MONTHYEARIR 05000244/20230042024-02-0505 February 2024 LLC - Integrated Inspection Report 05000244/2023004 ML24026A0112024-01-26026 January 2024 R. E. Ginna Nuclear Power Plant, Relief Request Associated with Inservice Testing of B Auxiliary Feedwater Pump IR 05000244/20230102023-12-19019 December 2023 LLC - Age-Related Degradation Inspection Report 05000244/2023010 ML23348A0992023-12-15015 December 2023 R. E. Ginna Nuclear Power Plant Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0029 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML23347A0092023-12-13013 December 2023 Annual Commitment Change Notification ML23346A0142023-12-12012 December 2023 LLC - Senior Reactor and Reactor Operator Initial License Examinations ML23341A1252023-12-0707 December 2023 Supplemental Response to Part 73 Exemption Request - Withdrawal of Request for Exemption from 10 CFR 73, Subpart B, Preemption Authority Requirements ML23321A1392023-11-17017 November 2023 Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information and Request for Additional Information ML23317A1192023-11-10010 November 2023 Constellation Energy Generation, LLC - 2023 Annual Report - Guarantees of Payment of Deferred Premiums IR 05000244/20230032023-10-25025 October 2023 LLC - Integrated Inspection Report 05000244/2023003 ML23292A0282023-10-19019 October 2023 LLC - Notification of Conduct of a Fire Protection Team Inspection RS-23-097, Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans2023-10-12012 October 2023 Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans RS-23-108, Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator Pressure Retaining Welds and Full Penetration Welded Nozzles2023-10-11011 October 2023 Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator Pressure Retaining Welds and Full Penetration Welded Nozzles RS-23-105, Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections2023-10-10010 October 2023 Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections ML23258A1382023-09-18018 September 2023 Request for Information and Notification of Conduct of IP 71111.21.N.04, Age-Related Degradation, Reference Inspection Report 05000244/2023010 IR 05000244/20230052023-08-31031 August 2023 Updated Inspection Plan for R.E. Ginna Nuclear Power Plant, LLC (Report 05000244/2023005) ML23158A1952023-08-30030 August 2023 R. E. Ginna - Issuance of Amendments to Adopt TSTF-273-A, Revision 2, Safety Function Determination Program Clarifications ML23235A1722023-08-23023 August 2023 Re. Ginna Nuclear Power Plant, Transmittal of 2023 Owner'S Activity Report IR 05000244/20234012023-08-15015 August 2023 LLC - Material Control and Accounting Program Inspection Report 05000244/2023401 (Cover Letter Only) IR 05000244/20230022023-08-0303 August 2023 LLC - Integrated Inspection Report 05000244/2023002 ML23191A0592023-07-21021 July 2023 R. E. Ginna Nuclear Power Plant - Issuance of Amendment No. 155 Adoption of TSTF-577, Revised Frequencies for Steam Generator Tube Inspections, Revision 1 IR 05000244/20234022023-07-19019 July 2023 R. E. Ginna Nuclear Power Plant - Security Baseline Inspection Report 05000244/2023402 (Cover Letter Only) RS-23-083, Withdrawal - Proposed Alternatives Related to the Steam Generators2023-06-27027 June 2023 Withdrawal - Proposed Alternatives Related to the Steam Generators RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations