ML17353A321

From kanterella
Jump to navigation Jump to search
Monthly Operating Repts for Jul 1995 for Turkey Point Units 1 & 2.W/950811 Ltr
ML17353A321
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 07/31/1995
From: Knorr J, Plunkett T
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
L-95-229, NUDOCS 9508230091
Download: ML17353A321 (15)


Text

PRIORITY 1y (ACCELERATED RZDS PROCESSING)

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

DOCKET FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 05000250 P 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 AUTH. NAME AUTHOR AFFILIATION KNORR,J.E. Florida Power S Light Co.

PLUNKETT,T.F. Florida Power 6 Light Co.

RECIP.NAME RECIPIENT AFFILIATION I

SUBJECT:

Monthly o 'ng repts for Jul 1995 for Turkey Point Units 1 6 2. 950811 tr.

DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES:

RECIPIENT COPIES'TTR RECIPIENT COPIES ID CODE/NAME ENCL ID CODE/NAME LTTR ENCL PD2-1 PD 1 1 CROTEAU,R 1 1 INTERNAL: AEOD/SPD/RRAB 1 1 CE 01 1 1 NRR/DIS P/PI PB 1 1 NRR/DRPM/PECB 1 1 RGN2 1 1 EXTERNAL LI TCO BRYCE i J H 1 1 NOAC 1 1 NRC PDR 1 1 D

N NOTE TO ALL "RIDS" RECZPlENTS:

PLEASE HELP US TO REDUCE WASTE) CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN 5D8 (415>>2083) TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED'.

TOTAL NUMBER OF COPIES REQUIRED: LTTR 10 ENCL 10

i 0

4UGll>%5 L-95-229 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Gentlemen:

Re: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of NUREG-0020, attached are the July 1995 Operating Status and Summary of Operating Experience Reports for Turkey Point Units 3 and 4.

Very truly yours, T. F. Plunkett Vice President Turkey Point Plant JEK Attachments cc: S. D. Ebneter, Regional Administrator, Region II, USNRC T. P. Johnson, Senior Resident Inspector, USNRC, Turkey Point Plant

~~'4 ggrJ, 9508230091 5'."- . 731 PDR ADOCK 0 '<<,00250 jI R ", PDR an FPL Group company 4

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

UNIT DATE COMPLETED BY TELEPHONE MONTH AVERAGE DAILY POWER LEVEL (MWe-Net) 7/01/95 664 7/02/95 665 7/03/95 666 7/04/95 667 7/05/95 663

'7/06/95 665 7/07/95 665 7/08/95 664 7/09/95 667 7/10/95 670 7/11/95 673 7/12/95 673 7/13/95 670 7/14/95 634 7/15/95 667 7/16/95 665 7/17/95 665 7/18/95 671 7/19/95 665 7/20/95 671 7/21/95 662 7/22/95 660 7/23/95 660 7/24/95 661 7/25/95 664 7/26/95 669 7/27/95 675 7/28/95 677 7/29/95 676 7/30/95 675 7/31/95 675

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

UNIT NAME:

DATE:

COMPLETED BY TELEPHONE:

REPORT MONTH No. Date Duration Reason Method Licensee System Component Cause 6 Corrective Action to (Hours) of Event Code~ prevent Recurrence Shutting Reports Down Reactor ,

N/A 5

F - Forced Reason Method Exhibit - Instructions Exhibit Same Source S - Scheduled A - Equipment Failure 1 - Manual G

for preparation of Data 1

B - Maintenance or Test 2 - Manual Scram Entry Sheets Licensee C - Refueling 3 - Automatic Scram Event Report (LER) File D - Regulatory restriction 4 - Continued (NUREG-0161)

E - Operator Training 4 5 - Load Reduction License Examination 9 - Other (Explain)

F - Administrative G - Operational Error (Explain)

H - Other (Explain)

OPERATING DATA REPORT DOCKET NO 50 - 250 DATE 8/ 7/95 PREPARED BY J. E. KNORR TELEPHONE 305/246/6757 OPERATING STATUS

1. UNIT NAME: TURKEY POINT UNIT 3
2. REPORTING PERIOD: JULY, 1995
3. LICENSED THERMAL POWER (MWT): 2200
4. NAMEPLATE RATING (GROSS -MWE): 760
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MHE): 699
7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 666
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEH~MBER 3 THROUGH 7)

SINCE LAST REPORT, GIVE REASONS:

9.

