P RIORITY (ACCELERATED RIDS PROCESSIN 1

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

DOCKET FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 05000250 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 AUTH. NAME AUTHOR AFFILIATION KNORR,J.E. Florida Power & Light Co.

PLUNKETT,T.E. Florida Power & Light Co.

RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthl ting repts for June 1994 for Turkey Point Units 3 & . /940708 ltr.

DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR Monthly Operating Report (per Tech Q

Specks ENCL J SIZE: /5'ITLE:

NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-2 PD 1 1 CROTEAU,R 1 1 INTERNAL: AEOD/DSP/TPAB 1 1 S/ EAB 1 . 1 NRR/DRIL/RPEB 1 1 01 1 1 RGN2 1 1 EXTERNAL EG&G BRYCE i J ~ H 1 1 NRC PDR 1 1 NSIC 1 1 NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE iVASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM P!-37 (EXT. 504-2083 ) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LI~ I'OR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 10 ENCL 10

'C

~

e

JUL ~8 1%<

L-94-174 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C.. 20555 Gentlemen:

Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Monthl 0 eratin Re ort In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of NUREG-0020, attached are the June 1994 Operating Status and Summary of Operating Experience Reports for Turkey Point Units 3 and 4.

Very truly yours, T. F ~ Plunkett Vice President Turkey Point Plant jek Attachments cc: S. D. Ebneter, Regional Administrator, Region II, USNRC T. P. Johnson, Senior Resident Inspector, USNRC, Turkey Point Plant r'.,P A AA T rrr407180242 940630 PDR ADOCK 050002SO R PDR an FPL Group company

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-250 UNIT Turke Point 3 DATE Jul 12 1994 COMPLETED BY J. E. Knorr TELEPHONE 305-246-6757 MONTH June 1994 AVERAGE DAILY POWER LEVEL (MWe-Net) 6/01/94 598 6/02/94 675 6/03/94 676 6/04/94 680 6/05/94 680 6/06/94 677 6/07/94 673 6/08/94 669 6/09/94 671 6/10/94 670 6/11/94 671 6/12/94 670 6/13/94 649 6/14/94 392 6/15/94 312 6/16/94 482 6/17/94 671 6/18/94 670 6/19/'94 670 6/20/94 669 6/21/94 671 6/22/94 671 6/23/94 671 6/24/94 668 6/25/94 667 6/26/94 667 6/27/94 669 6/28/94 668 6/29/94 672 6/30/94 674

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-250 UNIT Turke Point 43 J01 12 1994 NAME'ATE:

COMPLETED BY J. E. Knorr TELEPHONE: 305 246-6757 REPORT MONTH June 1994 No. Date Type Duration Reason2 Method of Licensee Syste4> Conpon~nt Cause 4 Corrective Action to (Hours) Shutting Event Code Code Prevent Recurrence Down Reportf Reactor 14 940531 0.0 N/A HC CONDENSER WATER BOX TUBE IEAK 15 940613 0.0 NIA HA VALVEX REPAIR OIL LINE TO INTERCEPT VALVE F Forced Reason Method Exhibit G Instructions Exhibit Sa=e Source S Scheduled A Equipnent Failure 1 - Manual for Preparation of Data 1

B Maintenance or Test 2 Manual Scran Entry Sheets Licensee C Refueling 3 Automatic Scrara Event Report (LER) Flic D - Regulatory restriction 4 Continued (NUREG-0161)

E - Operator Training 4 5 Load Reduction License Exartination 9 - Other (Explain)

F Adninistrative G Operational Error (Explain)

H - Other (Explain)

OPERATING DATA REPORT DOCKET NO 50 - 250 DATE 7/ 7/94 COMPLETED BY J. E. KNORR TELEPHONE 305/246/6757 OPERATING STATUS

1. UNIT NAME: TURKEY POINT UNIT 3
2. REPORTING PERIOD: JUNE 1994
3. LICENSED THERMAL POWER (MWT): 2200
4. NAMEPLATE RATING (GROSS MWE): 760
5. DESIGN ELECTRICAL RATING (NET MWE): 693
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 699
7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 666 B. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)

SINCE LAST REPORT, GIVE REASONS:

9. POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE)

~

10. REASONS FOR RESTRICTIONS, IF ANY:

MONTHLY -YTD- CUMULATIVE

11. HOURS IN REPORT PERIOD: 720 4343 189080.6
12. NUMBER OF HOURS REACTOR WAS CRITICAL 720.0 3327.6 124587.9
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 844.4
14. HOURS GENERATOR ON-LINE 720.0 3180.3 122713.7
15. UNIT RESERVE SHUTDOWN HOURS
16. GROSS THERMAL ENERGY GENERATED (MWH) 1521049 6668822 254808660
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 485048 2159663 81741479

'18. NET ELECTRICAL ENERGY GENERATED (MWH) 461385 2049672 77319177

19. UNIT SERVICE. FACTOR 100.0 73.2 64.9
20. UNIT AVAILABILITYFACTOR 100. 0 73.2 65.0
21. CAPACITY FACTOR (USING MDC NET) 96.2 70.9 62.4
22. CAPACITY FACTOR (USING DER NET) 92. 5 68. 1 59.0
23. UNIT FORCED OUTAGE RATE 0.0 2.1 11.6
24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS NONE
25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO. 50-250 Turke Point 3 UNIT'ATE'OMPLETED Jul 12 1994 BY: J. E. Knorr TELEPHONE: 305 246-6757 REPORT MONTH June 1994 Unit 3 began the month at 100% reactor power. The unit was reduced in power to 70% load due to the failure of a control oil line to the turbine generator north east intercept valve on June

13. While completing that repair, a further load reduction was made to clean a water box. The intercept valve was reopened on June 16 and the plant reached 100% power later that day. Unit 3 continued to operate at 100% power for the remainder of the month.