RS-23-050, Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube.2023-05-22022 May 2023 Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube. ML23135A0412023-05-15015 May 2023 2022 Annual Radioactive Effluent Release Report and 2022 Annual Radiological Environmental Operating Report ML23121A0482023-05-0101 May 2023 R. E. Ginna Nuclear Power Plant Core Operating Limits Report Cycle 44, Revision 0 ML23114A2522023-04-28028 April 2023 Request to Use a Provision of a Later Edition of the ASME Boiler & Pressure Vessel Code, Section XI IR 05000244/20230012023-04-26026 April 2023 LLC - Integrated Inspection Report 05000244/2023001 ML23100A0302023-04-10010 April 2023 2023 10 CFR 50.46 Annual Report ML23114A1152023-03-29029 March 2023 Electronic Reporting of Exposure Data for 2022 RS-23-049, Constellation Energy Generation, LLC, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-23023 March 2023 Constellation Energy Generation, LLC, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations ML23075A0872023-03-15015 March 2023 R. E. Ginna Nuclear Power Plant - Project Manager Assignment ML23061A1632023-03-0303 March 2023 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch 3 IR 05000244/20220062023-03-0101 March 2023 Annual Assessment Letter for R.E. Ginna Nuclear Power Plant, LLC (Report 05000244/2022006) ML22364A0242023-03-0101 March 2023 R. E. Ginna Nuclear Power Plant Issuance of Amendments Nos. 231, 231, 232, 232, and 154 Regarding Adoption of TSTF-246 ML23060A1622023-03-0101 March 2023 R. E. Ginna Nuclear Power Plant, Supplemental Information - Proposed Alternatives Related to the Steam Generators RS-23-045, Constellation Energy Generation, LLC Submittal of Fitness for Duty Performance Data Reports for 2022 Per 10 CFR 26.717(c) & 10 CFR 26.2032023-02-28028 February 2023 Constellation Energy Generation, LLC Submittal of Fitness for Duty Performance Data Reports for 2022 Per 10 CFR 26.717(c) & 10 CFR 26.203 ML23005A1762023-02-23023 February 2023 R. E. Ginna Nuclear Power Plant - Issuance of Amendment No. 153 Revise Technical Specifications (TS) for the Spent Fuel Pool Charcoal System and Two (2) TS Administrative Changes ML23005A1222023-02-22022 February 2023 R. E. Ginna Nuclear Power Plant - Issuance of Amendment No 152 Adopt TSTF-315-Revise Technical Specification 3.1.8, Physics Tests Exceptions - Mode 2 RS-23-040, Constellation Energy Generation, LLC, Supplemental Information - Proposed Alternatives Related to the Steam Generators2023-02-21021 February 2023 Constellation Energy Generation, LLC, Supplemental Information - Proposed Alternatives Related to the Steam Generators ML22287A0692023-02-0808 February 2023 R. E. Ginna Station - Forward Fit Analysis (Epids L-2022-LRR-0074, 0076, 0079, 0091, 0092, 0093 and 0094) ML23031A2992023-02-0707 February 2023 R. E. Ginna Nuclear Power Plant - Withdrawal of an Amendment Request ML23010A0112023-02-0101 February 2023 R. E. Ginna Nuclear Power Plant - Issuance of Relief Request Associated with Inservice Testing of Refueling Water Storage Tank Outlet Value RS-23-003, Constellation Energy Generation, LLC, Summary of Changes to Quality Assurance Topical Report, NO-AA-10, and Decommissioning Quality Assurance Program, NO-DC-102023-01-31031 January 2023 Constellation Energy Generation, LLC, Summary of Changes to Quality Assurance Topical Report, NO-AA-10, and Decommissioning Quality Assurance Program, NO-DC-10 IR 05000244/20223012023-01-20020 