IR 05000315/1986030
| ML20214F912 | |
| Person / Time | |
|---|---|
| Site: | Cook |
| Issue date: | 11/18/1986 |
| From: | Guldemond W NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Dolan J AMERICAN ELECTRIC POWER SERVICE CORP., INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG |
| References | |
| NUDOCS 8611250479 | |
| Download: ML20214F912 (1) | |
Text
--
ll1 b NOV 181986 Docket No. 50-315 Docket No. 50-316 American Electric Power Service Corporation Indiana and Michigan Electric Company ATTN: Mr. John E. Dolan Vice Chairman Engineering and Construction 1 Riverside Plaza Columbus, OH 43216 Gentlemen:
Thank you for your letter dated November 7,1986 (AEP:NRC:1013), informing us of the steps you have taken to correct the violation which we brought to your attention in Inspection Report No. 50-315/86030(DRP); 50-316/86030(DRP) forwarded by our letter dated October 8,1986. We will examine these matters during a subsequent inspection.
Your description of corrective action taken and results achieved is not complete, but adequate details are provided in a separate referenced Licensee Event Report.
In the future, please consolidate all of the response elements to satisfy 10 CFR 2.201 into one document containing your complete written statement or explanation in reply.
Your cooperation with us is appreciated.
Sincerely, l
ORIGINAL SIGNED BY W. O. GULDEMOND W. G. Guldemond, Chief Projects Branch 2 cc:
W. G. Smith, Jr., Plant Manager
!
DCS/RSB (RIDS)
Licensing Fee Management Branch Resident Inspector, RIII Ronald Callen, Michigan Public Service Commission EIS Coordinator, USEPA Region 5 Office Nuclear Facilities and Environmental Monitoring Section 8611250479 861118 RIII RIII PDR ADOCK 05000315 pp
-
G PDR Burgess /qg Gul emond
Dg 11g/86 i
i o t
_ -_.l G c /
.
_ ----- -