ML17353A321

From kanterella
Revision as of 11:34, 10 September 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Monthly Operating Repts for Jul 1995 for Turkey Point Units 1 & 2.W/950811 Ltr
ML17353A321
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 07/31/1995
From: KNORR J E, PLUNKETT T F
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
L-95-229, NUDOCS 9508230091
Download: ML17353A321 (15)


Text

PRIORITY 1y (ACCELERATED RZDS PROCESSING)

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)DOCKET FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 05000250 P 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 AUTH.NAME AUTHOR AFFILIATION KNORR,J.E.

Florida Power S Light Co.PLUNKETT,T.F.

Florida Power 6 Light Co.RECIP.NAME RECIPIENT AFFILIATION I

SUBJECT:

Monthly o'ng repts for Jul 1995 for Turkey Point Units 1 6 2.950811 tr.DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE: TITLE: Monthly Operating Report (per Tech Specs)NOTES: RECIPIENT ID CODE/NAME PD2-1 PD INTERNAL: AEOD/SPD/RRAB NRR/DI S P/PI PB RGN2 EXTERNAL LI TCO BRYCE i J H NRC PDR COPIES'TTR ENCL 1 1 1 1 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME CROTEAU,R CE 01 NRR/DRPM/PECB NOAC COPIES LTTR ENCL 1 1 1 1 1 1 1 1 D N NOTE TO ALL"RIDS" RECZPlENTS:

PLEASE HELP US TO REDUCE WASTE)CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN 5D8 (415>>2083)

TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED'.TOTAL NUMBER OF COPIES REQUIRED: LTTR 10 ENCL 10 i

0 4UGll>%5 L-95-229 10 CFR 50.36 U.S.Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C.20555 Gentlemen:

Re: Turkey Point Units 3 and 4 Docket Nos.50-250 and 50-251 In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of NUREG-0020, attached are the July 1995 Operating Status and Summary of Operating Experience Reports for Turkey Point Units 3 and 4.Very truly yours, T.F.Plunkett Vice President Turkey Point Plant JEK Attachments cc: S.D.Ebneter, Regional Administrator, Region II, USNRC T.P.Johnson, Senior Resident Inspector, USNRC, Turkey Point Plant~~'4 ggrJ, 9508230091 5'."-.731 PDR ADOCK 0'<<,00250 R", PDR an FPL Group company 4 jI AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.UNIT DATE COMPLETED BY TELEPHONE MONTH AVERAGE DAILY POWER LEVEL (MWe-Net)7/01/95 7/02/95 7/03/95 7/04/95 7/05/95'7/06/95 7/07/95 7/08/95 7/09/95 7/10/95 7/11/95 7/12/95 7/13/95 7/14/95 7/15/95 7/16/95 7/17/95 7/18/95 7/19/95 7/20/95 7/21/95 7/22/95 7/23/95 7/24/95 7/25/95 7/26/95 7/27/95 7/28/95 7/29/95 7/30/95 7/31/95 664 665 666 667 663 665 665 664 667 670 673 673 670 634 667 665 665 671 665 671 662 660 660 661 664 669 675 677 676 675 675

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.UNIT NAME: DATE: COMPLETED BY TELEPHONE:

REPORT MONTH No.Date Duration (Hours)Reason Method of Shutting Down , Reactor Licensee Event Reports System Code~Component Cause 6 Corrective Action to prevent Recurrence N/A F-Forced S-Scheduled Reason A-Equipment Failure B-Maintenance or Test C-Refueling D-Regulatory restriction E-Operator Training 4 License Examination F-Administrative G-Operational Error (Explain)H-Other (Explain)Method 1-Manual 2-Manual Scram 3-Automatic Scram 4-Continued 5-Load Reduction 9-Other (Explain)Exhibit G-Instructions for preparation of Data Entry Sheets Licensee Event Report (LER)File (NUREG-0161) 5 Exhibit 1-Same Source

OPERATING STATUS OPERATING DATA REPORT DOCKET NO 50-250 DATE 8/7/95 PREPARED BY J.E.KNORR TELEPHONE 305/246/6757 1.UNIT NAME: TURKEY POINT UNIT 3 2.REPORTING PERIOD: JULY, 1995 3.LICENSED THERMAL POWER (MWT): 2200 4.NAMEPLATE RATING (GROSS-MWE): 760 6.MAXIMUM DEPENDABLE CAPACITY (GROSS MHE): 699 7.MAXIMUM DEPENDABLE CAPACITY (NET MWE): 666 8.IF CHANGES OCCUR IN CAPACITY RATINGS (ITEH~MBER 3 THROUGH 7)SINCE LAST REPORT, GIVE REASONS: 9.10.REASONS FOR RESTRICTIONS, IF ANY: MONTHLY-YTD-CUMULATIVE 11.HOURS IN REPORT PERIOD: 744 5087 12.NUMBER OF HOURS REACTOR 744.0 5051.7 13.REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 14.HOURS GENERATOR ON-LINE 744.0 5047.0 15.UNIT RESERVE SHUTDOWN HO 0.0 0.0 17.GROSS ELECTRICAL ENERGY GENERATED (MWH7 520620 3554986 18.NET ELECTRICAL ENERGY GENERATED (MWH)495897 3388063 19.UNIT SERVICE FACTOR 100.0 99.2 20.UNIT AVAILABILITY FA 100.0 99.2 21.CAPACITY FACTOR (USING MD 100.1 100.0 22.CAPACITY FACTOR (USING DER NET)96.2 96.1 23.UNIT FORCED OUTAGE RATE 0.0 0.8 24.SHUTDOWNS SCHEDULED OVER REFUELING OUTAGE SCHEDULED SEPTEMBER 1995 198584.6 134030.1 844.4 132095.7 121.8 Y73T33763 88316450 83582490 66.5 66.6 64.2 60.7 10.9 25.IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

