Similar Documents at Cook |
---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML17335A5691999-10-21021 October 1999 Forwards Insp Repts 50-315/99-25 & 50-316/99-25 on 990816- 20.Two Violations of NRC Requirements Identified & Being Treated as non-cited Violations Consistent with App C of Enforcement Policy ML17335A5681999-10-19019 October 1999 Confirms Plans to Conduct Meeting with American Electric Power & DC Cook Plant Mgt to Discuss Status of Case Specific Checklist Items,Rev to Restart Plan,Operations Dept Readiness for Restart & Performance Assurance Audit Status ML20217J4721999-10-15015 October 1999 Forwards NRC Physical Security Insp Repts 50-315/99-27 & 50-316/99-27 on 990920-24.Two Violations Noted & Being Treated as Ncvs,Consistent with App C of Enforcement Policy. Areas Examined Exempt from Disclosure,Per 10CFR73.21 IA-99-379, First Final Response to FOIA Request for Documents.Documents Listed in App a Being Released in Entirety1999-10-0808 October 1999 First Final Response to FOIA Request for Documents.Documents Listed in App a Being Released in Entirety ML20217D9241999-10-0808 October 1999 First Final Response to FOIA Request for Documents.Documents Listed in App a Being Released in Entirety ML17335A5541999-10-0101 October 1999 Submits Summary of 990712 Technical Meeting Re Containment Sump Issues Concerning Restart of Plant,Units 1 & 2.List of Attendees & Matl Used in Presentation Encl ML20217D9361999-09-30030 September 1999 FOIA Request for Document Re Section 9.7 of SE by Directorate of Licensing,Us Ae Commission in Matter of Indiana & Michigan Electric Co & Indiana & Michigan Power Co,Dc Cook Nuclear Plan,Units 1 & 2 ML17335A5491999-09-29029 September 1999 Advises of NRC Plans for Future Insp Activities at Facility for Licensee to Have Opportunity to Prepare for Insps & to Provide NRC with Feedback on Any Planned Insps Which May Conflict with Plant Activities.Plant Issue Matrix Encl ML17335A5391999-09-27027 September 1999 Forwards Copy of Preliminary Accident Sequence Precursor Analysis of Operational Condition Which Was Discovered at Plant,Units 1 & 2 on 980715,for Review & Comment.Comment Requested within 30 Days of Receipt of Ltr ML17326A1601999-09-27027 September 1999 Forwards Insp Repts 50-315/99-16 & 50-316/99-16 on 990719-23 & 0802-06.Violations Re Failure to Maintain Exam Matl Security & Maintain Licensed Operator Biennial Medical Exams Identified & Being Treated as Noncited Violations NUREG-1706, Discusses Licensee & Suppl Which Responded to GL 98-01, Y2K Readiness of Computer Sys at Npps. Concluded That No Nuclear Plants with Y2K Issues Involving Safety Sys Identified1999-09-23023 September 1999 Discusses Licensee & Suppl Which Responded to GL 98-01, Y2K Readiness of Computer Sys at Npps. Concluded That No Nuclear Plants with Y2K Issues Involving Safety Sys Identified ML17326A1701999-09-23023 September 1999 Informs That Proposed Rev to Applicable Specifications to Containment Sys TS Bases 3/4.6.1.4 & 3/4.6.1.5,submitted in ,Withdrawn Per 990920 Telcon ML17326A1651999-09-22022 September 1999 Forwards Insp Repts 50-315/99-17 & 50-316/99-17 on 990717- 0825.One Violation Identified & of Concern Because Inspectors Identified Failure to Restore Compliance for Previously Identified Violation of NRC Requirements ML17326A1541999-09-20020 September 1999 Provides Notification of Change in Senior Licensed Operator Status.Operating Licenses for CR Smith,License SOP-30159-4 & Tw Welch,License SOP-30654-2 Are No Longer Required & Should Be Withdrawn ML17326A1441999-09-17017 September 1999 Submits Trace on Second Shipment of Two Plant,Unit 2 Steam Generators.Info Re Shipment Submitted ML17326A1551999-09-17017 September 1999 Transmits Updated Case Specific Checklist for DC Cook Nuclear Power Plant Which