FEB
51993
8
Docket No. 50-315
Docket No. 50-316
Indiana Michigan Power Company
ATTN: Mr. E. E. Fitzpatrick
Vice President
Nuclear Operations Division
1 Riverside Plaza
Columbus, OH 43216
Dear Mr. Fitzpatrick:
SUBJECT:
PHYSICAL SECURITY INSPECTION AT D. C. COOK-
This refers to the inspection conducted by Mr. J. L. Belanger of this office
on January 19-22, 1993.
The inspection included a review of activities
authorized for your D. C. Cook Nuclear Power Plant facility. At the
conclusion of the inspection, the findings were discussed with those members
of your staff identified in the enclosed letter.
Areas examined during the inspection are identified in the report. Within
these areas, the inspection consisted of selective examinations of procedures,
representative records and interviews with personnel.
During this inspection, certain of your activities appeared to be in violation
of NRC requirements.
However, as described in the enclosed report, you
identified this violation, and to encourage and support licensee initiatives
for self-identification and correction of violations, the violation is not
being cited because the criteria specified in Section VII,b of the " General
Statement of Policy and Procedure for NRC Enforcement Actions," (Enforcement
Policy, 10 CFR Pr.rt 2, Appendix C (1992), were satisfied.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
this letter and the enclosed inspection report will be placed in the NRC
Public Document Room.
{ypu"o ct .o inu
,Ir
- m ay
m.s.2
1
UP % cparat'on
"'t a
hUI Decontrolled
BA
-
~-
': p
.
48 03
9302120084 930205
DR
ADOCR 0500
5
g
- _ _ _ _ _ _ -
. .
_
_ _ _ -
_ _ _ _
_ - _ _ _ _ _ _
. _ _ _ _ -
.__ _
_ _ _ - _ _ _ _ _ _ .
____ __ _ _ _- _ _ _ _
..
?
FEB
5 1993
Indiana Michigan Power Company
2
We will gladly discuss any questions you have concerning this ' inspection.
Sincerely,
.Orlfln'al slined by Jam 3 R. Cred
James R. Creed, Chief
Safeguards Section
Enclosure:
Inspe; tion Reports
No. 50-315/93002(DRSS);
No. 50-316/93002(DRSS).
(SAFEGUARDS INFORMATION)
cc w/ enclosure:
A. A. Blind, Plant Manager
NRR/DRIS/RSCB9D
NMSS/HIGDON/4E4
OE Director
cc w/ enclosure, w/o
SAFEGUARDS INFORMATION:
DCD/DCB (RIDS)
OC/LFDCB
Resident Inspector, RIII
James R. Padgett, Michigan Public
i
-Service Commission
EIS Coordinator, USEPA
Region 5 Office
Michigan Department of
Public Health
D. C. Conk, LPM, NRR
RIII
RIII
.RIII
.
$
C
M e z ( 3 r. e r n c.
rnelosura containo
,
~Belanger/sd
d
6Jorgensen
W h 8DS m oRMATIon-
02/9/93
Un n Sen ration This
4e la Dooontrolled
,