ML17325B628
| ML17325B628 | |
| Person / Time | |
|---|---|
| Site: | Cook |
| Issue date: | 06/01/1999 |
| From: | Bakken A INDIANA MICHIGAN POWER CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML17325B629 | List: |
| References | |
| NUDOCS 9906070042 | |
| Download: ML17325B628 (2) | |
Text
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:9906070042 DOC.DATE: 99/06/01 NOTARIZED: NO FACIL:50-315 Donald C.
Cook Nuclear Power Plant, Unit 1, Indiana M
AUTH;NAME AUTHOR AFFILIATION BAKKEN,A.C.
RECIP.NAME RECIPIENT AFFILIATION Records Management Branch (Document Control Desk)
DOCKET 05000315
SUBJECT:
Forwards LER 99-S003-00,xe nonconforming vital area barriers. Commitments made by util are listed.
DISTRIBUTION CODE: IE74T COPIES RECEIVED:LTR L ENCLI SIZE:
TITLE: Safeguards Phys Sec Event Pt. 73.71 (Public Available)
NOTES:
+a RECIPIENT ID CODE/NAME STANG, J COPIES LTTR ENCL 1
0 RECIPIENT ID CODE/NAME COPIES LTTR ENCL INTERNAL: AEOD/SPD/RRAB NMSS/FCSS/FCOB RGN3 01 1
1 ILE CENTE 1
1 OCS FULLTEXT 1
1 1
1 1
1 EXTERNAL: NRC PDR 1
1 NOTE TO ALL "RIDS" RECIPZENTS:
PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LIS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTR DESK (DCD)
ON EXTENSION 415-2083 FULL TEXT CONVERSION REQUIRED TOTAL ~
MBER OF C~""IES RF IRED: LTTR 7
ENCL 6
Indiana Michiga Power Company Carr rrudear Rara One Cooir Rara Bijgman, >AI49i06 6i6 466 690i IIIIDIAIIIA NICHIGAN POWER June 1, 1999 United States Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Operating License DPR-58 Docket No. 50-315 Document Control Manager:
In accordance with the criteria established by 10CFR73, Appendix G, paragraph l(c) and 10CFR73.71(d), the following report is being submitted:
LER 315/99-S003-00, "Nonconforming Vital Area Barriers."
The following commitments were Iddntified in this submittal:
~
The openings for the cable tray wall penetrations between the Unit 1 and Unit 2 4 KV Rooms and the Unit 1 and 2 Reactor Cable Tunnels will be modified to ensure compliance with NUREG 0908.
Compensatory measures will remain in place until the VA barriers are restored to conforming conditions.
~
The ongoing Security Restart Readiness Self-Assessment team inspections will address the identification and correction of existing VA area barrier vulnerabilities due to design, materiel deficiencies or other causes prior to restart from the current outages of both units.
\\
II
~
Security will prepare and implement a procedure for future refueling outages to inspect VA barriers to identify and correct degraded and nonconforming conditions.
Sincerely, A. Christopher Bakke, Site Vice President
/mbd Attachment c:
J.
E.
Dyer, Region III R. P.
Powers P. A.
Barrett D. F.
Kunsemiller R.
Whale D.
Hahn Records Center, INPO NRC Resident Inspector 9906070042 99060i PDR ADQCK 05000315 S