Identifies Specific Issues Requiring Resolution Prior to Restart of Cook Plant ML17326A1361999-09-16016 September 1999 Forwards Insp Repts 50-315/99-07 & 50-316/99-07 on 990712-30 & 0816.Seven Violations of NRC Requirements Occurred & Being Treated as Ncvs,Consistent with App C of Enforcement Policy ML17326A1531999-09-16016 September 1999 Submits Info Pertaining to Plant Proposed Operator Licensing Exam Requirements Through Yr 2003.NRC Form 536, Operator Licensing Exam Data, Which Provides Required Info Encl ML17326A1391999-09-15015 September 1999 Forwards Insp Repts 50-315/99-18 & 50-316/99-18 on 990726-30 & 0816 ML17326A1151999-09-0808 September 1999 Responds to W Nelson 990614 & 0726 Ltrs Re Schedule for Initial Licensing Exam for Operator License Application. Exam Scheduled for Wks of 010305 & 12 & 0423 & 30 ML17326A1031999-08-25025 August 1999 Forwards Notice of Consideration of Issuance of Amend to FOL Re Request for License Amend Dtd 980914.Amends Would Change Runout Limits for SI Pump to 675 Gallons Per Minute Not Exceeding 700 Gallons Per Minute for Both Units 1 & 2 ML17326A1021999-08-25025 August 1999 Informs That on 990819,NRC Held Public Meeting at Region III Ofc in Lisle,Il to Discuss Status of Facility Restart & NRC Manual Chapter 0350 Oversight Insp ML17326A0971999-08-25025 August 1999 Provides Summary of 990615 Public Meeting at DC Cook NPP in Berrien County,Michigan Re Technical Issues Concerning Restart of DC Cook Npp,Units 1 & 2.List of Meeting Attendees & Copy of Slides Used by Licensee Encl ML17326A1221999-08-23023 August 1999 Forwards Revised Page 2 to 1998 Annual Environ Operating Rept, for DC Cook Nuclear Plant,Correcting Omission to App I ML17326A0981999-08-23023 August 1999 Forwards fitness-for-duty Program Performance Data for Period of 990101-0630 for DC Cook Nuclear Plants,Units 1 & 2,per 10CFR26.71(d) ML17326A0831999-08-13013 August 1999 Forwards Insp Repts 50-315/99-15 & 50-316/99-15 on 990528-0716.No Violations Noted.Insp Consisted of Selective Examinations of Procedures & Representative Records, Interviews with Personnel & Observations of Activities ML17326A0881999-08-12012 August 1999 Forwards Draft Preliminary Results of Analysis of Risk Significance of Issues That Were Identified at DC Cook NPP, Units 1 & 2,between Aug 1997 & Jan 1999 ML17326A0811999-08-10010 August 1999 Notifies NRC of Changes in Commitments Made in Response to GL 98-01,supplement 1, Yr 2000 Readiness of Computer Sys Ar Npps, ML17326A0781999-08-0909 August 1999 Forwards SE Accepting 980403 Request for Approval Under Provisions of 10CFR50.55a(a)(3),to Use ASME B&PV Code, Section Ix,Code Cases 2142-1 & 2143-1 for Fabrication & Installation of Unit 1 Replacement SG Lower Assemblies ML17326A0821999-08-0606 August 1999 Informs That Util Is Submitting Encl Scope & Objectives for 991026 DC Cook Nuclear Plant Emergency Plan Exercise to G Shear of NRC Plant Support Branch.Exercise Will Include Full State & County Participation ML17326A1451999-08-0404 August 1999 Requests Withholding of WCAP-15246, Control Rod Insertion Following Cold Leg Lbloca 05000315/LER-1998-029-01, Forwards LER 98-029-01, Fuel Handling Area Ventilation Sys Inoperable Due to Original Design Deficiency. Supplemental Rept Represents Extensive Rev to Original LER & Replaces Rept in Entirely.Commitment Listed1999-08-0404 August 1999 Forwards LER 98-029-01, Fuel Handling Area Ventilation Sys Inoperable Due to Original Design Deficiency. Supplemental Rept Represents Extensive Rev to Original LER & Replaces Rept in Entirely.Commitment Listed ML17326A0711999-07-27027 July 1999 Responds to 980123 RAI Re NRC GL 87-02, Verification of Seismic Adequacy of Mechanical & Electrical Equipment in Operating Reactors,Unresolved Safety Issue (USI) A-46 ML17326A0701999-07-27027 