January 2023 Initial Operator Licensing Examination Report 05000244/2022301 IR 05000244/20220122023-01-12012 January 2023 LLC - Design Basis Assurance Inspection (Teams) Inspection Report 05000244/2022012 ML22362A0382022-12-28028 December 2022 R. E. Ginna Nuclear Power Plant - Letter to Withdraw Application to Revise Technical Specifications 5.6.5, Core Operating Limits Report (COLR) ML22348A2062022-12-14014 December 2022 Re. Ginna Nuclear Power Plant - Annual Commitment Change Notification RS-22-123, Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator2022-12-0707 December 2022 Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator 2024-02-05
[Table view] Category:License-Monthly Operating Report
MONTHYEARML0510903042005-04-0808 April 2005 March 2005 Monthly Operating Report for R.E. Ginna Nuclear Power Plant ML0508903502005-03-11011 March 2005 February 2005 Monthly Operating Report for R.E. Ginna Nuclear Power Plant ML0505302232005-02-0909 February 2005 January 2005 Monthly Report for R.E. Ginna Nuclear Power Plant ML0501902012005-01-0707 January 2005 December 2004 Monthly Operating Report for the R.E. Ginna Nuclear Power Plant ML0436303412004-12-10010 December 2004 November 2004 Monthly Operating Report for R.E. Ginna Nuclear Power Plant ML0432203622004-11-10010 November 2004 October 2004 Monthly Operating Report for R.E. Ginna Nuclear Power Plant ML0428804842004-10-0808 October 2004 September 2004 Monthly Report for R E Ginna Nuclear Power Plant ML0426600732004-09-10010 September 2004 August 2004 Monthly Report for R.E. Ginna Nuclear Power Plant ML0423105522004-08-10010 August 2004 July 2004 Monthly Operating Report for R E Ginna ML0420803112004-07-0909 July 2004 June 2004 Monthly Operating Report for R.E. Ginna Nuclear Power Plant ML0417406162004-06-10010 June 2004 May 2004 Monthly Report for R.E. Ginna Nuclear Power Plant ML0413404292004-05-10010 May 2004 April 2004 Monthly Operating Report, R. E. Ginna Nuclear Power Plant ML0411305012004-04-0909 April 2004 March 2004 Monthly Operating Report for Ginna Nuclear Power Plant ML0407607272004-03-0909 March 2004 February 2004 Monthly Operating Report for R.E. Ginna Nuclear Power Plant ML0404905182004-02-0909 February 2004 January 2004 Monthly Operating Report for R.E. Ginna Nuclear Power Plant ML0402104802004-01-0909 January 2004 December 2003 Monthly Operating Report for R E Ginna Nuclear Power Plant ML0335002382003-12-0909 December 2003 November 2003 Monthly Operating Report for R.E. Ginna ML0332400652003-11-10010 November 2003 October 2003 Monthly Report for R. E. Ginna Nuclear Power Plant ML0328804542003-10-0909 October 2003 September 2003 Monthly Operating Report for R. E. Ginna ML0326610622003-09-10010 September 2003 August 2003 Monthly Operating Report Ginna Nuclear Power Plant ML0322704182003-08-0707 August 2003 July 2003 Monthly Operating Report for R.E. Ginna Nuclear Power Plant ML0319804382003-07-10010 July 2003 June 2003 Monthly Operating Report for R.E. Ginna Nuclear Power Plant ML0316812672003-06-10010 June 2003 May 2003 Monthly Operating Report for R.E. Ginna ML0314006772003-05-0909 May 2003 April 2003 Monthly Operating Report for R.E. Ginna Nuclear Power Plant ML0314005802003-05-0909 May 2003 September 2001 Monthly Operating Report for R.E. Ginna Nuclear Power Plant ML0310704452003-04-10010 April 2003 March 2003 Monthly Operating Report for R.E. Ginna Nuclear Power Plant