X 94-1Va SITE LICENSING NRC OUTGOING CORRESPONDENCE REVIEW SHEET

SUBJECT:

MONTHLX OPERATING REPORT FOR JUNE~994 Note: Nuclear policy Np~g states that the person whose signature or initials have been applied to this document acknowledges personal knowledge of and accepts full responsibility for the correctness of the fnformatfon contained ln the document.lf a person ls only initialing a particular element of this document, that ln turn is the extent of his responsibility.

piease identify on the attached copy those action items whfch are your responsfbfffty, and have not been compfetedlfmpfemented.

Lfcensfng will track the identified items on CTRAC.DOCUMENT REVIEW REVIEWER TITLE/DEPARTMENT REVIEW START DATE REVIEW, END DATE$.J.E.Knorr 2.E.J.Welnkam 3.M.J.Bowskill Llcensi Anal st Llcensin Mana er Reactor Su ervisor 0 erations Mana er c-7-f 7&7 y f PNSC REVIEW: N/A PNSC CHAIRMAN PNSC MEETING No, QA INDEPENDENT VERIF.REQ'D: YES NO X QA IV COMPLETED DATE: MANAGEMENT APPROVAL L.P e Plant Manager see cover letter T.F.Plunkett Vice President I have closed the item listed below on CTRAC: I mailed the letter to the NRC.CTRAC CLOSED: 94-0380-34 (Name/date)

J UI 0 8)gg~