Forwards LER 99-014-00 Re Requirement of TS 4.0.5 Not Met for Boron Injection Tank Bolting.Commitments Identified in Submittal Listed
ML17326A012
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 06/18/1999
From: Bakken A
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML17326A013 List:
References
NUDOCS 9906220197
Download: ML17326A012 (2)


Text

'EGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9906220197 DOC DATE: 99/06/18 NOTARIZED: NO DOCKET FACZL:50-315 Donald C. Cook Nuclear Power Plant, Unit 1, Indiana M 05000315 AUTH.NAME AUTHOR AFFXLIATION BAKKENJA.CD Xndiana Michigan Power Co. (formerly Xndiana & Michigan Ele RECXP.NAME .RECIPXENT AFFILIATION Records Management Branch (Document Control Desk)

SUBJECT:

Forwards LER 99-014-00 re requirement of TS 4.0.5 not met for Boron injection tank bolting. Commitments identified in submittal listed.

DXSTRIBDTXON CODE: XE22T COPIES RECEIVED:LTR l ENCL l SIZE:

TITLE: 50.73/50.9 Licensee Event Report (LER), Incident Rpt, etc.

NOTES:

REC1PXENT COPIES RECIPIENT COPIES XD CODE/NAME LTTR ENCL ID CODE/NAME/ LTTR ENCL LPD3-1 PD 1 1 STANG, J 1 1 INTERNAL: AEOD/SPD/RRAB 1 1 FILE CENTER 1 1 NRR/DZPM/IOLB I I RT/DTSM/TQMB 1 1 NRR/DRXP/REXB 1 1 NRR/DSSA/SPLB 1 1 RES/DET/EXB 1 1 RGN3 FILE 01 1 1 EXTERNAL: L ST LOBBY WARD 1 1 LMITCO MARSHALL 1 1 NOAC POORE,W. 1 1 NOAC QUEENER,DS 1 1 NRC PDR 1 ,1 NUDOCS FULL TXT 1, 1 D

0 NOTE TO ALL MRIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT LISTS T

THE E DOCUMENT DOCUM CONTROL DESK (DCD) ON EXTENSION 415-2083 I FULL TEXT CONVERSION REQUIRED TOTAL NUMBER OF COPIES REQUIRED: LTTR 16 ENCL 16

Indiana Michiga Power Company

~ Cock Nudearplarc o>>e ox'ar4 Mgmn, Mr49106 Z

616 465 5901 INDIANA NICHIOiAN POH%R June 18, 1999 United States Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Operating License DPR-58 Docket No. 50-315 Document Control Manager:

In accordance with the criteria established by 10CFR50.73(a)(2)(i)(B) the following report is being submitted:

LER 315/99-014-00, 'Requirements of Technical Specification 4.0.5 Not Met for Boron Injection Tank Bolting".

The following commitments were identified in this submittal:

~ The Boron Injection Tanks (BIT) bolting has been administratively placed in the ISI database for the third ISI interval. Examination of.the bolts has beeri scheduled and will be performed prior to Mode 4.

~ Engineering has developed an action plan to review the ISI Program for compliance with all regulatory requirements prior to restart.

~ A lesson learned will be placed in the program notebook to alert personnel of the previously missed examinations.

~ PMI-5070, Inservice Inspection, will be revised to require that ISI Program changes will be reviewed in accordance with the requirements of 10 CFR 50.59.

Sincerely, A. Christopher Bakken, II Site Vice President

/mbd Attachment J. E. Dyer, Region III R. P. Powers P. A. Barrett D. F. Kunsemiller R. Whale D. Hahn Records Center, INPO NRC Resident Inspector 9906220i'ir7 'ir906i8 PDR ADQCK 050003i5 S PDR