Letter Sequence RAI |
---|
|
|
MONTHYEARML20210T0561997-08-25025 August 1997 Forwards Request for Addl Info Re 970320 Response to GL 92-08, Thermo-Lag 330-1 Fire Barriers, for Donald C Cook Nuclear Power Plant,Units 1 & 2 Project stage: RAI 1997-08-25
[Table View] |
Similar Documents at Cook |
---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217J4721999-10-15015 October 1999 Forwards NRC Physical Security Insp Repts 50-315/99-27 & 50-316/99-27 on 990920-24.Two Violations Noted & Being Treated as Ncvs,Consistent with App C of Enforcement Policy. Areas Examined Exempt from Disclosure,Per 10CFR73.21 IA-99-379, First Final Response to FOIA Request for Documents.Documents Listed in App a Being Released in Entirety1999-10-0808 October 1999 First Final Response to FOIA Request for Documents.Documents Listed in App a Being Released in Entirety ML20217D9241999-10-0808 October 1999 First Final Response to FOIA Request for Documents.Documents Listed in App a Being Released in Entirety ML17335A5511999-10-0707 October 1999 Forwards LER 99-023-00, Inadequate TS Surveillance Testing of ESW Pump ESF Response Time. Commitments Identified in LER Listed ML20217D9361999-09-30030 September 1999 FOIA Request for Document Re Section 9.7 of SE by Directorate of Licensing,Us Ae Commission in Matter of Indiana & Michigan Electric Co & Indiana & Michigan Power Co,Dc Cook Nuclear Plan,Units 1 & 2 ML17326A1541999-09-20020 September 1999 Provides Notification of Change in Senior Licensed Operator Status.Operating Licenses for CR Smith,License SOP-30159-4 & Tw Welch,License SOP-30654-2 Are No Longer Required & Should Be Withdrawn ML17326A1441999-09-17017 September 1999 Submits Trace on Second Shipment of Two Plant,Unit 2 Steam Generators.Info Re Shipment Submitted ML17326A1261999-09-17017 September 1999 Forwards LER 99-022-00 Re Electrical Bus Degraded Voltage Setpoints Too Low for Safety Related Loads.Listed Commitment Identified in Submittal ML17326A1531999-09-16016 September 1999 Submits Info Pertaining to Plant Proposed Operator Licensing Exam Requirements Through Yr 2003.NRC Form 536, Operator Licensing Exam Data, Which Provides Required Info Encl ML17326A1101999-08-27027 August 1999 Forwards LER 99-021-00, GL 96-01 Test Requirements Not Met in Surveillance Tests. List of Commitments Identified in LER Provided ML17326A0991999-08-26026 August 1999 Forwards LER 99-020-00,re EDGs Being Declared Inoperable. Commitments Made by Util Are Listed ML17326A1221999-08-23023 August 1999 Forwards Revised Page 2 to 1998 Annual Environ Operating Rept, for DC Cook Nuclear Plant,Correcting Omission to App I ML17326A0981999-08-23023 August 1999 Forwards fitness-for-duty Program Performance Data for Period of 990101-0630 for DC Cook Nuclear Plants,Units 1 & 2,per 10CFR26.71(d) ML17326A0891999-08-16016 August 1999 Forwards LER 99-019-00,re Victoreen Containment High Range Monitors Not Beign Environmentally Qualified to Withstand post-LOCA Conditions.Commitments Made by Util Are Listed ML17326A0811999-08-10010 August 1999 Notifies NRC of Changes in Commitments Made in Response to GL 98-01,supplement 1, Yr 2000 Readiness of Computer Sys Ar Npps, Dtd 990623 ML17326A0821999-08-0606 August 1999 Informs That Util Is Submitting Encl Scope & Objectives for 991026 DC Cook Nuclear Plant Emergency Plan Exercise to G Shear of NRC Plant Support Branch.Exercise Will Include Full State & County Participation ML17326A1451999-08-0404 August 1999 Requests Withholding of WCAP-15246, Control Rod Insertion Following Cold Leg Lbloca. ML17326A0751999-08-0404 August 1999 Forwards LER 98-029-01, Fuel Handling Area Ventilation Sys Inoperable Due to Original Design Deficiency. Supplemental Rept Represents Extensive Rev to Original LER & Replaces Rept in Entirely.Commitment Listed ML17326A0721999-07-29029 July 1999 Forwards LER 99-018-00 Re Refueling Water Storage Tank Suction Motor Operated Valves Inoperable,Due to Inadequate Design.Listed Commitments Were Identified in LER ML17326A0711999-07-27027 July 1999 Responds to 980123 RAI Re NRC GL 87-02, Verification of Seismic Adequacy of Mechanical & Electrical Equipment in Operating Reactors,Unresolved Safety Issue (USI) A-46. ML17326A0601999-07-22022 July 1999 Forwards UFSAR, IAW 10CFR50.71(e) & Rept of Changes,Tests & Experiments as Required by 10CFR50.59(b)(2) for DC Cook Nuclear Plant,Units 1 & 2.Without UFSAR ML17326A0631999-07-22022 July 1999 Forwards LER 98-014-03, Response to High-High Containment Pressure Procedure Not Consistent with Analysis of Record. Revised Info Marked by Sidebars in Right Hand Margin. Commitments Made by Util,Listed ML17326A0311999-07-0101 July 1999 Forwards LER 99-004-01 Re Failure to Perform TS Surveillance Analyses of Reactor Coolant Chemistry with Fuel Removed. Commitments Made by Util Are Listed ML20196K5961999-06-30030 June 1999 Ltr Contract:Task Order 40, DC Cook Extended Sys Regulatory Review Oversight Insp, Under Contract NRC-03-98-021 ML17326A0281999-06-28028 June 1999 Provides Response to 981116 & 960228 RAIs Re GL 92-01. Revised Pressurized Thermal Shock Evaluation Based on New Weld Chemistry Info & Copy of W Rept WCAP-15074, Evaluation of 1P3571 Weld Metal from Surveillance Programs... Encl ML17326A0241999-06-23023 June 1999 Responds to GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Nuclear Power Plants. Y2K Readiness Disclosure for Plant & List of Commitments Encl ML17326A0121999-06-18018 June 1999 Forwards LER 99-014-00 Re Requirement of TS 4.0.5 Not Met for Boron Injection Tank Bolting.Commitments Identified in Submittal Listed ML17326A0111999-06-11011 June 1999 Provides Response to NRC RAI Re GL 97-01, Degradation of Crdm/Cedm Nozzle & Other Vessel Closure Head Penetrations. ML17325B6281999-06-0101 June 1999 Forwards LER 99-S03-00,re Nonconforming Vital Area Barriers.Commitments Made by Util Are Listed ML17325B6401999-06-0101 June 1999 Forwards LER 99-013-00 Re Safety Injection & Centrifugal Charging Throttle Valve Cavitation During LOCA Could Lead to ECCS Pump Failure.Listed Commitments Identified in Submittal ML17325B6331999-05-28028 May 1999 Forwards LER 99-S02-00,re Vulnerability in Safeguard Sys That Could Allow Unauthorized or Undetected Access to Protected Area.Commitments Made by Util Are Listed ML17265A8201999-05-24024 May 1999 Forwards LER 98-037-01,representing Extensive Rev to Original LER & Replacing Rept in Entirety.Listed Commitments Identified in Submittal ML20207A9201999-05-21021 May 1999 Ack Receipt of 990319 Response to Notice of Violation & Proposed Imposition of Civil Penalty .On 981124, Licensee Remitted Check for Payment of Civil Penalties. Licensee Requests for Extension for Response,Granted ML17325B6111999-05-21021 May 1999 Forwards Annual Radioactive Effluent Release Rept for 980101-1231 for DC Cook Nuclear Plant,Units 1 & 2. Transmittal of Submittal Was Delayed Due to Administrative Error in Regulatory Affairs Dept ML17325B6031999-05-21021 May 1999 Provides Response to NRC GL 98-04, Potential for Degradation of ECCS & Containment Spray Sys After LOCA Because of Const & Protective Coating Deficiencies & Foreign Matl in Containment. ML17325B5971999-05-20020 May 1999 Forwards LER 99-012-00,re Auxiliary Building ESF Ventilation Sys Not Being Capable of Maintaining ESF Room Temps post-accident.Commitment,listed ML17335A5281999-05-12012 May 1999 Forwards DC Cook Nuclear Plant Fitness for Duty Program Performance Dtd for six-month Period of 980701-1231,IAW 10CFR26.71(d).Info Was Delayed Due to Administrative Error in Regulatory Affairs Dept ML17335A5271999-05-11011 May 1999 Forwards Details Re Sources & Levels of Insurance Maintained for DC Cook,Units 1 & 2,as of 990401,per 10CFR50.54(w)(3). Info Was Delayed Beyond Required Date Due to Internal Oversight ML17325B5841999-05-10010 May 1999 Forwards LER 99-002-00 Re TS 4.0.5 Requirements Not Being Met Due to Improperly Performed Test.Commitments Identified in Ler,Listed ML17325B5871999-05-0707 May 1999 Forwards Current Revs of Expanded Sys Readiness Review (Essr) Implementing Procedures,For Info Purposes to Support Current NRC Insps.Current Esrr Schedule Provided for Info Purposes,Reflecting Revised Target Dates ML17325B5791999-05-0404 May 1999 Forwards LER 99-011-00,concerning Air Sys for EDG Not Supporting Long Term Operability.Commitments Made by Util Listed ML17325B5821999-05-0404 May 1999 Provides Addl