Forwards Partially Withheld Insp Repts 50-315/93-02 & 50-316/93-02 on 930119-22.No Violations Noted.Because Licensee self-identified & Corrected Violation,Violation Not Cited
ML20128F924
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 02/05/1993
From: Creed J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Fitzpatrick E
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
Shared Package
ML20128F926 List:
References
NUDOCS 9302120084
Download: ML20128F924 (2)


See also: IR 05000315/1993002

Text

_ . . . - . . _ _

,

_

$

DCA

o

1

'

S

FEB 51993

8

Docket No. 50-315

Docket No. 50-316

Indiana Michigan Power Company

ATTN: Mr. E. E. Fitzpatrick

Vice President

Nuclear Operations Division

1 Riverside Plaza

Columbus, OH 43216

Dear Mr. Fitzpatrick:

SUBJECT: PHYSICAL SECURITY INSPECTION AT D. C. COOK-

This refers to the inspection conducted by Mr. J. L. Belanger of this office

on January 19-22, 1993. The inspection included a review of activities

authorized for your D. C. Cook Nuclear Power Plant facility. At the

conclusion of the inspection, the findings were discussed with those members

of your staff identified in the enclosed letter.

Areas examined during the inspection are identified in the report. Within

these areas, the inspection consisted of selective examinations of procedures,

representative records and interviews with personnel.

During this inspection, certain of your activities appeared to be in violation

of NRC requirements. However, as described in the enclosed report, you

identified this violation, and to encourage and support licensee initiatives

for self-identification and correction of violations, the violation is not

being cited because the criteria specified in Section VII,b of the " General

Statement of Policy and Procedure for NRC Enforcement Actions," (Enforcement

Policy, 10 CFR Pr.rt 2, Appendix C (1992), were satisfied.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter and the enclosed inspection report will be placed in the NRC

Public Document Room.

{ypu"o

m.s.2 1

ct,Ir

.o inu

m ay

UP % cparat'on "'t a

BA - ~-

': p hUI Decontrolled

.

48 03

9302120084 930205 5 g

DR ADOCR 0500

. .

- _ _ _ _ _ _ - _

_ _ _ - _ _ _ _ _ - _ _ _ _ _ _ . _ _ _ _ - .__ _ _ _ _ - _ _ _ _ _ _ . ____ __ _ _ _- _ _ _ _

..

?

FEB 5 1993

Indiana Michigan Power Company 2

We will gladly discuss any questions you have concerning this ' inspection.

Sincerely,

.Orlfln'al slined by Jam 3 R. Cred

James R. Creed, Chief

Safeguards Section

Enclosure: Inspe; tion Reports

No. 50-315/93002(DRSS);

No. 50-316/93002(DRSS).

(SAFEGUARDS INFORMATION)

cc w/ enclosure:

A. A. Blind, Plant Manager

NRR/DRIS/RSCB9D

NMSS/HIGDON/4E4

OE Director

cc w/ enclosure, w/o

SAFEGUARDS INFORMATION:

DCD/DCB (RIDS)

OC/LFDCB

Resident Inspector, RIII

i James R. Padgett, Michigan Public

-Service Commission

EIS Coordinator, USEPA

Region 5 Office

Michigan Department of

Public Health

D. C. Conk, LPM, NRR

RIII RIII .RIII , .

$

~Belanger/sd

C

d

M e z ( 3 r. e r n c.

6Jorgensen

rnelosura containo

W h 8DS m oRMATIon-

02/9/93 Un n Sen ration This

, 4e la Dooontrolled