DOCKET NO.UNIT: DATE COMPLETED BY: TELEPHONE:

REPORT MONTH Unit 3 operated at: essentially 100%reactor power for the month of July.

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.UNIT NAME: DATE: COMPLETED BY: TELEPHONE:

REPORT MONTH No.Date Type Duration (Hours)Reason Method of Shutting Down Reactor'icensee Event Reportf Systen Code Conponent code'ause 4 Corrective Action to Prevent Recurrence N/A F-Forced S-Scheduled Reason A-Equipnent Failure B-Maintenance or Test C-Refueling D-Regulatory restriction E-Opozator Training 4 License Exanination F-Administrative G-Operational Error (Explain)H-Other (Explain)Yethod 1-Yanual 2-Ymnual Scram 3-Autcaatic Sczan 4-Continued 5-Load Reduction 9-Other (Explain)Exhibit G-Instructions for Preparation of Data Entry Sheets Licensee Event Report (LER)File (NUREG-0161)

Exhibit 1-Sa"e Source AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.UNIT DATE COMPLETED BY TELEPHONE MONTH AVERAGE DAILY POWER LEVEL (MWe-Net)7/01/95 7/02/95 7/03/95 7/04/95 7/05/95 7/06/95 7/07/95 7/08/95 7/09/95 7/10/95 7/11/95 7/12/95 7/13/95 7/14/95 7/15/95 7/16/95 7/17/95 7/18/95 , 7/19/95 7/20/95 7/21/95 7/22/95 7/23/95 7/24/95 7/25/95 7/26/95 7/27/95 7/28/95 7/29/95 7/30/95 7/31/95 664 665 669 670 666 668 669 668 670 673 675 676 674 673 671 669 670 677 679 676 671 666 664 665 669 675 675 681 646 646 680

OPERATING STATUS OPERATING DATA REPORT DOCKET NO 50-251 DATE 8/7/95 PREPARED BY J.E.KNORR TELEPHONE 305/246/6757 1.UNIT NAME: TURKEY POINT UNIT 4 2.REPORTING PERIOD: JULY, 1995 3.LICENSED THERMAL POWER (MWT): 2200 4.NAMEPLATE RATING (GROSS MWE): 760 6.MAXIMUM DEPENDABLE CAPACITY (GROSS MURAL: 699 7.MAXIMUM DEPENDABLE CAPACITY (NET MWE): 666 8.IF CHANGES OCCUR IN CAPACITY RATINGS (ITEH~UMBER 3 THROUGH 7)SINCE LAST REPORT, GIVE REASONS: 9.10.REASONS FOR RESTRICTIONS, IF ANY: MONTHLY-YTD-CUMULATIVE 11.HOURS IN REPORT PERIOD: 12.NUMBER OF HOURS REACTOR 13.REACTOR RESERVE SHUTDOWN HOURS 14.HOURS GENERATOR ON-LINE 15.UNIT RESERVE SHUTDOWN HO 17.GROSS ELECTRICAL ENERGY GENERATED (MWHJ 18.NET ELECTRICAL ENERGY GENERATED (MWH)19.UNIT SERVICE FACTOR 20.UNIT AVAILABILITY FA 21.CAPACITY FACTOR (USING MD 22.CAPACITY FACTOR (USING DER NET)23.UNIT FORCED OUTAGE RATE 24.SHUTDOWNS SCHEDULED OVER NONE 744 744.0 0.0 744.0 0.0 CEX5684 522755 498158 100.0 100.0 100.5 96.6 0.0 5087 4965.1 0.0 4956.6 0.0 TU7F7367 3499875 3335438 97.4 97.4 98.5 94.6 2.6 192316.0 129812.8 166.6 125720.2 577.2~92076 84948525 80415024 65.4 65.7 63.7 60.3 10.6 25.IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

DOCKET NO.UNIT DATE: COMPLETE BY: TELEPHONE:

REPORT MONTH Unit 4 operated at essentially 100%reactor power for the month of July.