ML20128P578
| ML20128P578 | |
| Person / Time | |
|---|---|
| Site: | Cook |
| Issue date: | 11/29/1990 |
| From: | Beverly Clayton NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Alexich M AMERICAN ELECTRIC POWER SERVICE CORP. |
| Shared Package | |
| ML20128P582 | List: |
| References | |
| NUDOCS 9610180010 | |
| Download: ML20128P578 (2) | |
See also: IR 05000315/1990023
Text
._ _
..
_
._
__ ..
.- _ _ _ _ _ _ __ _ .. _ _ . _ _ _ _ _ . . _
_ . . _
.
_
-
3lG [ 90 cR3
.*
-
(
,
mA.
"
?
.
.
'
S/fD' O
,,
, , , . .
.
Docket No. 50-315
-
No. 50-316-
American Electric Power Service
~
Corporation
Indiana Michigan Power Company
ATTN: Mr. M. P. Alexich
Vice President - Nuclear
Operations Division
1 Riverside Plaza
Columbus, OH 43216
i
Gentlemen:
,
This refers to the routine safety inspection conducted by J. A. Isom and
j
D. G. Passehl of this office on October 10 through November 13, 1990 of
activities at the Donald C. Cook Nuclear Plant, Units 1 and 2, authorized
by NRC Operating Licenses No. DPR-58 and DPR-74 and to the discussion of
our-findings with A. A. Blind, and others of your staff at the conclusion
of the inspection.
'
This refers.also to the two management meetings, one of which was conducted
>
October 24, 1990 in NRC Region III, and included Mr. D. H. Williams, Jr. and
yourself, with Mr. A. B. Davis of NRC Region III, along with other members of
our staff. One other management meeting was held on November 8, 1990, at the
D. D. Cook site, which included yourself, and Mr. J. A. Zwolinski of the NRC
Headquarters offices, along with other members of our staff.
The enclosed copy of-our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative r4 cords, observations, and
interviews with personnel.
,
No violations of NRC requirements were identified during the course of this
inspection.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
'
this letter, and the enclosed inspection report will be placed in the NRC
-
,
Public Document Room.
\\
'
.
-
,
}t
9610100010 901129
ADOCK 05000315
1
G
$
180008
D ddt tJoft
,
b;
__
_
_
..
. _
_ .
_
'
'
.
.
.
e
NC,i..i::'
-
)
American Electric Power Service
2
We will gladly discuss any questions you have concerning this inspection.
1
Sincerely,
.
-...7,-
,,
Brent Clayton, Chief
Reactor Projects Branch 2
Enclosure:
,
1. Inspection Reports
No. 50-315/90023(DRP);
i
i
No. 50-316/90023(DRP)
l
cc w/ enclosures:
A. A. Blind, Plant Manager
,
DCD/DCB (RIDS)
'
Licensing Fee Management Branch
Resident Inspector, RIII
James R. Padgett, Michigan
j
Public Service Commission
,
EIS Coordinator, USEPA
-
Region 5 Office
Michigan Department of
Public Health
T. Colburn, LPM, NRR
' RIII
p
RIII
,
Schweibinz/dp
Jo ensen
Clay /Jo
on
U/W
//Q'l fD
!
a
e
a
9%
.