{{Adams
{{Adams
| number = ML20207R288
| number = ML20212J877
| issue date = 03/12/1987
| issue date = 01/16/1987
| title = Discusses Safety Insp Repts 50-315/86-42 & 50-316/86-42 on 860915-1113 & Forwards Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $50,000
| title = Forwards Safety Insp Repts 50-315/86-42 & 50-316/86-42 on 860915-1113.Violation Identified.Insp Focused on Circumstances Surrounding Unit 2 Operation W/Inoperable Flow Paths in Both Safety Injection Trains
| author name = Davis A
| author name = Norelius C
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
| addressee name = Dolan J
| addressee name = Dolan J
Line 10: Line 10:
| license number =  
| license number =  
| contact person =  
| contact person =  
| document report number = EA-87-013, EA-87-13, NUDOCS 8703170065
| document report number = NUDOCS 8701280349
| package number = ML20207R289
| package number = ML17334B038
| document type = CORRESPONDENCE-LETTERS, NRC TO UTILITY, OUTGOING CORRESPONDENCE
| document type = CORRESPONDENCE-LETTERS, NRC TO UTILITY, OUTGOING CORRESPONDENCE
| page count = 4
| page count = 2
}}
}}


Line 19: Line 19:


=Text=
=Text=
{{#Wiki_filter:-
{{#Wiki_filter:.
    .
.
fg '
JAN 161987
D\b O      Q
  .
  '
Docket No. 50-315 Docket No. 50-316 American Electric Power Service Corporation Indiana and Michigan Electric Company ATTN: Mr. John E. Dolan Vice Chairman Engineering and Construction 1 Riverside Plaza Columbus, OH 43216 Gentlemen:
llt MAR 121987 N s
This refers to the special safety inspection conducted by B. L. Jorgensen and J. K. Heller of this office on September 15 through November 13, 1986, of activities at the Donald C. Cook Nuclear Plant, Units 1 and 2, authorized by NRC Operating Licenses No. DPR-58 and No. DPR-7 The inspection focused on the circumstances surrounding the event identified by the Resident Inspector involving Unit 2 operation with inoperable flow paths in both Safety Injection Trains. The enclosed copy of our inspection report identifies specific areas examined during the inspection. Within these areas, the inspection consisted of a selective examination of procedures and representative records, observations, and interviews with personne We are releasing this report at this time for your information. You will be notified by separate correspondence of our decision regarding enforcement action based on the findings of this inspection. No written response is required until you are notified of any proposed enforcement actio In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter, and the enclosure, will be placed in the NRC Public Document Roo We will gladly discuss any questions you have concerning this inspectio
] Docket No. 50-316  <
License No. OPR-74 EA 87-13 American Electric Power Service Corporation Indiana and Michigan Electric Company ATTN: Mr. John E. Dolan Vice Chairman Engineering and Construction 1 Riverside Plaza Columbus, OH 43216 Gentlemen:
SUBJECT: NOTICE OF VIOLATION AND PROPOSED IMPOSITION OF CIVIL PENALTY (NRC INSPECTION REPORTS NO. 50-315/86042(DRP); NO. 50-316/86042(DRP))
This refers to the routine inspection conducted during the period September 15 through November 13, 1986, of activities authorized by NRC Operating License No. DPR-74 for the D.C. Cook Nuclear Plant, Unit 2. As a result of this inspection, one violation of NRC requirements was identified. The results of the inspection were provided in the above referenced report sent to you by letter dated January 16, 1987. An enforcement confere,ce was held in the Region III office on January 21, 1987, between you and other members of your staff, and myself and other members of the Region III and NRR staff to discuss the violatio '
The event described in the enclosed Notice of Violation and Proposed Imposition of Civil Penalty (Notice) involved your operations staff rendering both Unit 2 independent emergency core cooling system (ECCS) subsystems not operable while Unit 2 was cperating in Mode 1, in violation of the Technical Specification
! Limiting Condition for Operations. The north safety injection pump was not operable in that it had been isolated and de-energized, and the south safety injection pump was not operable in that two of its four injection flow paths had been isolated. This condition existed for approximately twenty hours and was identified several days later during a records review by the NRC Resident Inspection Staf CERTIFIED MAIL RETURN RECEIPT REQUESTED l
l l
8703170065 870312 gDR ADOCK 05000315 PDR