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-251 UNIT Turke Point 4 DATE Jul 12 1994 COMPLETED BY J. E. Knorr TELEPHONE 305-246-6757 MONTH June 1994 AVERAGE DAILY POWER LEVEL (MWe-Net) 6/01/94 361 6/02/94 548 6/03/94 670 6/04/94 675 6/05/94 675 6/06/94 671 6/07/94 669 6/08/94 666 6/09/94 665 6/10/94 664 6/11/94 665 6/12/94 664 6/13/94 661 6/14/94 662 6/15/94 664 6/16/94 667 6/17/94 667 6/18/94 670 6/19/94 660 6/20/94 664 6/21/94 664 6/22/94 665 6/23/94 664 6/24/94 663 6/25/94 662 6/26/94 662 6/27/94 665 6/28/94 665 6/29/94 667 6/30/94 669

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-251 UNIT NAME: Turke Point 4 DATE Jul 12 1994 COMPLETED BY J. E. Knorr TELEPHONE: 305 246-6757 REPORT MONTH June 1994 No. Date Type Duration Reason Method of Licensee System Compongnt Cause C Corrective Action to (Hours) Shutting Event Code code Prevent Recurrence Down ReportS Reactor 05 940526 0.0 N/A HH PUMPXX POÃER REDUCTION TO REPAIR 4A FEEDNATER PUMP F - Forced Reason Method Exhibit G - Instructions Exhib).t - Same Source S - Scheduled A - Equipment Failure 1 - Manual for Preparation of Data 1

B Maintenance or Test 2 - Manual Scram Entry Sheets Licensee C Refueling 3 - Automatic Scran Event Report (LER) File D Regulatory restriction 4 - Continued (NUREG-0161)

E Operator Training & 5 - Load Reduction License Examination 9 Other (Explain)

F - Administrative G Operational Error (Explain)

H - Other (Explain)

OPERATING DATA REPORT DOCKET NO 50 - 251 DATE 7/ 7/94 COMPLETED BY J. E. KNORR TELEPHONE 305/246/6757 OPERATING STATUS

1. UNIT NAME: TURKEY POINT UNIT 4
2. REPORTING PERIOD: JUNE 1994
3. LICENSED THERMAL POWER (MWT): 2200
4. NAMEPLATE RATING (GROSS MWE): 760
5. DESIGN ELECTRICAL RATING (NET MWE): 693
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 699
7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 666
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)

SINCE LAST REPORT, GIVE REASONS:

9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE)
10. REASONS FOR RESTRICTIONS, IF ANY:

MONTHLY -YTD- CUMULATIVE

11. HOURS IN REPORT PERIOD: 720 4343 182812. 0
12. NUMBER OF HOURS REACTOR WAS CRITICAL ~ 720.0 416'7.9 121448. 2
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 166. 6
14. HOURS GENERATOR ON-LINE 720.0 4158. 2 117483. 2
15. UNIT RESERVE SHUTDOWN HOURS
16. GROSS THERMAL ENERGY GENERATED (MWH) 1553447 8885666 247945621
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 492619 2863584 79217554

'IB. NET ELECTRICAL ENERGY GENERATED (MWH) 469270 2726601 74961833

19. UNIT SERVICE 'FACTOR 100.0 95.7 64.3
20. UNIT AVAILABILITYFACTOR 100.0 95.7 64.6
21. CAPACITY FACTOR (USING MDC NET) 97.9 94.3 62.5
22. CAPACITY FACTOR (USING DER NET) 94.0 90.6 59.2
23. UNIT FORCED OUTAGE RATE 0.0 4.3 11. I
24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS REFUELING OUTAGE SCHEDULED TO START OCTOBER 3, 1994
25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO. 50-251 UNIT Turke Point 4 DATE Jul 12 1 994 COMPLETE BY J. E. Knorr TELEPHONE: 305 246-6757 REPORT MONTH June 1994 Unit 4 began the month of June at approximately 55% power during repair of a main feed pump. On June 2, the reactor was returned to 100% power and remained so for the remainder of the month.

SITE LICENSING NRC OUTGOING CORRESPONDENCE REVIEW SHEET MRC DttE DATE: ~0p gg g4 X 94-1Va

SUBJECT:

MONTHLX OPERATING REPORT FOR JUNE ~994 Note: Nuclear policy Np~g states that the person whose signature or initials have been applied to this document acknowledges personal knowledge of and accepts full responsibility for the correctness of the fnformatfon contained ln the document. lf a person ls only initialing a particular element of this document, that ln turn is the extent of his responsibility.

piease identify on the attached copy those action items whfch are your responsfbfffty, and have not been compfetedlfmpfemented. Lfcensfng will track the identified items on CTRAC.

DOCUMENT REVIEW REVIEW REVIEW, REVIEWER TITLE/DEPARTMENT START DATE END DATE

$. J. E. Knorr Llcensi Anal st c f

2. E. J. Welnkam Llcensin Mana er 7&7 fy
3. M. J. Bowskill Reactor Su ervisor 0 erations Mana er PNSC REVIEW: N/A PNSC MEETING No, PNSC CHAIRMAN QA INDEPENDENT VERIF. REQ'D: YES NO X QA IV COMPLETED DATE:

MANAGEMENTAPPROVAL see cover letter L. P e T. F. Plunkett Plant Manager Vice President I have closed the item listed below on CTRAC:

mailed the letter to the NRC. (Name/date)

I J UI 0 8 )gg~

CTRAC CLOSED: 94-0380-34