ML0307704542003-03-10010 March 2003 February 2003 Monthly Operating Report for R.E. Ginna Nuclear Power Plant ML0305202172003-02-10010 February 2003 January 2003 Monthly Operating Report for R. E. Ginna Nuclear Power Plant ML0301706072003-01-10010 January 2003 December 2002 Monthly Operating Report for R. E. Ginna ML0235205042002-12-0909 December 2002 November 2002 Monthly Operating Report for R.E. Ginna ML0231900622002-11-0808 November 2002 October 2002 Monthly Operating Report for R.E. Ginna ML0229000102002-10-0909 October 2002 September 2002 Monthly Operating Report for R.E. Ginna ML0226006432002-09-10010 September 2002 August 2002 Monthly Operating Report for R. E. Ginna ML0223102702002-08-0707 August 2002 July 2002 Monthly Operating Report for R. E. Ginna Nuclear Power Plant ML0221203692002-07-12012 July 2002 June 2002 Monthly Operating Report for R.E. Ginna Nuclear Power Plant ML0217101442002-06-10010 June 2002 May 2002 Monthly Operating Report for R. E. Ginna Nuclear Power Plant, Revision ML0215004232002-05-17017 May 2002 April 2002 Monthly Operating Report for R. E. Ginna Nuclear Power Plant ML0214204182002-05-0606 May 2002 April 2002 Monthly Operating Report for R.E. Ginna Nuclear Power Plant ML0210904432002-04-10010 April 2002 March 2002 Monthly Operating Report for R.E. Ginna Nuclear Power Plant ML0208604272002-03-0808 March 2002 February 2002 Monthly Operating Report for R.E. Ginna Nuclear Power Plant ML0205802142002-02-11011 February 2002 January 2002 Monthly Operating Report for R. E. Ginna Nuclear Power Plant ML0203504532002-01-10010 January 2002 December 2001 Monthly Operating Report for R.E. Ginna Nuclear Power Plant ML18142B3881976-02-0909 February 1976 R. E. Ginna - Forwards Revised (Item #6) Operating Data Report for Month of January 1976 ML18142B3891976-02-0606 February 1976 R. E. Ginna - Forwards Monthly Operating Status Report for Month of January 1976 ML18142B3901976-01-0808 January 1976 R. E. Ginna - Forwards Revised Unit Shutdown and Power Reduction Data Sheet for Monthly Operating Report for December 1975 ML18142B3911976-01-0808 January 1976 R. E. Ginna - Forwards Monthly Operating Status Report for Month of December 1975 ML18142B3921975-12-0404 December 1975 R. E. Ginna - Forwards Monthly Operating Status Report for Month of November 1975 ML18142B3931975-11-0606 November 1975 R. E. Ginna - Forwards Monthly Operating Status Information for Month of October 1975 ML18142B3941975-10-0202 October 1975 R. E. Ginna - Forwards Operating Status Information for Month of September 1975 ML18142B3951975-09-0505 September 1975 R. E. Ginna - Forwards Operating Status Information for Month of August 1975 2005-04-08
[Table view] |
Text
MONTHLY" PORTS iFOR GRAY BOOK PREPARATT0%
NRC bsoTRIBUTION FOR PART 50 DOCKE.'IATERIAL (TEMPORARY FORM)CONTROL NO: FILE MONTHLY REPORT FILE oc ester Gas&Elec.C rg,qTEOF DOC Rochester; N.Y.C.E.P1att ORIG DATE R EC'D LTR CC OTHER TWX RPT.OTHER s NRC CLASS UNCLASS PROPINFO XXX DESCRIPTION:
'Ltr trans the following:
1 Si ned INPUT LO NO CYS REC'D DOCKET NO: ENCLOSURES:
Monthly Report for DeCember 1975 Plant&Component Operability
&Availability This Report to be used in preparing Gray Book by Plans&Operations.