Background,Description & Clarification of Previous & Revised Commitments Re UFSAR Revalidation Effort. Commitment Change Involved Alignment of UFSAR Revalidation Program Methodology to Strategy Contained in Current Plan ML17325B5741999-05-0303 May 1999 Forwards LER 99-010-00 Re RCS Leak Detection Sys Sensitivity Not in Accoradnce with Design Requirements.Listed Commitments Identified in Submittal ML17325B5631999-04-22022 April 1999 Forwards Results of Independent Chemical Evaluations Performed from Sept 1997 Through Feb 1999,re Resolution of Issues Related to License Amend 227 ML17325B5561999-04-16016 April 1999 Forwards LER 99-006-00, Fuel Crane Loads Lifted Over SFP Could Impact Energies Greater than TS Limits, IAW 10CFR50.73.Submittal Was Delayed to Allow for Resolution of Questions.Commitment Made by Licensee,Listed ML20205P0591999-04-14014 April 1999 Ninth Partial Response to FOIA Request for Documents.App Records Already Available in Pdr.Records in App T Encl & Being Made Available in Pdr.App U Records Being Released in Part (Ref FOIA Exemption 7).App V Records Withheld Entirely ML17325B5451999-04-12012 April 1999 Forwards LER 99-009-00 Re as-found RHR Safety Relief Valve Lift Setpoint Greater than TS Limit.Commitments Identified in Submittal Listed ML17325B5301999-04-0707 April 1999 Forwards LER 99-S01-01, Vulnerability in Locking Mechanism of Four Vital Area Gates, Per 10CFR50.73.Commitments Made by Util,Listed ML17325B5241999-04-0505 April 1999 Forwards Revs 0 & 1 to Cook Nuclear Plant Restart Plan, Dtd 980307 & 0407.Rev 5 Is Current Cook Nuclear Plant Restart & Supercedes Previous Revs in All Respects ML17325B5121999-04-0101 April 1999 Forwards LER 99-007-00, Calculations Show That Divider Barrier Between Upper & Lower Containment Vols May Be Overstressed. Commitments Made by Util Are Listed 1999-09-30
[Table view] Category:OUTGOING CORRESPONDENCE
MONTHYEARML20217J4721999-10-15015 October 1999 Forwards NRC Physical Security Insp Repts 50-315/99-27 & 50-316/99-27 on 990920-24.Two Violations Noted & Being Treated as Ncvs,Consistent with App C of Enforcement Policy. Areas Examined Exempt from Disclosure,Per 10CFR73.21 IA-99-379, First Final Response to FOIA Request for Documents.Documents Listed in App a Being Released in Entirety1999-10-0808 October 1999 First Final Response to FOIA Request for Documents.Documents Listed in App a Being Released in Entirety ML20217D9241999-10-0808 October 1999 First Final Response to FOIA Request for Documents.Documents Listed in App a Being Released in Entirety ML20196K5961999-06-30030 June 1999 Ltr Contract:Task Order 40, DC Cook Extended Sys Regulatory Review Oversight Insp, Under Contract NRC-03-98-021 ML20207A9201999-05-21021 May 1999 Ack Receipt of 990319 Response to Notice of Violation & Proposed Imposition of Civil Penalty .On 981124, Licensee Remitted Check for Payment of Civil Penalties. Licensee Requests for Extension for Response,Granted ML20205P0591999-04-14014 April 1999 Ninth Partial Response to FOIA Request for Documents.App Records Already Available in Pdr.Records in App T Encl & Being Made Available in Pdr.App U Records Being Released in Part (Ref FOIA Exemption 7).App V Records Withheld Entirely DD-99-03, Informs That Time Provided by NRC Regulation within Which Commission May Act to Review Director'S Decision (DD-99-03) Expired.Commission Declined Review.Decision Became Final Action on 990308.With Certificate of Svc.Served on 9903121999-03-11011 March 1999 Informs That Time Provided by NRC Regulation within Which Commission May Act to Review Director'S Decision (DD-99-03) Expired.Commission Declined Review.Decision Became Final Action on 990308.With Certificate of Svc.Served on 990312 ML20203F2541999-02-10010 February 1999 Informs That Beginning 990216,DE Hills Will Be Chief of Operations Branch Which Includes Operator Licensing Function ML20203B9001999-02-0808 February 1999 First Partial Response to FOIA Request for Documents. Forwards Documents Listed in App a Already Available in PDR, Documents in App B Released in Entirety & Documents in App C Being Withheld in Part (Ref Exemption 6) ML20199F3141999-01-13013 January 1999 Ack Receipt of Ltr