October 15, 1999
Mr. R. P. Powers
Senior Vice President
Nuclear Generation Group
American Electric Power Company
500 Circle Drive
Buchanan, MI 49107-1395
SUBJECT:
NRC PHYSICAL SECURITY INSPECTION REPORT 50-315/99027(DRS);
50-316/99027(DRS)
Dear Mr. Powers:
j
This refers to the security inspection conducted between September 20-24,1999, at the
D. C. Cook Nuclear Power Station. The purpose of the inspection was to determine whether
activities authorized by the license were conducted safely and in accordance with NRC security
related requirements.
Overall, the performance of the security program, except as noted in this report, was
fundamentally sound. Security personnel were knowledgeable of their duties and demonstrated
proper implementation of security requirements. Management activities were properly focused
toward maintaining an effective security program, inspected security equipment functioned as
designed.
Based on the results of this inspection, the NRC has determined that two violations of NRC
requirements occurred. These violations are being treated as Non-Cited Violations (NCVs),
consist 9nt with Appendix C of the Enforcement Policy. These NCVs are described in the
subject inspection report. If you contest the violations or severity levels of these NCVs, you
should provide a response within 30 days of the date of this inspection report, with the basis for
your denial, to the Nuclear Regulatory Commission, ATTN: Document Control Desk,
Washington DC 20555-0001, with copies to the Regional Administrator, Region lil, and the
Director, Office of Enforcement, United States Nuclear Regulatory Commission, Washington,
DC 20555-0001.
SF
03
'
9910250089 991015
h
n
{DR
ADOCK 05000315
"t# II'd
b
_
__ .. .
..
.
.
R. Powers
-2-
Areas examined during this inspection concern a subject matter which is exempt from
disclosure according to Part 73, Title 10, Code of Federal Regulations, Section 73.21. This
information must be handled and protected in accordance with the provisions of 10 CFR 73.71.
Consequently, c~r report of this inspection will not be placed in the NRC Public Document
Room.
Sincerely,
/s/ John A. Grobe
John A. Grobe, Director
Division of Reacsor Safety
Docket Nos. 50-315;50-316
Enclosure:
Inspection Report 50-315/99027(DRS);
50-316/99027(DRS)
cc w/ encl:
A. C. Bakken Ill, Site Vice President
T. Noonan, Plant Manager
M. Rencheck, Vice President, Nuclear Engineering
NRR/DRIS/RSGB9D
cc w/encls w/o
SAFEGUARDS INFORMATION:
R. Whale, Michigan Public Service Commission
Michigan Department of Environmental Quality
Emergency Management Division
MI Department of State Police
D. Lochbaum, Union of Concerned Scientists
See Attached Distribution
DOCUMENT NAME: G:DCC99027.wpd
ro ,.e.w . uni >v oe mi. doc-nt, moie.i. in m. w,: c . copy wmout enacimenu.ncio or. r copy.4m.ii.c,
nvenciosur. w - % copy
OFFICE
Rlll
6
Rlli_,,
l
Rlil
Rlli
, , d-
l
,
,
NAME
TM&d
JCre'stf(/l
AVegel op/b
JGroideW
DATE
10/[2/D9
10/11/99'
10/ /99
' 8
10/16/9 )
OFFICIAL RECORD COPY
S k '. L AR
g
i
This
soontrolled
L
I
"
.
.
.
1
-
.
R. Powers
-3-
Distribution:
RRB1 (E-Mail)
RPC (E-Mail) -
JFS2 (Project Mgr.)(E-Mail)
J. Caldwell, Rlli w/o enci
B. Clayton, Rlil w/o enci
SRI D. C. Cook w/o encl
DRP w/o encl
DRS w/o enci
Rill PRR w/o encl
r UBLIC IE-04 w/o encl
2
Docket File w/o enci
GREENS
LEO (E-Mail)
DOCDESK (E-Mail)
\\ \\
omil
.
.
U
ybge
F
ocuntrolled
.
-
__