ML17352B168

From kanterella
Revision as of 12:49, 10 September 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Monthly Operating Rept for Apr 1995 for Turkey Point Units 3 & 4.W/950512 Ltr
ML17352B168
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 04/30/1995
From: KNORR J E, PLUNKETT J F
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
L-95-145, NUDOCS 9505190385
Download: ML17352B168 (12)


Text

P RI C)RIP'Y (ACCELERATLD RIDS PROCESSIi~

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C AUTH.NAME AUTHOR AFFILIATION KNORR,Z.E.

Florida Power&Light Co.PLUNKETT,J.F.

Florida Power&Light Co.RECIP.NAME RECIPIENT AFFILIATION DOCKET 05000250 05000251 P.R

SUBJECT:

Monthl rept for Apr 1995 for Turkey Point Units 3&4./950512 l DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE: TITLE: Monthly Operating Report (per Tech Specs)NOTES: RECIPIENT ID CODE/NAME PD2-1 PD INTERNAL: AEOD/SPD/RRAB NRR/DIS P/PI PB RGN2 EXTERNAL: LITCO BRYCE,J H NRC PDR COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME CROTEAU,R~AXLE CENTRE 01 NRR/DOPS/OECB NOAC COPIES LTTR ENCL 1 1 1 1 1 1 1 1 U N YOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE iVKSTE!COYTACT'I'HE

'DOCL'WfEN'I'ONTROL DESK, ROOb,f PI-37 (EAT.504-083)TO ELDER I NATE YOL'R NAif L P ROif DISTRI 8 UTIOY LIS'I'S I'OR DOC!.'if EN'I'S YOI'ON" I'l I," D!TOTAL NUMBER OF COPIES REQUIRED: LTTR 10 ENCL 10 MAY 12 1995 L-95-145 10 CFR 50.36 U.S.Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C.20555 Gentlemen:

Re: Turkey Point Units 3 and 4 Docket Nos.50-250 and 50-251 In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of NUREG-0020, attached are the April 1995 Operating Status and Summary of Operating Experience Reports for Turkey Point Units 3 and 4.Very truly yours, T.F.Plunkett Vice President Turkey Point Plant JEK Attachments cc: S.D.Ebneter, Regional Administrator, Region II, USNRC T.P.Johnson, Senior Resident Inspector, USNRC, Turkey Point.'Plant i SQO>=9505i F0385 moe30--PDR ADOCK 05000250 R PDR an FPL Group co'mpany I

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.UNIT NAME: DATE: COMPLETED BY: TELEPHONE:

REPORT MONTH No.Date Duration (Hours)Reason Method of Shutting Down Reactor'icensee Event Reportt System Code Component Code'ause 4 Corrective Action to Prevent Recurrence 02 950407 40.0 95-004 CRDRVE Replace contzol rod drive mechanism power supply F-Forced S-Scheduled Reason A-Equipment Failure B-Maintenance or Test C-Refueling D-Regulatory zestriction E-Operator Training 4 License Examination F-Administrative G-Operational Error (Explain)H-Other (Explain)Method 1-Manual 2-Manual Scram 3-Automatic Scram 4-Continued 5-Load Reduction 9-Other (Explain)Exhibit G-Instructions for Preparation of Data Entry Sheets Licensee Event Roport (LER)File (NVREG-0161)

Exhibit 1-Same Source DOCKET NO.UNIT DATE COMPLETED BY TELEPHONE MONTH AVERAGE DAILY POWER LEVEL (MWe-Net)4/01/95 4/02/95 4/03/95 4/04/95 4/05/95 4/06/95 4/07/95 4/08/95 4/09/95 4/10/95 4/11/95 4/12/95 4/13/95 4/14/95 4/15/95 4/16/95 4/17/95 4/18/95 4/19/95 4/20/95 4/21/95 4/22/95 4/23/95 4/24/95 4/25/95 4/26/95 4/27/95 4/28/95 4/29/9S 4/30/95 675 653 690 697 682 689 596 0 99 671 672 684 684 684 680 682 681 678 671 684 687 679 678 680 673 677 649 649 680 678

OPERATING STATUS OPERATING DATA REPORT DOCKET NO 50-250 DATE 5/8/95 CONTACT J.E.KNORR TELEPHONE 305/246/6757 1.UNIT NAME: TURKEY POINT UNIT 3 2.REPORTING PERIOD: APRIL 1995 3.LICENSED THERMAL POWER (MWT): 2200 4.NAMEPLATE RATING (GROSS MWE): 760 6.MAXZMUM DEPENDABLE CAPACITY (GROSS MHL~699 7.MAXIMUM DEPENDABLE CAPACITY (NET MWE): 666 8.ZF CHANGES OCCUR IN CAPACITY RATINGS (ITEH~MBER 3 THROUGH 7)SINCE LAST REPORT, GIVE REASONS: 9.I 10.REASONS FOR RESTRICTIONS, IF ANY: MONTHLY-YTD-CUMULATIVE ll.HOURS IN REPORT PERIOD: 12.NUMBER OF HOURS REACTOR 13.REACTOR RESERVE SHUTDOWN HOURS 14.HOURS GENERATOR ON-LINE 15.UNIT RESERVE SHUTDOWN HO 17.GROSS ELECTRICAL ENERGY GENERATED (MWHj 18.NET ELECTRICAL ENERGY GENERATED (MWH)19.UNIT SERVICE FACTOR 20.UNIT AVAILABILITY FA 21.CAPACITY FACTOR (USING MD 22.CAPACITY FACTOR (USING DER NET)23.UNIT FORCED OUTAGE RATE 24.SHUTDOWNS SCHEDULED OVER REFUELING SCHEDULED SEPTEMBER 1995 719 683.7 0.0 679.0 0.0 T4 74256 478297 455084 94.4 94.4 95.0 91.3 5.6 2879 2843.7 0.0 2839.0 0.0 ETF6016 2024742 1930785 98.6 98.6 100.7 96.8 1.4 196376.6 131822.1 844.4 129887.7 121.8 Y7U331950 86786206 82125212 66.1 66.2 63.8 60.3 11.1 25.IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