      ---
Sincerely, 8701290349 870116 PDR ADOCK 05000315 G PDR C. E. Nore11us, Director Division of Reactor Projects Enclosure: Inspection Reports No. 50-315/86042(DRP); and No. 50-316/86042(DRP)
_
See Attached Distribution RII II RIII L ,
_
RIbB  /ro e  <-
  .
Burgesp/nma Gul nd  No@reliW  j g Jib (0 ) ) l)WY  Ill TFo /
.
l American Electric Power Service 2  NAR 121987 Corporation Your after-the-fact evaluation of this condition determined that a twenty-three (23) percent reduction in the design margin of the Final Safety Analysis Report ECCS analysis had existed and that the ECCS would still have been capable of meeting its safety function. However, the violation is of concern to the NRC because several licensed operators or senior operators either reviewed this condition prior to its implementation or were later cognizant of its existence and were not aware that this condition was contrary to Technical Specification This deficiency demonstrates the importance of a comprehensive knowledge of system operability requirements and the needed attention to detail by operations staff when removing equipment from service or operating with equipment out of service. To emphasize the significance of this deficiency, I have been authorized, after consultation with the Director, Office of Inspection and Enforcement, to issue the enclosed Notice of Violation and Proposed Imposition of Civil Penalty in the amount of Fifty Thousand Dollars ($50,000) for the violation described in the enclosed Notice. In accordance with the " General itatement of Policy and Procedure for NRC Enforcement Actions," 10 CFR Part 2, Appendix C (1986) (Enforcement Policy), the violation, as described in the enclosed Notice, has been categorized as a Severity Level III. The base civil penalty for a Severity Level III violation is $50,000. The escalation and mitigation factors in the Enforcement Policy were considered and no adjustment has been deemed appropriat You are required to respond to this letter and should follow the instructions specified in the enclosed Notice when preparing your response. In your response, you should document the specific actions taken and any additional action you plan to prevent recurrence. After reviewing your response to this Notice, including your corrective actions, the NRC will determine whether further NRC enforcement action is necessary to ensure compliance with regulatory requirement In accordance with 2.790 of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations, a copy of this letter and its enclosure will be olaced in the NRC Public Document Roo _ _ - _ _ _ - _ _ _ _ _ _ _ _


--
  .
  .
.
American Electric Service   2
American Electric Power Service 3 NMR 121987 Corporation The responses directed by this letter and the enclosed Notice are not subject to the clearance procedures of the Office of Management 'and Budget as required by the Paperwork Reduction Act of 1980, PL 96-51
        '
 
          ' I8EI
Sincerely,
,
_
Corporation Distribution cc w/ enclosure:
6r101:11 sicStd BP A fr.n krei's A. Bert Davis Acting Regional Administrator Enclosures: Notice of Violation and Proposed Imposition of Civil Penalty    .
W. G. Smith, Jr., Plant Manager DCS/RSB(RIDS)
Inspection Reports
      ' No. 50-315/86042(DRP);
No. 50-316/86042(DRP)
cc w/ enclosures:
W. G. Smith, Jr. , Plant Manager DCS/RSB (RIDS)
Licensing Fee Management Branch Resident Inspector, RIII Ronald Callen, Michigan Public Service Commission EIS Coordinator, USEPA Region 5 Office Nuclear Facilities and Environmental Monitoring Section
Licensing Fee Management Branch Resident Inspector, RIII Ronald Callen, Michigan Public Service Commission EIS Coordinator, USEPA Region 5 Office Nuclear Facilities and Environmental Monitoring Section
>
  ,- , _ . - . _ _ . _ . _ _ , _ _ - . . . . . _ _ - , . - _ _ _ - . , _ - - . _ _ _ _ _ . . _ . _ _ - - . _ _ . _ _ . _ . _ _ . . _ . . . . _ _ _ . . . - .
V g@
RIIP RII
/    RIII obe ib  ius '
  .
aperiello 3-n-BF  9A  3 U Da[vis
  . - -. . _- . . ..
 