July 1999 Summarizes 990715 Meeting Conducted in Bridgman,Mi Re Ongoing Transition from Discovery Phase of Restart Plan to Implementation Phase.List of Meeting Attendees Encl ML17326A0671999-07-26026 July 1999 Forwards Summary of 990616 Meeting at DC Cook Nuclear Plant in Berrien County,Mi Re Core Offload for Both Units.List of Attendees & Copy of Briefing Sheets Used by Licensee Also Encl ML17191B4031999-07-23023 July 1999 Informs That NRC Plans to Administer GFE Section of Written Operator Licensing Exam on 991006.Ltr Should Be Submitted to Appropriate Regional Administrator at Listed Address to Register Personnel to Take GFE 05000315/LER-1998-014-03, Forwards LER 98-014-03, Response to High-High Containment Pressure Procedure Not Consistent with Analysis of Record. Revised Info Marked by Sidebars in Right Hand Margin. Commitments Made by Util,Listed1999-07-22022 July 1999 Forwards LER 98-014-03, Response to High-High Containment Pressure Procedure Not Consistent with Analysis of Record. Revised Info Marked by Sidebars in Right Hand Margin. Commitments Made by Util,Listed ML17326A0601999-07-22022 July 1999 Forwards UFSAR, IAW 10CFR50.71(e) & Rept of Changes,Tests & Experiments as Required by 10CFR50.59(b)(2) for DC Cook Nuclear Plant,Units 1 & 2.Without UFSAR ML17326A0571999-07-16016 July 1999 Submits Summary of 990615 Public Meeting with Util in Berrien County,Mi Re Restart of Units at DC Cook,In Accordance with NRC Insp Manual Chapter 0350.List of Attendees & Slide Presentation Encl ML17326A0541999-07-15015 July 1999 Forwards Summary of 990324 Meeting with External 0350 Restart Panel to Discuss Status of Plant Restart Activities. List of Attendees & Slides Used by Licensee Encl ML17326A0551999-07-15015 July 1999 Fowards Summary of 990324 Technical Meeting Re Technical Issues Related to Restart of Plant,Units 1 & 2.List of Attendees & Slides Used by Licensee Encl ML17326A0561999-07-14014 July 1999 Forwards Summary of 990415 Meeting Re Status of Cook Nuclear Plant Restart Activities.List of Attendees & Matl Used in Presentation Enclosed ML17326A0441999-07-14014 July 1999 Ack Receipt of Withdrawing Request for Relief. Staff Actions for TAC M98339 Completed ML17326A0451999-07-12012 July 1999 Forwards Insp Repts 50-315/99-13 & 50-316/99-13 on 990517-0611.One Violation Noted & Being Treated as non-cited Violation,Consistent with App C of Enforcement Policy. Violation Re Failure to Perform Required Maint on Equipment ML17326A0371999-07-0606 July 1999 Discusses Meeting Conducted at Region III Senior Reactor Analysts at Plant Re Initiatives in Risk Area & to Establish Dialog Between SRAs & Licensee 05000315/LER-1999-004-01, Forwards LER 99-004-01 Re Failure to Perform TS Surveillance Analyses of Reactor Coolant Chemistry with Fuel Removed. Commitments Made by Util Are Listed1999-07-0101 July 1999 Forwards LER 99-004-01 Re Failure to Perform TS Surveillance Analyses of Reactor Coolant Chemistry with Fuel Removed. Commitments Made by Util Are Listed ML20196K5961999-06-30030 June 1999 Ltr Contract:Task Order 40, DC Cook Extended Sys Regulatory Review Oversight Insp, Under Contract NRC-03-98-021 ML17326A0271999-06-30030 June 1999 Confirms Plans to Conduct Meeting with Util & DC Cook Plant Management to Discuss Technical Issues at Plant on 990715 in Training Center at Plant ML17326A0281999-06-28028 June 1999 Provides Response to 981116 & 960228 RAIs Re GL 92-01. Revised Pressurized Thermal Shock Evaluation Based on New Weld Chemistry Info & Copy of W Rept WCAP-15074, Evaluation of 1P3571 Weld Metal from Surveillance Programs... Encl ML17326A0241999-06-23023 June 1999 Responds to GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Nuclear Power Plants. Y2K Readiness Disclosure for Plant & List of Commitments Encl 1999-09-08