DOCKET NO.UNIT DATE: COMPLETED BY: TELEPHONE:

REPORT MONTH Unit 3 operated at essentially 100%reactor power until April 7.On April 7 the unit was manually shut down to replace a control rod drive power supply.The unit was manually tripped from the intermediate range when the power supply failed.The unit was returned to power on March 9, and remained at essentially 100%power for the remainder of the month.

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.UNIT DATE COMPLETED BY TELEPHONE MONTH AVERAGE DAILY POWER LEVEL (MWe-Net)4/01/95 4/02/95 4/03/95 4/04/95 4/05/95 4/06/95 4/07/95 4/08/95 4/09/95 4/10/95 4/11/95 4/12/95 4/13/95 4/14/95 4/15/95 4/16/95 4/17/95 4/18/95 4/19/95 4/20/95 4/21/95 4/22/95 4/23/95 4/24/95 4/25/95 4/26/95 4/27/95 4/28/95 4/29/95 4/30/95 679 657 693 696 694 688 686 686 683 677 685'85 684 683 682 683 681 679 679 679 680 679 677 683 672 678 695 682 683 685 UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NQ.UNIT NAME: DATE: COMPLETED BY: TELEPHONE:

REPORT MONTH No.Date Type Duration (Hours)Reason Method of Shutting Dawn Reactor Licensee Event Roportf System Code Component code'ause&Corzectivo Action to Pzovont Recurrence N/A P-Porced S-Scheduled Reason A-Equipmont Eailuro B-Maintenance or Test C-Refueling D-Regulatory restriction E-Operator Training&License Examination F-Administrative G-Operational Error (Explain)H-othoz (Explain)Method 1-Manual 2-Manual Scram 3-Automatic Scram 4-Continued 5-Load Reduction 9-Other (Explain)Exhibit G-Xnstructions for Preparation of Data Entry Sheets Licensee Event Report (LER)Pile (NUREG-0161)

Exhibit 1-same Source OPERATING STATUS OPERATING DATA REPORT DOCKET NO 50-251 DATE 5/8/95 CONTACT J.E.KNORR TELEPHONE 305/246/6757 1.UNIT NAME: TURKEY POINT UNIT 4 2.REPORTING PERIOD: APRIL 1995 3.LICENSED THERMAL POWER (MWT): 2200 4.NAMEPLATE RATING (GROSS MWE): 760**RW: 6.MAXIMUM DEPENDABLE CAPACITY (GROSS MRE): 699 7.MAXIMUM DEPENDABLE CAPACITY (NET MWE): 666 8.IF CHANGES OCCUR IN CAPACITY RATINGS (ITEH~MBER 3 THROUGH 7)SINCE LAST REPORT, GIVE REASONS: 9./0.REASONS FOR RESTRICTIONS, IF ANY: MONTHLY-YTD-CUMULATIVE 1.HOURS IN REPORT PERIOD: 2.NUMBER OF HOURS REACTOR 3.REACTOR RESERVE SHUTDOWN HOURS 4.HOURS GENERATOR ON-LINE 5.UNIT RESERVE SHUTDOWN HO 7.GROSS ELECTRICAL ENERGY GENERATED (MWHj 8.NET ELECTRICAL ENERGY GENERATED (MWH)9.UNIT SERVICE FACTOR 0.UNIT AVAILABILITY FA 1.CAPACITY FACTOR (USING MD ,2.CAPACITY FACTOR (USING DER NET).3.UN1T FORCED OUTAGE RATE.4.SHUTDOWNS SCHEDULED OVER NONE 719 719.0 0.0 719.0 0.0~TE933 514839 491394 100.0 100.0 102.6 98.6 0.0 2879 2757.1 0.0 2748.6 0.0 53%7069 1960091 1868438 95.5 95.5 97.4 93.6 4.5 190108.0 127604.8 166.6 123512.2 577.2 2EUE84778 83408741 78948024 65.0 65.3 63.3 59.9 10.8 5.IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

DOCKET NO.UNIT'ATE'OMPLETE BY: TELEPHONE:

REPORT MONTH Unit 4 operated at essentially 100%reactor power for the entire month.