NUMBER OP COPIES REC'D: PLANT NAME: FOR ACTION/INFORMATION BUTLER (L)W/Copies CLARK (L)\A//Copssss'ARR (L)W/Copies KNtEt (L)W/Copies G FI~NR DR OGC, ROOM P-506A.GOSSI CK/STAF F CASE/BOYD MOORE (L)DEYOUNG (L)SKOVHOLT (L)GOLLER{L){Ltr)P.COLLINS DENISE REG OPR FI I.F.6 REGION (2)STEELE SCHWENCER (L)W/Copies STOLZ (L)W/Copies VASSALLO (L)-W pies RPLE (L)W/Copies TECH REVIEW SCHROEDER MACCARY KNIGHT PAWLI CKI SHAO STE LLO HOUSTON NOVAK ROSS IPPOLI TO TEDESCO J.COLLINS LAI NAS BENAROYA VOLLMER tNTERNAL DtSTRIBUTION LIC ASST R.DIGGS (L)H.GEAR IN (L)E.GOULBOURNE P.KREUTZER (E)J.LEE (L)M.RUSHBROOK (L)FNVIRO S.REED (EI MULLER'.S VICE (t)DICKER.SHEPPARD (L)KNIGHTON M.SLATER (E)YOUNGBLOOD H.SMITH (L)REGAN S.TEETS (L)PROJECT LDR G.WILLIAMS (E)V.WILSON (L)HARLESS R.INGRAM (L)M DUN A~N EXTERNAL DISTRIBUTION A/T I ND~8 RAITMAN SALTZMAN (L)MELTZ DENTON GRIMES GAMM ILL KASTNER BALLARD SPANGLER PLANS~MCDONALD~CHAPMAN DUBE (Ltr)E.COUP.E PETERSON HARTFIELD (2)KLECKER E ISENHUT Wl GG INl ON K.PARRISH L ZIEMANN (L)BEGAN (E)W/Copies Vil/Copies+0 NOT REMO~DICKER (E)LEAR (L)KNIGHTON (Ei SPELS W/.Copies W/Copies YOUNGBLOOD (E)>>MIPC/PE W/Copies W,4 Copies~1-LOCAL PDR~~Mm Rochester, N.Y.~'l-TIC (ABERNATHY)
(1}(2)('IO)
-NATIONAL LABS~1-NSIC (BUCHANAN) 1-W.PENNINGTON, Rm E-201 GT 1-ASLB 1-CONSULTANTS s 1-Newton Anderson NEWMARK/BLUME/AG BABI AN-ACRS HOLDING/SENT 1-P D R-SAN/LA/N Y 1-BROOKIHAVEN NAT LAB 1-G.ULRIKSON, ORNL 1-AGMED (RUTH GUSSMAN)Rm B-127.GT 1-J.D.RUNKLES, Rm E-201 GT P~
', t ZW///SIXES//I/IIII'ZFiH':
/////I//8'///I///////
ROCHESTER GAS AND ELECTRIC CORPO cj T AVENUE, ROCHESTER, N.Y.14649 URIEL JP, ge.lBES.>~-.r TELEIIHONE AREA coDE 7ld 546-2700 Ginna Station January 8, 1976~ReguTatorP
'Ajtk.N<'irector, Office of Inspection and Enforcement U.S.Nuclear Regulatory Commission Washington, D.C.20555 1 (P i~l/N e
Subject:
Monthly Report for December, 1975 (Revised)Operating Status Information R.E.Ginna Nuclear Power Plant Unit No.1 Docket No.50-244 Gentlemen:
Pursuant to Technical Specification 6.9.1c attached herewith is a re-vised unit shutdown and power reduction data sheet, to correct previous error in reporting reasons for reductions in reactor power levels on 12/13, 12/21 and 12/23.Very truly yours, gtP Charles E.Platt Superintendent CEP:fah Attachments 1 cc: Mr.James P.O'Reilly, NRC (1)Mr.William G.McDonald, NRC (2) t I 11 DOCKET NO.50-244
SUMMARY
- The reactor power levels averaged 99%during the period.The major exceptions were the power reduc-tions and Outage 814 detailed below.REPORT MONTH GINNA STATION, UNIT PI January 8, 1976(Revision)
DATE COMPLETED BY Andrew E.McNamara, Operations Aide TELEPHONE Ext.291-214, at Ginna UNIT SHUTDOWN AND POWER REDUCTIONS NO.DATE TYPE F-FORCED S-SCHEDULED DURATION (HOURS)REASON (I)METHOD OF SHUTTING DOWN THE REACTOR OR REDUCING POWER (2)CORRECTIVE ACTIONS/COMMENTS N/A 75 12 13 Reactor power level reduction to~47%=to perform T-'8B, Turbine Main Steam Stop Valves test.N/A 75 12 21 A Reactor power level reduction to~47%to perform M-54.2, Check condenser 1B-1 Water Box for Leaks with Freon.N/A 75 12 23 A Reactor power level reduction to~47%to perform M-54.2, Check condenser 1B-1 Water Box for Leaks, with Freon.14 75 12 30 43.75 See Note)"B" Steam Generator-Tube Leak NOTE: Unit remained shutdown through the end of report month.(I)REASON: (2)METHOD: A-EOUIPMENT FAILURE (EXPLAIN)I-MANUAL B-MAINT.OR TEST 2-MANUAL SCRAM C-REFUELING 3-AUTOMATIC SCRAM D-REGULATORY RESTRICTION 4-OTHER (EXPLAIN)E-OPERATOR TRAINING AND LICENSE EXAMINATION F-ADMINISTRATIVE G-OPERATIONAL ERROR (EXPLAIN)H-OTHER (EXPLAIN).+Power reductions were not previously reported.Data not available.