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML20217D9361999-09-30030 September 1999 FOIA Request for Document Re Section 9.7 of SE by Directorate of Licensing,Us Ae Commission in Matter of Indiana & Michigan Electric Co & Indiana & Michigan Power Co,Dc Cook Nuclear Plan,Units 1 & 2 ML17326A1541999-09-20020 September 1999 Provides Notification of Change in Senior Licensed Operator Status.Operating Licenses for CR Smith,License SOP-30159-4 & Tw Welch,License SOP-30654-2 Are No Longer Required & Should Be Withdrawn ML17326A1441999-09-17017 September 1999 Submits Trace on Second Shipment of Two Plant,Unit 2 Steam Generators.Info Re Shipment Submitted ML17326A1531999-09-16016 September 1999 Submits Info Pertaining to Plant Proposed Operator Licensing Exam Requirements Through Yr 2003.NRC Form 536, Operator Licensing Exam Data, Which Provides Required Info Encl ML17326A1221999-08-23023 August 1999 Forwards Revised Page 2 to 1998 Annual Environ Operating Rept, for DC Cook Nuclear Plant,Correcting Omission to App I ML17326A0981999-08-23023 August 1999 Forwards fitness-for-duty Program Performance Data for Period of 990101-0630 for DC Cook Nuclear Plants,Units 1 & 2,per 10CFR26.71(d) ML17326A0811999-08-10010 August 1999 Notifies NRC of Changes in Commitments Made in Response to GL 98-01,supplement 1, Yr 2000 Readiness of Computer Sys Ar Npps, ML17326A0821999-08-0606 August 1999 Informs That Util Is Submitting Encl Scope & Objectives for 991026 DC Cook Nuclear Plant Emergency Plan Exercise to G Shear of NRC Plant Support Branch.Exercise Will Include Full State & County Participation ML17326A1451999-08-0404 August 1999 Requests Withholding of WCAP-15246, Control Rod Insertion Following Cold Leg Lbloca 05000315/LER-1998-029-01, Forwards LER 98-029-01, Fuel Handling Area Ventilation Sys Inoperable Due to Original Design Deficiency. Supplemental Rept Represents Extensive Rev to Original LER & Replaces Rept in Entirely.Commitment Listed1999-08-0404 August 1999 Forwards LER 98-029-01, Fuel Handling Area Ventilation Sys Inoperable Due to Original Design Deficiency. Supplemental Rept Represents Extensive Rev to Original LER & Replaces Rept in Entirely.Commitment Listed ML17326A0711999-07-27027 July 1999 Responds to 980123 RAI Re NRC GL 87-02, Verification of Seismic Adequacy of Mechanical & Electrical Equipment in Operating Reactors,Unresolved Safety Issue (USI) A-46 ML17326A0601999-07-22022 July 1999 Forwards UFSAR, IAW 10CFR50.71(e) & Rept of Changes,Tests & Experiments as Required by 10CFR50.59(b)(2) for DC Cook Nuclear Plant,Units 1 & 2.Without UFSAR 05000315/LER-1998-014-03, Forwards LER 98-014-03, Response to High-High Containment Pressure Procedure Not Consistent with Analysis of Record. Revised Info Marked by Sidebars in Right Hand Margin. Commitments Made by Util,Listed1999-07-22022 July 1999 Forwards LER 98-014-03, Response to High-High Containment Pressure Procedure Not Consistent with Analysis of Record. Revised Info Marked by Sidebars in Right Hand Margin. Commitments Made by Util,Listed 05000315/LER-1999-004-01, Forwards LER 99-004-01 Re Failure to Perform TS Surveillance Analyses of Reactor Coolant Chemistry with Fuel Removed. Commitments Made by Util Are Listed1999-07-0101 July 1999 Forwards LER 99-004-01 Re Failure to Perform TS Surveillance Analyses of Reactor Coolant Chemistry with Fuel Removed. Commitments Made by Util Are Listed ML17326A0281999-06-28028 June 1999 Provides Response to 981116 & 960228 RAIs Re GL 92-01. Revised Pressurized Thermal Shock Evaluation Based on New Weld Chemistry Info & Copy of W Rept WCAP-15074, Evaluation of 1P3571 Weld Metal from Surveillance Programs... Encl ML17326A0241999-06-23023 June 1999 Responds to GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Nuclear Power Plants. Y2K