ML17325B633
| ML17325B633 | |
| Person / Time | |
|---|---|
| Site: | Cook |
| Issue date: | 05/28/1999 |
| From: | Bakken A INDIANA MICHIGAN POWER CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML17325B634 | List: |
| References | |
| NUDOCS 9906070100 | |
| Download: ML17325B633 (2) | |
Text
~
<A,LNLiuRX REGULATORY INFO@4ATION DISTRIBUTION SYSTEM (RIDS)
H
,ACCESSION NBR-9906070100 DOC.DATE-99/05/28 NOTARIZED: NO DOCKET FACIL:50-315 Donald C.
Cook Nuclear Power Plant, Unit 1, Indiana M
05000315 AUTH.NAME AUTHOR AFFILIATION BAKKEN,A.C.
RECIP.NAME RECIPIENT AFFILIATION Records Management Branch (Document Control Desk)
SUBJECT:
Forwards LER 99-S002-00,re vulnerability in safeguard sys that could allow unauthorized or undected access to protected area. Commitments made by util are listed.
DISTRIBUTION CODE: IE74T COPIES RECEIVED:LTR ENCL SIZE:
TITLE: Safeguards Phys Sec Event Pt. 73.71 (Public Available)
NOTES:
RECIPIENT ID CODE/NAME STANG, J COPIES LTTR ENCL 1
0 RECIPIENT ID CODE/NAME COPIES LTTR ENCL INTERNAL: AEOD/SPD/RRAB NMSS/FCSS/FCOB RGN3 01 1
1 1
1 1
1 LE CENTER NUDOCS FULLTEXT 1
1 1
1 EXTERNAL: NRC PDR 1
1 NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LIS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATIONS CONTACT THE DOCUMENT CONTR DESK (DCD)
ON EXTENSION 415-2083 FULL TEXT CONVERSION REQUIRED TOTAL ~BER OF C
"'~S REQ'P ~ED:
LTTR 7
ENCL 6
Indiana Michigan+
Power Company Gook lajdoar Rara One Cook Rani endrrnan. M149106 616 465 5601 INDMNA NlCHIGAN PQWM May 28, 1999 United States Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Operating License DPR-58 Docket No. 50-315 Document Control Manager:
In accordance with the criteria established by 10CFR73, Appendix G, paragraph l(c) and 10CFR73.71(d), the following report is being submitted:
LER 315/99-S002-00, "Vulnerability in a
Safeguard System That Could Allow Unauthorized or Undetected Access to the Protected Area".
The following commitments were identified in this submittal:
~
Compensatory measures willremain in place until the wall opening is conforming.
~
Modifications are being made to the wall opening to eliminate identified nonconforming conditions.
~
All security vital barriers are being walked down by an assessment team as part of the Restart Readiness Assessment Program.
Sincerely, A. Christopher Bakken, I
Site Vice President
/mbd Attachment J.
E.
Dyer, Region III R. P.
'Powers P. A.
Barrett D. F.
Kunsemiller R.
Whale D.
Hahn Records Center, INPO NRC Resident Inspector 9906070i00 9'II0528 PDR ADDCK 050003i5 S
/~0