10. REASONS FOR RESTRICTIONS, IF ANY:

MONTHLY -YTD- CUMULATIVE

11. HOURS IN REPORT PERIOD: 744 5087 198584.6
12. NUMBER OF HOURS REACTOR 744.0 5051.7 134030.1
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 844.4
14. HOURS GENERATOR ON-LINE 744.0 5047.0 132095.7
15. UNIT RESERVE SHUTDOWN HO 0.0 0.0 121. 8 Y73T33763
17. GROSS ELECTRICAL ENERGY GENERATED (MWH7 520620 3554986 88316450
18. NET ELECTRICAL ENERGY GENERATED (MWH) 495897 3388063 83582490
19. UNIT SERVICE FACTOR 100.0 99.2 66.5
20. UNIT AVAILABILITYFA 100.0 99.2 66.6
21. CAPACITY FACTOR (USING MD 100.1 100.0 64.2
22. CAPACITY FACTOR (USING DER NET) 96.2 96.1 60.7
23. UNIT FORCED OUTAGE RATE 0.0 0.8 10.9
24. SHUTDOWNS SCHEDULED OVER REFUELING OUTAGE SCHEDULED SEPTEMBER 1995
25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

DOCKET NO.

UNIT:

DATE COMPLETED BY:

TELEPHONE:

REPORT MONTH Unit 3 operated at: essentially 100% reactor power for the month of July.

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

UNIT NAME:

DATE:

COMPLETED BY:

TELEPHONE:

REPORT MONTH No. Date Type Duration (Hours)

Reason Method of Reactor'icensee Shutting Event Reportf Systen Code code'ause Conponent 4 Corrective Action to Prevent Recurrence Down N/A F Forced Reason Yethod Exhibit G - Instructions Exhibit 1 - Sa"e Source S Scheduled A Equipnent Failure 1 - Yanual for Preparation of Data B Maintenance or Test - Ymnual Scram Entry Sheets Licensee C - Refueling 3 2

- Autcaatic Sczan Event Report (LER) File D - Regulatory restriction 4 - Continued (NUREG-0161)

E Opozator Training 4 5 - Load Reduction License Exanination 9 - Other (Explain)

F Administrative G Operational Error (Explain)

H Other (Explain)

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

UNIT DATE COMPLETED BY TELEPHONE MONTH AVERAGE DAILY POWER LEVEL (MWe-Net) 7/01/95 664 7/02/95 665 7/03/95 669 7/04/95 670 7/05/95 666 7/06/95 668 7/07/95 669 7/08/95 668 7/09/95 670 7/10/95 673 7/11/95 675 7/12/95 676 7/13/95 674 7/14/95 673 7/15/95 671 7/16/95 669 7/17/95 670 7/18/95 677

, 7/19/95 679 7/20/95 676 7/21/95 671 7/22/95 666 7/23/95 664 7/24/95 665 7/25/95 669 7/26/95 675 7/27/95 675 7/28/95 681 7/29/95 646 7/30/95 646 7/31/95 680

OPERATING DATA REPORT DOCKET NO 50 - 251 DATE 8/ 7/95 PREPARED BY J. E. KNORR TELEPHONE 305/246/6757 OPERATING STATUS

1. UNIT NAME: TURKEY POINT UNIT 4
2. REPORTING PERIOD: JULY, 1995
3. LICENSED THERMAL POWER (MWT): 2200
4. NAMEPLATE RATING (GROSS MWE): 760
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MURAL: 699
7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 666
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEH~UMBER 3 THROUGH 7)

SINCE LAST REPORT, GIVE REASONS:

9.

10. REASONS FOR RESTRICTIONS, IF ANY:

MONTHLY -YTD- CUMULATIVE

11. HOURS IN REPORT PERIOD: 744 5087 192316.0
12. NUMBER OF HOURS REACTOR 744.0 4965.1 129812.8
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 166.6
14. HOURS GENERATOR ON-LINE 744.0 4956.6 125720.2
15. UNIT RESERVE SHUTDOWN HO 0.0 0.0 577.2 CEX5684 TU7F7367 ~92076
17. GROSS ELECTRICAL ENERGY GENERATED (MWHJ 522755 3499875 84948525
18. NET ELECTRICAL ENERGY GENERATED (MWH) 498158 3335438 80415024
19. UNIT SERVICE FACTOR 100.0 97.4 65.4
20. UNIT AVAILABILITYFA 100.0 97.4 65.7
21. CAPACITY FACTOR (USING MD 100.5 98.5 63.7
22. CAPACITY FACTOR (USING DER NET) 96.6 94.6 60.3
23. UNIT FORCED OUTAGE RATE 0.0 2.6 10.6
24. SHUTDOWNS SCHEDULED OVER NONE
25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

DOCKET NO.

UNIT DATE:

COMPLETE BY:

TELEPHONE:

REPORT MONTH Unit 4 operated at essentially 100% reactor power for the month of July.