..
.
American Electric Power Service  .4 MAR 121987 Corporation cc w/ enclosures:
PDR LPOR ACRS SECY CA .
J. Taylor, IE A. Beach, IE P. Milano, IE J. Lieberman, OGC Enforcement Coordinators RI, RII, RIII, RIV, RV i J.. Sniezek, DED/ROGR
'
B. Hayes, 01-
,S. Connelly, CIA J. C. Rooks, AE0D EA File ES File
 
f
,
, . - - , ~ , . _ _ - - ~ ...i-.._,,----,, -
    , -,-~_a--- .x,-.y-. . . _ - ----.-, , -._--.,,-, ,.- , , ,. . ..m, , - , , , , , , , e. , o +.,y- - ,
}}
}}

Latest revision as of 21:23, 18 December 2021

Forwards Safety Insp Repts 50-315/86-42 & 50-316/86-42 on 860915-1113.Violation Identified.Insp Focused on Circumstances Surrounding Unit 2 Operation W/Inoperable Flow Paths in Both Safety Injection Trains
ML20212J877
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 01/16/1987
From: Norelius C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Dolan J
AMERICAN ELECTRIC POWER SERVICE CORP., INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
Shared Package
ML17334B038 List:
References
NUDOCS 8701280349
Download: ML20212J877 (2)


Text

.

.

JAN 161987

.

Docket No. 50-315 Docket No. 50-316 American Electric Power Service Corporation Indiana and Michigan Electric Company ATTN: Mr. John E. Dolan Vice Chairman Engineering and Construction 1 Riverside Plaza Columbus, OH 43216 Gentlemen:

This refers to the special safety inspection conducted by B. L. Jorgensen and J. K. Heller of this office on September 15 through November 13, 1986, of activities at the Donald C. Cook Nuclear Plant, Units 1 and 2, authorized by NRC Operating Licenses No. DPR-58 and No. DPR-7 The inspection focused on the circumstances surrounding the event identified by the Resident Inspector involving Unit 2 operation with inoperable flow paths in both Safety Injection Trains. The enclosed copy of our inspection report identifies specific areas examined during the inspection. Within these areas, the inspection consisted of a selective examination of procedures and representative records, observations, and interviews with personne We are releasing this report at this time for your information. You will be notified by separate correspondence of our decision regarding enforcement action based on the findings of this inspection. No written response is required until you are notified of any proposed enforcement actio In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter, and the enclosure, will be placed in the NRC Public Document Roo We will gladly discuss any questions you have concerning this inspectio

Sincerely, 8701290349 870116 PDR ADOCK 05000315 G PDR C. E. Nore11us, Director Division of Reactor Projects Enclosure: Inspection Reports No. 50-315/86042(DRP); and No. 50-316/86042(DRP)

See Attached Distribution RII II RIII L ,

RIbB /ro e <-

Burgesp/nma Gul nd No@reliW j g Jib (0 ) ) l)WY Ill TFo /

--

.

American Electric ' Service 2

'

' I8EI

,

Corporation Distribution cc w/ enclosure:

W. G. Smith, Jr., Plant Manager DCS/RSB(RIDS)

Licensing Fee Management Branch Resident Inspector, RIII Ronald Callen, Michigan Public Service Commission EIS Coordinator, USEPA Region 5 Office Nuclear Facilities and Environmental Monitoring Section