Readiness Disclosure for Plant & List of Commitments Encl ML17326A0111999-06-11011 June 1999 Provides Response to NRC RAI Re GL 97-01, Degradation of Crdm/Cedm Nozzle & Other Vessel Closure Head Penetrations ML17325B6281999-06-0101 June 1999 Forwards LER 99-S03-00,re Nonconforming Vital Area Barriers.Commitments Made by Util Are Listed ML17325B6331999-05-28028 May 1999 Forwards LER 99-S02-00,re Vulnerability in Safeguard Sys That Could Allow Unauthorized or Undetected Access to Protected Area.Commitments Made by Util Are Listed 05000315/LER-1998-037-01, Forwards LER 98-037-01,representing Extensive Rev to Original LER & Replacing Rept in Entirety.Listed Commitments Identified in Submittal1999-05-24024 May 1999 Forwards LER 98-037-01,representing Extensive Rev to Original LER & Replacing Rept in Entirety.Listed Commitments Identified in Submittal ML17325B6111999-05-21021 May 1999 Forwards Annual Radioactive Effluent Release Rept for 980101-1231 for DC Cook Nuclear Plant,Units 1 & 2. Transmittal of Submittal Was Delayed Due to Administrative Error in Regulatory Affairs Dept ML17325B6031999-05-21021 May 1999 Provides Response to NRC GL 98-04, Potential for Degradation of ECCS & Containment Spray Sys After LOCA Because of Const & Protective Coating Deficiencies & Foreign Matl in Containment ML17335A5281999-05-12012 May 1999 Forwards DC Cook Nuclear Plant Fitness for Duty Program Performance Dtd for six-month Period of 980701-1231,IAW 10CFR26.71(d).Info Was Delayed Due to Administrative Error in Regulatory Affairs Dept ML17335A5271999-05-11011 May 1999 Forwards Details Re Sources & Levels of Insurance Maintained for DC Cook,Units 1 & 2,as of 990401,per 10CFR50.54(w)(3). Info Was Delayed Beyond Required Date Due to Internal Oversight 05000316/LER-1999-002, Forwards LER 99-002-00 Re TS 4.0.5 Requirements Not Being Met Due to Improperly Performed Test.Commitments Identified in Ler,Listed1999-05-10010 May 1999 Forwards LER 99-002-00 Re TS 4.0.5 Requirements Not Being Met Due to Improperly Performed Test.Commitments Identified in Ler,Listed ML17325B5871999-05-0707 May 1999 Forwards Current Revs of Expanded Sys Readiness Review (Essr) Implementing Procedures,For Info Purposes to Support Current NRC Insps.Current ESRR Schedule Provided for Info Purposes,Reflecting Revised Target Dates ML17325B5821999-05-0404 May 1999 Provides Addl Background,Description & Clarification of Previous & Revised Commitments Re UFSAR Revalidation Effort. Commitment Change Involved Alignment of UFSAR Revalidation Program Methodology to Strategy Contained in Current Plan ML17325B5631999-04-22022 April 1999 Forwards Results of Independent Chemical Evaluations Performed from Sept 1997 Through Feb 1999,re Resolution of Issues Related to License Amend 227 ML17325B5301999-04-0707 April 1999 Forwards LER 99-S01-01, Vulnerability in Locking Mechanism of Four Vital Area Gates, Per 10CFR50.73.Commitments Made by Util,Listed ML17325B5241999-04-0505 April 1999 Forwards Revs 0 & 1 to Cook Nuclear Plant Restart Plan, & 0407.Rev 5 Is Current Cook Nuclear Plant Restart & Supercedes Previous Revs in All Respects ML17325B5141999-03-30030 March 1999 Forwards Rept on Status of Decommissioning Funding.Attached Rept Includes Amount of Decommissioning Funds Estimated to Be Required Pursuant to 10CFR50.75(b) & (C) ML20204F6401999-03-19019 March 1999 Responds to NRC 981013 NOV & Proposed Imposition of Civil Penalty.Violations Cited in Subject NOV Were Initially Identified in Referenced Five Insp Repts.Corrective Actions: Ice Condensers Have Been Completely Thawed of Any Blockage ML17325B4641999-03-17017 March 1999 Withdraws Response to Issue 1 of NRC Cal,Dtd 970919. Comprehensive Design Review Effort in Progress to Validate Resolution of Issue for Future Operation ML17325B4651999-03-12012 