Commencing January 1, 1976, this data wig bp pegprteg.~9 0 L'~,
DOCKET RO.50-2i:C 5!ARY I The reactor power levels averaged 99Z durirg the period.The ma)or exceptions vere the power reduc-tions and Oueage F'14 deeailed be'v.REPORT MONTH UVIT RAvE DATE GIRRA STATlos, UR'T AI January 8, 1976(Revision)
COMPLETED SY Andzev E.McNamara, Operations Aide TELEPHONE-7 4 Ext.291-214, at Ginra UNIT S-uTDOIY'N AND POWER REDUCTIONS NO.DATE TYP E F-FORCED S-SCHEDUI.ED DURAT I OiN (HOURS)REASON (I)METHOD OF SHUTTING DOWN THE REACTOR OR REDUCING POWER (2)CORRECT I VE ACT I ONS/COLNENTS N/A 75 12 13 Reactor power level reduction toL 47Z to perform T-18B, Turbine venin Seeam Stop Ualves test.N/A 75 12 21 0 Reactor power level reduction toŽ47Z to perform M-54.2, Check condenser 1B-1 Mater Box for Leaks vith Freon.N/A 75 12 23 Reactor power level reduceion to I47Z to perform N-54.2, Check condenser 1B-1 Mater Box for Leaks, with Freon.75 12 30 43.75 See Note)"B" Steam Generator-Tube Leak NOTE: Unit remained shutdown thzough the end of zeport onth.(I)REASORI (2)MEiHOOI A EOUIPME.T FAILURE (EXPLAIII)
I VARUAL S MAINT.OR TEST 2-MARUA'cRAv.
C-REFUELING 3-AUTOVATIC SCRAM 0-REGUlATORY RESTRICTION 4-OTHER (EXPLAIN)E OPERATOR TRAII<IRG ARO lICEiiSE EXAvlRATIOR F-ADMINISTRATIVE OPERATIONAL ERROR (EXPLAIN)H OTHER (EXPL*III)
RPower reducti'ons were not previously reported.Data not available.
Commencing Januazy 1, 1976, this data I
>
DOCKET NO.50-244 PIARYI The reactor power levels averaged 99X during the period.The ma/or exceptions were the power reduc-tions and Outage 814 detailed below.REPORT MONTH DATE GIMNA STATION OMIT>
~.
DIARY I The reactor pover levels averaged 99Z during the period.The ma)or exceptions
'were the power reduc-tions and Outage 814 detailed belov.REPORT MONTH DOCKET NO.50-244 UNIT NAME GINNA STATIDN.UNIT<I January 8, 1976(Revision)
DATE COVPLETEO SY Andrew E.McNamara, Operations Aide TELEPHONE 7 6-4 Ext.291-214, at Ginna UNIT SI-QTDOWN AND POWER REDUCTIONS DATE TYPE F-FORCED S-SCHEDULED DURATION (HOURS)REASON (I)METHOD OF SHUTTING DOWN THE REACTOR OR REDUCING POWER (2)CORRECTIVE ACTIONS/COAIVENTS N/A 75 12 13 0 B Reactor power level reduction to~47Z to perfo~T-18B, Turbine Yogin Steam Stop Valves test.N/A N/A 75 12 21 75 12 23 0 0 Reactor power level reduction toŽ47Z to perform iM.-54.2, Check condenser 1B-1 Mater Box for Leaks with Freon.Reactor power level reduction to~47Z to perform if-54.2, Check condenser 1B-1 Vater Box for Leaks, with Freon.14 75 12 30 43.75 See Note)"B" Steam Generator-Tube Leak NOTE: Unit remained shutdown through the end of report onth.(I)REASON!(2)METNODI A-EQUIPME::T FAILURE (EXPLAIN)I-VasuaL D-MAINT.OR TEST 2-MANUA'cRav.
C-REFUELING 3-AUTGvaTIc scpav D-REGULATORY RESTRICTION 4-OTNER (EXPLA!N)E OPERATOR TRAINING ANO I.ICENSE EXAMINaTION F-ADMINISTRATIVE G-OPERATIONAL ERROR (EXPLAIN)H OTIIER'(EXPLAIN)
~power reductions were not.previouslv reported.Data not available.
