Forwards Partially Withheld Physical Security Insp Repts 50-315/97-19 & 50-316/97-19 on 970929-1003 (Ref 10CFR73.71). Violation Noted Re Armed Response Deployment Strategy Not Successfully Demonstrated During Drills Conducted in 1997
ML20202C956
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 11/24/1997
From: Grobe J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Fitzpatrick E
AMERICAN ELECTRIC POWER CO., INC.
Shared Package
ML20202C962 List:
References
50-315-97-19, 50-316-97-19, NUDOCS 9712040108
Download: ML20202C956 (3)


See also: IR 05000315/1997019

Text

gc0

,

November 24,19')7

Mr. E. E. Fitzpatrick

Executive Vice President

Nuclear Generation Group

American Electric Power Company

500 Circio Drive

Buchanan, MI 49107-1395

SUBJECT:

NRC PHYSIC,AL SECURITY INSPECTION REPORTS 50-315/97019(DRS);

GO-316/97019(DRS)

Dear Mr. Fitzpatrick:

On October 3,1997, the NRC coinpleted a physical security inspection at your D. C. Cook

facility. The enclosed report presents the results of that inspection.

Areas examined within your secunty program are identified in the report. Within those areas,

the inspection consisted of a select!ve examination of procedures and representative records,

observation of performance, and interviews with the staff. The objective of the inspecti'an effort

was to determine whether activities authorized by the license were conducted safely and in

accordance with NRC requirements.

Based on the results of the inspection, it appears that some of your activities were not

conducted in accordance with requirements. Your staff identified that on numerous occasions

in 1996 and 1997 you did not meet the minimum response force capabilities required by the

approved D. C. Cook security plan for the reasons indicated. Additionally, we identified that

your armed response deployment strategy was not successfully demonstrated during drills

conducted in February and June 1997 because armed responders were assigned other duties

which prevented them from adequately respo.) ding. Both of these violations re!ated to contract

l

security personnel reductions made during the past two years and the failure of management to

analyze the impact of these reductions on security plan commitments.

Additionally another finding, not involving a violation, was identified and is prov Juu for your

\\

information and review. This issue involved the perception of the secunty shift captains that

\\

security management was not receptive to their concems based on statements. Our review

showed that your security management staff appropriately addressed this issue with each

security shift during the week of our inspection,

ll! ,! .!!!.El.lil.I I ll

.

.

es

i

S

D'

9712040108 971124

PDR

ADOCK 05000315

0

PDR

a -

J

.

.

E. E. Fitzpatrick

2

November 24, 1997

You are required to respond to this letter and should follow the instructions specified in the

enclosed Notice when preparing your response. The NRC will use your response, in part, to

determine whcther further enforcement action is necessary to ensure compliance with

regulatory requirements.

Areas examined during this inspection concern a subject matter which is exempt from

disclosure according to Part 73, Title 10, Code of Federal Regulations, Section 73.21(c)(2).

This informution must be handled and protected in accordance with the provisions of 10 CFR 73.71. Consequently, our repori of this inspection and your response to this letter will not be

placed in the NRC Public Document Room.

Sincerely,

Original Signed by John A. Grobe

John A. Grobe, Director

Division of Reactor Safety

Docket Nos. 50-315;50-310

License Nos. DPR-58; DPR-74

Enclosures:

1. Notice of Violation

2. Inspection Reports 50-315/97019(DRS); 50-316/97019(DRS)

cc w/encis:

A. A. Blind, Site Vice Presider.t

John Sampson, Plant Manager

NRR/DRIS/RSGB9D

NMSS/HIGDON/4E4

cc w/encis, w/o

SAFEGUARDS INFORMATION:

James R. Padgett, Michigan Public

Service Commission

Michigan Department of Environmental Quality

DOCUMENT NAME: A:\\DCC97019.DRS

5. . . . . n ..

..

.

.. . c . e m ..,%

....< , . . ~ ~ , . . . e . e m . .,, .~.,, >.~ ~,.e..

v . m ,,,,.

OFFICE

Rlli

g

E, Rill

pj

b

Rll!

8

Rill

,,, g

_,,

NAME

JBelang6f:jp

JCreWnff _

BBurgess b

JGrotfe-@

V

DATE

11/p/97

11/ihA7_ gl(/

11//'f/97

11/M97

OFYlCIAL RECORD COPY

$rIIE#**'

s

,

i.

1202 Lad

t.

_

-

_ _ _ - _ . _ _ _ _ _ _ _ _ _ _ _ _ . _ _ . _ _ _ _ _ . _ _ . _ _ _ _ _ . . _ - _ _ . . _ _ _ _ . _

l

.

.

E. E. Fitzpatrick

3

November 24, 1997

l

Qistribution:

Docket File w/o encls

Rlli PRR w/o encls

Rlli Enf. Coordinator w/o encls

PUBLIC IE~-04 w/o encls

SRI, D. C. Cook w/o encls

TSS w/o encls

OCFO/LFARB w/o encls

LPM, NRR w/o encls

DOCCESK w/o encls

DRP w/o encls

A. B. Bt sch, Rill w/o encls

CAA1 w/o encls

DRS w/o encls

J. L. Caldwell, Rlil w/o encls

,

,

.

- - - - - -

-

. -

-,

--+<,e

- - -

- , - . . _ _ ,

-r

- - , - - , - - -