March 1999 Forwards Rev 5 to Cook Nuclear Plant Restart Plan, Which Supercedes Previous Revs in All Aspects.Licensee Will Continue to Advise NRC of Progress Toward Restart & Provide Addl Info During Monthly 0350 Restart Panel Public Meetings ML17325B4601999-03-11011 March 1999 Forwards Copy of Util 981102 Cover Ltr Sent to Mi Dept of Environ Quality Which Transmitted Storm Water Pollution Prevention Plan Rev Sheet. Util Failed to Send Copy to NRC within 30-day Period,Per Ets,Due to Internal Oversignt ML17325B4541999-02-28028 February 1999 Informs NRC Staff That Jr Sampson Will Assume Position of State President,Aep Impco,Effective 990301.Block Diagram of Interim Organizational Chart Attached ML17325B4521999-02-20020 February 1999 Discusses Delay in Implementation of License Amend 227 Until Issues Fully Evaluated ML17325B4531999-02-19019 February 1999 Forwards for Files,Copy of DC Cook Nuclear Plant Ltr AEP:NRC:90358B,dtd 981218 ML17325B4491999-02-18018 February 1999 Forwards Rev 1 to Licensee Ltr Sent to DOT Re Exemption Request to Support Disposal of DC Cook,Unit 2 Generators Removed in 1988.Rev 1 to ER-98-009, Premliminary Waste Characterization of DC Cook SG Lower Assemblies, Encl ML17335A5001999-01-30030 January 1999 Submits Response to GL 96-01, Testing of Safety Related Logic Circuits. Surveillance Revalidation Program Has Been Initiated by Operations Dept to Compare Associated Procedures with TS ML17335A4931999-01-22022 January 1999 Requests Extension of Response to NRC NOVs 50-315/97-201, 50-316/97-201,50-315/97-17,50-316/97-17,50-315/98-04, 50-316/98-04,50-315/98-05,50-316/98-05,50-315/98-09 & 50-316/98-09,until 990305 ML17335A4851999-01-18018 January 1999 Submits Overview of Updated Plant Restart Plan & Schedule 05000315/LER-1998-052-01, Forwards LER 98-052-01,re Potential Failure Mode for Air Operated Components Not Considered in Original Design. Interim LER Has Been Updated to Include Two Addl Instances of Same Failure Mode1999-01-18018 January 1999 Forwards LER 98-052-01,re Potential Failure Mode for Air Operated Components Not Considered in Original Design. Interim LER Has Been Updated to Include Two Addl Instances of Same Failure Mode ML17335A4941998-12-18018 December 1998 Informs NRC of Desire to Defer Number of Insps NRC Currently Has Scheduled for Dec 1998 & Jan 1999.Requests That Insps for Listed Items Be Postponed ML17335A4191998-12-18018 December 1998 Informs That Based on Stated Items,Nrc Review & Approval of License Amend Request Is No Longer Considered Necessary Prior to Restart of Unit 1 ML17335A4051998-12-16016 December 1998 Forwards Rev 4 to Cook Nuclear Plant Restart Plan, IAW Previous Commitments to Provide Copies of Restart Plan for Info ML17335A4091998-12-16016 December 1998 Withdraws All Previous Requests for Relief from Code Requirments for Containment Spray Pumps.Util Installing Mod to CSS That Will Enable Util to Perform Pump Tests IAW Code Requirements Prior to Restart ML17335A4101998-12-15015 December 1998 Informs That Licensee Would Be Pleased to Be Included as Reference Plant in GSI - 191 Evaluations,In Response to JW Craig Request 05000315/LER-1998-031-01, Forwards LER 98-031-01,re Potential Common Mode Failure of RHR Pumps Due to Use of Inaccurate Values.Commitment Made by Util,Listed1998-12-11011 December 1998 Forwards LER 98-031-01,re Potential Common Mode Failure of RHR Pumps Due to Use of Inaccurate Values.Commitment Made by Util,Listed ML17335A3891998-12-10010 December 1998 Informs That Util Is Extending Severe Accident Mgt Guidelines Until 991231 Due to re-assigned Engineering Resources 1999-09-30
[Table view] |
Text
I CATEGORY 1
~ '
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:9908310065 DOC.DATE: 99/08/23 NOTARIZED: NO DOCKET ¹ FACIL:50-315 Donald C.