Connencing January 1, 1976, this data wiQ bp,ge@rte>'c UNIT NAVE GINNA STATION, UNIT AI January 8, 1976(Revision)
DATE COMPLETED 8Y Andrew E.McNamara, Operations Aide TELEPHONE 7 4 Ext.291-214, at Ginna UNIT S.uTDOWN AND POWER REDVCTI(NS NO." DATE TYPE F-FORCED S-SCHEDUI.ED DURATION (HOURS)REASON (I)METHOD OF SHUTTING DOWN THE REACTOR OR REDUCING POWER (2)CORRECT I VE ACT I ONS/CO.'i'MENTS N/A 75 12 13 0 B Reactor power level reduction toL"47X to perform T-18B, Turbine Main Steam Stop Valves test.N/A 75 12 21 0 Reactor power level reduction to~47X to perform M-54.2, Check condenser lB-1 Water Box for Leaks with Freon.N/A 75 12 23 S.0 A Reactor power level reduction to I47/to perform M-54.2, Check condenser 1B-1 Water Box for Leaks, with Freon.14 75 12 30 43.75*See Note)"B" Steam Generator-Tube Leak NOTE: Unit remained shutdown through the end of report=anth.(I)REASON: (2)METHOOr A-EOUIPMENT FAILURE (EXPLAIN)I-MANUAL 8-MAINT.OR TEST 2 MANUAL scRAV C-REFUELING 3 AU OuATIC SCRAu D-REGVLATORY RE'STRICTION 4-OTHER (EXPL*III)
F.-OPERATOR TR*INI:IG ANO LICENSE EXAul>>lATION F-ADMINISTRATIVE G OPERATIONAL ERROR (EXPLAIN)H-OTHER (EXPLAI.'I)
~Power reductions were not previously reported.Data not aVailable.
CODmreneing January 1, 1976, thiS data WiQ bp pep>rtegr t O.
DOCKET NO.50-24'.!ARY I The reactor pover levels averaged 99X during the period.The ma)or exceptions vere the power reduc-tions and Outage II14 detailed below.REPORT MONTH UNIT NAME GLNVA STATIOV, UNIT LI January 8, 1976(Revision)
DATE COMPLETED SY Andrew E.McNamara, Operations Aide TEIEPHONE-7-4 Ext.291-214, at Ginna UNIT 3-uTDOII AND POWER REDUCTIONS DATE TYPE F-FORCED S-SCHEDULED DURATION (HOURS)REASON (I)METHOD OF SHUTTING DOWN THE REACTOR OR REDUCING POWER (2)CORRECT I VE ACTIONS/COIN!
ENTS N/A 75 12 13 0 B Reactor power level reduction to'A 47X to perform T-18B, Turbine venin Steam Stop Ualves test.N/A 75 12 21 0 Reactor power level reduction toŽ47K to perform)(-54.2, Check condenser 1B-1 Water Box for Leaks vith Ereon.N/A 75 12 23 0 Reactor power level reduction to~47X to perform M-54.2, Check condenser 1B-1 Water Box for Leaks, with Freon.14 75 12 30 43.75 See Note)"B" Steam Generator-Tube Leak NOTE: Unit remained shutdown through the end of report onth.(I)REASOV: A EOUIPAtE;:T FAILURE (EXPLAIN)8-MAINT.OR TEST C-REFUELING D-REGULATORY RESTRtCTION E OPERATOR TRAINING AND LICENSE EXAMINATION F ADAIINISTRATIVE G OPERATIONAL ERROR (EXPLAIN)H-OTHER (EXPLAIN)~Power reductions vere not previously reported.Data not available.
