o MAR 171987 Docket No. 50-315
- Docket No. 316 American Electric Power Service Corporation Indiana and Michigan Electric Company ATTN: Mr. Jchn E. Dolan Vice Chairman Engineering and Construction 1 Riverside Plaza Columbus, OH 43216
Dear Mr. Dolan:
SUBJECT:
REQUALIFICATION PROGRAM EVALUATION In a telephone conversation between Mr. William Nichols, of D. C. Cook and Mr. Darrel Damon, arrangements were made for an evaluation of the requalifi-cation program at the D. C. Cook Nuclear Plant. The evaluation visit is scheduled for the week of June 22, 1987.
3 For this visit, the NRC examiner will administer NRC prepared written, oral, I
and simulator examinations. When the NRC examiner arrives at the site, he will meet with the appropriate facility personnel to review the schedule for those examinations.
For the examiner to adequately prepare for this visit, it will be necessary for the facility to furnish the approved reference material listed in Enclosure 1, " Reference Material Requirements for Requalification Program Evaluations," by April 20, 1987. Mr. Nichols has been advised of our reference material requirements and where they are to be sent.
This request for information was approved by the Office of Management and Budget under Clearance Number 3150-0101, which expires May 31, 1989. Comments on burden and duplication may be directed to the Office of Management and Budget, Reports Managenent Room 3208, New Executive Office Building, Washington, D. C.
20503.
Thank you for your consideration in this matter.
If you have any questions on the evaluation process, please contact Darrel Damon on (312) 790-5278.
Sincerely, Original signed by C. W' Hehl 7
0703200377 870317 PDR ADOCK 05000315 (
PDR T Charles W. Hehl, Chief V
Operations Branch
Enclosure:
As stated See Attache _d_ Distribution RIf R I RI RIII B g ss Hd 1
Damon/lc Burdick 3//7fB7 3
'l 3/ /87 3D
- j ar.
American Electric Power Service 2
MAR 171967 Corporation cc w/ enclosure:
W. G. Smith, Jr., Plant Manager DCS/RSB (RIDS)
Licensing Fee Management Branch Resident Inspector, RIII Ronald Callen, Michigan.
L Public Service Connission EIS Coordinator, USEPA Region 5 Office Nuclear Facilities and Environmental Monitoring Section W. Nichols, Training Supervisor I
cc w/o enclosure:
D. Wigginton, Project Manager, NRR T. L. Szymanski, Branch Chief, OLB l
l l
L
. o ENCLOSURE 1 Reference Material Requirements for Requalification Program Evaluation 1.
All administrative procedures (as applicable to reactor operation or safety) 2.
All integrated plant procedures (normal or general operating procedures) 3.
Emergency procedures (emergency instructions, abnorwal, or special procedures) 4.
Standing orders (important orders which are safety-related to and may supersede the regular procedures) 5.
Fuel-handling and core-loading procedures (initial core-loading procedure,whenappropriate) 6.
Annunciatorprocedures(alarmprocedures,includingsetpoints) 7.
Radiation protection manual (radiation control manual or procedures) 8.
Technical Specifications
- 10. Lesson plans (training manuals, plant orientation manual, systems descriptions)
- 11. Systems operating procedures
- 12. Piping and instrumentation diagrams, electrical single-line diagrams, or flow diagrams
- 13. Copies of facility R0 and SRO requalification examinations administered during the past 2 years
- 14. An index of administrative, operating, abnormal and emergency procedures
- 15. Planttechnicaldata(curve) book All of the above referenced material should be approved, final issues and should be so marked. Uncontrolled, preliminary, or other such issues will not be acceptable. All procedures and reference material should be bound or in the form used by the control room operators, with appropriate indexes or tables of contents to ensure efficient use.
4 i
+
.