Cook Nuclear Power Plant, Unit 1, Indiana M
05000315
,50-316 Donald C.
Cook Nuclear Power Plant, Unit 2, Indiana M
05000316 AUTH.NAME AUTHOR AFFILIATION BAKKEN,A.C.
Indiana Michigan Power Co.
RECZP.NAME RECIPIENT AFFILIATION Records Management Branch (Document Control Desk)
SUBJECT:
Forwards fitness-for-duty program performance data for period of 990101-0630 for DC Cook Nuclear Plants, Units 1
2,per 10CFR26.71(d).
DISTRIBUTION CODE: A021D COPIES RECEIVED:LTR ENCL SIZE:
TITLE: "Semiannual Fitness for Duty Program Performance Rept/Data" 10CFR26.7 NOTES:
RECIPIENT ZD CODE/NAME STANG, J FILE CENTER 01 NUDOCS -"ABSTRACT EXTERNAL: NOAC COPIES LTTR ENCL 1
1 1
1 1
1 1
1 RECIPIENT ID CODE/NAME mm/nZXM/RSS.
R'GN3 NRC PDR COPIES LTTR ENCL 1
1 1
0 R
i< (
NOTE TO,ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE. TO HAVE '"uuR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)
ON EXTENSION 4IS-2083 TOTAL NUMBER OF COPIES REQUIRED:
LTTR 7
ENCL 7
/
0
'~l
4 t.
~ ~
Indiana llichigan Power Company Ccaktadaar Rsa One CoakPkaa Myna.aa 491 06 6164%560I INOlAMA lNCNRNM tOWÃk August 23, 1999 C0899-10 10 CFR 26.71(d)
Docket Nos:
50-315 50-316 U ~ S. Nuclear Regulatory Commission ATTN:
Document Control Desk Mail Stop 0-Pl-17 Washington, DC 20555-0001 Donald C.
Cook Nuclear Plant Units 1 and 2
10 CFR PART 26, FITNESS FOR DUTY PROGRAM f
ls,
.i=
I In accordance with 10 CFR this 'submittal represents fitness for duty program period from January 1,
199 performance data sheets th categories of testing, subs and a summary of management Sincerely, 26.71(d),'itness for Duty 'Progra'm, the Donald C.
Cook Nuclear
-'Plant,':
performance data for the six-month 9,
to June 30, 1999.'ttached;,,are at.,include-,statistics>'o'n:,the,rvariousp-,';:..~:
tance's for which testing.is conducti'd,"..".;"i'..
U A. C. Bakken,'II-Site Vice President
~
/dms Attachment c:
J.
E. Dyer, w/at tachment MDEQ DW 6
RPD NRC Resident Inspector, w/attachment R. Whale w/attachment
- 3) t>'9 99083<0
~5
@03%5 coo ~< 0~ pgg 8
qS
~(c
'c@
AEP: America's Esery Nrlser-
~
4
'w
~
v 1 4l S
t
~
~
)
t'
J.
S. Nuclear Regulatory Commission Page 2
C0899-10 bc:
T.
P. Beilman, w/attachment K. E. Burkett, w/attachment J. J.
- Euto, w/attachment FOLIO, w/attachment R.
C. Godley/G.
P. Arent/J. Burford M.
W. Marano, w/attachment M.
W. Rencheck/D.
J. Garner/S.
A. Greenlee/W.
S.
Lacey J.
F. Stang, Jr.,
NRC - Washington, DC - w/attachment
f(
fl jf
Attachment C0899-10 Page 1
TESTING CATEGORIES AND SUBSTANCES The following is offered as an explanation for information outlined in the performance data report regarding the various categories of testing and the substances for which testing is conducted:
Long-term contractor personnel plant protection contractors Short-term contractor personnel all contractor personnel other than plant protection Marijuana confirmed positives noted on page two of the performance data report are reported as:
~
five positives for short-term contractor personnel at Donald C.
Cook Nuclear Plant's (CNP) more conservative cut-off level (50 nglml),
and
~
four positives for short-term contractor personnel and one positive for long-term contractor at CNP's suspect level (20 ng/ml).