Commencing January 1, 1976, this data viQ bp,ge@rtegt>>
~.>A DOCKET NO.50-244'MARY: The reactor power levels averaged 99%during the period.The ma)or exceptions were the power reduc-tions and Outage 814 detailed below.REPORT MONTH UV I'T VAilE Gl NNA STA'Tl OV, UV I~>
DOCKET NO.50-2(4 t.'!PRY I The reactor power levels averaged 99X during the period.The ma)or exceptions vere the power reduc-tions and Outage f14 detailed below.REPORT NORTH UVIT VAvE GINVA STATIOV.~v!T=', DATE January 8, 1976(Revision)
COMPLETED 8Y Andrew E.McNamara, Operations Aide TELEPHONE-7-4 Ext.291-214, at Ginna UNIT SI-IUTOOWiil AND POWER RFOUCTIGMS DATE TYP E F-FORCED S-SCHEDULED DURATION (HOURS)REASON (I)METHOD OF SHUTTING DOIlVN THE REACTOR OR REDUCING POPOVER (21 CORRECTIVE ACTIONS/CONTENTS N/A>>75 12 13 Reactor power level reduction toA"47X to perform T-18B, Turbine Ruin Steam Stop Valves test.N/A 75 12 21 0 Reactor power level reduction to~47X to perform)(-54.2, Check condenser lB-1 Mater Box for Leaks with Preon.N/A 75 12 23 0 Reactor power level reduction to~47!to perform H-54.2, Check condenser 1B-1 Vater Box for Leaks, with Freon.14 75 12 30 43.75 See Note)"BH Steam Generator-Tube Leak NOTE: Unit remained shutdown through the end of report onth.(I)REASOMI (2)A!ETHOD: A-EOUIPUE::t FAII.ORE (EXPLAIN)I UAVQAI.8-MAINT.OR TEST 2-MANUAL SCPAv.C-REFUELING 3-AUTOVATIC SCRAM D-REGULATORY RESTRICTION C-OTHER (EXPLAIN)E-OPERATOR TRAINING AND LICENSE EXAvIMATIOV F-ADA'll NI STRATI YE G OPERATIONAL ERROR (EXPLAIN)H-OTHER (EXPI.AIN)
~power reductions were not previously reported.Data not available.
Commencing January 1, 1976, this data w'QT bp ge+rtegt>>
DOCKET NO.50 AC VARY: The reactor power levels averaged 99%during the period.The ma)or exceptions were the power reduc-t'ons and Outage LB14 detailed below.REPORT MONTH UV IT NAVE GINNA STAT I OV, UN I T~l January 8, 1976(Revision)
DATE COMPLETED BY Andrew E.McNamara, Operations Aide TELEPMONE 7 4 Ext.291-214, at Ginna uwtT 3.RJTOORM AND POMER REOUCTIGQS NO.DATE TYPE F-FORCED S-SCHEDULED DURATION (HOURS)REASON (I)hIETHOD OF SHUTTING DOWN THE REACTOR OR REDUCING POWER (2)CORRECTIVE ACTIONS/COI'MENTS N/A 75 12 13 0 Reactor power level reduction toL 47%to perform T-18B, Turbine wain Steam Stop Valves test.N/A 75 12 21 0 Reactor power level reduction to~47%to perform)(-54.2, Check condenser 1B-1 Water Box for Leaks with Preon.N/A 75 12 23 0 Reactor power level reduction to~47%to perform"(-54.2, Check condenser 1B-l Water Box for Leaks, with Freon.14 75 12 30 43.75 See Note)A"B" Steam Generator-Tube Leak NOTFI Unit remained shutdown through the end of repozt onth.(I)REASON: (2)METNODI A-EOUIPME.T FAILURE (EXPLAIN)I VANDAL B-MAINT.OR TEST 2-VANUA'CRAV C REFUELING 3 AUTOVATIC SCRAM D-REGULATORY RESTRICTION OTHER (EXPLAIN)E-OPERATOR TRAltllNG AND LICENSE EXAVINATION F-ADXIINI STRATI YE G OPERATIOVAL ERROR (EXPLAIN)H-OTHER (EXPLAIN)IIPower reductions were not previouslv reported.Data not available.
COIImIencing Januazy I, 1976, this data wig bp,gegrtegt
'0 OOCKET NO.50-24C YI The eactor power levels averaged 99X dur'ng the period.The ma)or exceptions were the power reduc-tions and Outage i14 detailed below.REPORT MONTH UNIT NAVE GINNA STATION,"NIT<>