Of the total positive tests
- reported, seventeen were the result of pre-access applicant tests (sixteen with positive results and one deemed positive based on an adulterated sample),
six for-cause
- tests, and one follow-up test.
A total of 24 tests were reported as positive on the "Breakdown of Confirmed Positive Tests for Specific Substances."
A 4I ~
~
'4
~
Attachment C0899-10 Page 2
FlTNESS FOR DUTYPROGRAM PERFORMANCE DATA PERSONNEL SUBJECT TO 10CFR26 lndlono Michigan Power Co.
Cook Nuclear Plant, Brldgman, Michigan 6 Month Ending KE Btntcott Contact Noma (616)466.33M Phone Cutofh: Screen/Confinnallon (ng/ml)
Ki Appencfhh to 10CFR28 Montuana 50/18 Cocaine 300/150 Oplotes 30QI300 Amphetamine 1000/M0 P he ncycMne 25/25 Alcohol ('ABAC) 0.04%
N/A N/A N/A N/A N/h H/h Testing Results Uconaoe Employees Long Tenn Co'ntractor Personnel Short-Tenn Contnactor Personnal
~ Average Number with Unescortod Access Categories 1188 Tested Positive 87 130 Tested 1288 g
1 Positive Tested 1
~
1121 18 For~usa Post Accident i'
'For~usa Obaervod Behavior FoSow4/p Total 2
1571 2't Mi28'd 68EC 990 9T9 Gdd J.NV ld >l003 TZ:O'T 666'-hZ-cSS
I$
E8 d lUJ.Ol Att:achment C0899-10 Page 3
BREAKDOWNOF CONFIRMED POSITIVE TESTS FOR SPECIFIC SUBSTANCES Ucensee Employee Mantua naicomine 50
) t00l 0'
0 Opiates phetami~phencycfidene 0
To Test Mariana! Adulterated Susped 'pecimen Specimen',
0 0
I Long-Term Contractors Short-Term Contractors 0'l 0
0 5"
ol 0
0 10
~
0 l
1 t
0 I
Total 5l 0
1 5
It Total confirmeo positive Tests For Art specific substances, Refusats to Teat and Adutterated specimens:
. 24
~ 1 1LI 1
I 'APING Tw ~ RT ccc'r j2
Attachment C0899-10 Page 4
MANAGEMENT ACTIONS:
Meetings are conducted with laboratory, collection site, Medical Review Officer(s),
Employee Assistance Program
- staff, and psychological assessment personnel to assure consistent and effective implementation of the fitness for duty (FFD) program.
The high number of pre-access positive results is attributed to the CNP's "suspect specimen"
- process, and the large number of contractor personnel in-processing.
Specimens collected and deemed "suspect specimens" are tested at a lower cut-off level.
Observed behavior in the collection
- facility, specimen temperature out of
- range, and collection site specific gravity test results out of range are some of the bases for identifying a "suspect specimen" and considering whether a
particular individual may have altered or substituted
- a. '.-urine specimen.
, A second specimen is obtained under direct observation>,as applicable, and both specimens are tested at
%he '"suspect specimen",'ut-off level.
Actions and sanctions taken as a result of positive test results are performed in accordance with FFD regulatory requirements.
APPEALS:
The canine program continues to be a
constant reminder to plant personnel of CNP's commitment to maintain a drug.free work environment, The canine unit provides anti-drug presentations to.local schools,'and other community organizations in addition to regular tours of
.CNP property.
The canine unit is also made '"availhble'",'to,i local%'." law'>>"'.':-
enforcement
- agencies, upon request.
'P 9 ~
Four appeals were received during this reporting. period.-
,The;'-jpppeal;-
process at CNP provides notice and an opportunity =to'provide addi't'ionQ."."'"
information for an impartial management review. 'he appeals Xor.these individuals were denied based "on failure to provide 'sufficient
'itigating circumstances or evidence showing why
. the denial determination was incorrect.
EVENTS:
There were no events identified as reportable in accordance with 10 CFR 26.73 during this reporting period.
TEMPORARY SUSPENSIONS:
No temporary suspensions or administrative actions were taken against individuals based on on-site presumptive positive drug results.
Indiana Michigan Power Company continues to perform annual random testing at a
rate equal to or exceeding fifty percent of the total population.
0