Dtd 980924,transmitting Changes (Rev 33) to Plant Modified Amended Security Plan Per Provisions of 10CFR50.54(p).Issue During Limited Review Noted & Requires Clarification.Review Comments Encl ML20206N4491998-12-14014 December 1998 Forwards Insp Repts 50-315/98-24 & 50-316/98-24 on 981112-19 Re 10CFR73.71.Violations Noted Re Inadequate Search of Vehicle & Was Caused by Poor Work Practice by Individual Search Office.Nov Not Encl ML20195D8191998-11-17017 November 1998 Ack Receipt of in Response to 981013 NOV & Proposed Imposition of Civil Penalties for $500,000. Request for 60 Day Extension of Time within Which to Respond to 37 Violations in Notice,Acceptable IR 05000315/19970171998-10-13013 October 1998 Discusses Insp Repts 50-315/97-17,50-316/97-17,50-315/98-04, 50-316/98-04,50-315/98-05,50-316/98-05,50-315/98-09, 50-316/98-09,50-315/97-201 & 50-316/97-201 & Proposed Imposition of Civil Penalty in Amount of $500,000 ML20153G6791998-09-23023 September 1998 Ltr Contract:Task Order 21, DC Cook Safety Sys Functional Insp (Ssfi), Under Contract NRC-03-98-021 ML20236V9501998-07-27027 July 1998 Ack Receipt of Ltr Dtd 980320,which Transmitted Changes to Modified Amended Security Plan Submitted Under 10CFR50.54(p) ML20248C9751998-05-22022 May 1998 Forwards Partially Witheld Insp Repts 50-315/98-11 & 50-316/98-11 on 980504-08 (Ref 10CFR73.21(c)(2)).No Violations Noted.Insp Identified That Mgt Support for Security Program Significantly Improved Since Last Insp ML20247D8891998-05-12012 May 1998 Discusses Withdrawal of Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $25,000 ML20217M1781998-04-29029 April 1998 Refers to Mtg Meeting Conducted in Lisle,Il on 980422 Re Status of Operations Training Performance Improvement Initiatives.Agenda & Assessment & Actions Handout Encl IR 05000315/19980051998-04-22022 April 1998 Forwards Insp Repts 50-315/98-05 & 50-316/98-05 Re Breakdown in Surveillance Testing,Corrective Action & Design Basis Maint Concerning Ice Condenser Sys,For Review & Appropriate Action at Catawba ML20217J2131998-04-0202 April 1998 Forwards Copy of Each Revised Forms 398,personal Qualifications Statement & 396,certification of Medical Exam by Facility Licensee.Due to Error on Instructions for Form 398,addendum for Completing Form Are Provided ML20202C9561997-11-24024 November 1997 Forwards Partially Withheld Physical Security Insp Repts 50-315/97-19 & 50-316/97-19 on 970929-1003 (Ref 10CFR73.71). Violation Noted Re Armed Response Deployment Strategy Not Successfully Demonstrated During Drills Conducted in 1997 ML20210T0561997-08-25025 August 1997 Forwards Request for Addl Info Re 970320 Response to GL 92-08, Thermo-Lag 330-1 Fire Barriers, for Donald C Cook Nuclear Power Plant,Units 1 & 2 ML20148P5161997-06-30030 June 1997 Second Partial Response to FOIA Request for Documents.App B Records Being Made Available in PDR ML20141E0051997-06-27027 June 1997 Forwards Order Prohibiting Involvement in NRC-licensed Activities Re OI Rept 3-94-067.Order Being Issued as Consequence of Deliberate Falsification of Info Provided on Application to Obtain Access Authorization at Plant ML20138D0681997-04-25025 April 1997 Forwards Insp Rept 50-315/97-07 & 50-316/97-07 on 970324-28. Violations Were Corrected & Actions Were Reviewed.No Response to Violation Required ML20137N1591997-03-31031 March 1997 Informs That Licensee Facility Scheduled to Administer NRC GFE on 970409.Sonalsts,Inc Authorized Under Contract to Support NRC Administration of GFE Activities IR 05000315/19960041997-03-25025 March 1997 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-315/96-04 & 50-316/96-04 IR 05000315/19960091997-01-31031 January 1997 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-315/96-09 on 961114 ML20129K1131996-11-0505 November 1996 Forwards Copy of Master Bwr/Pwr Gfes Exam W/Answer Key for Info.W/O Encl ML20129H4471996-10-25025 October 1996 Forwards Insp Repts 50-315/96-08 & 50-316/96-08 on 960909-13.No Violations Noted ML20129F2341996-09-25025 September 1996 Discusses Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $25,000 & Demand for Info Issued to Util on 930805 as Result of Recommended Decision & Order for DOL ML20058G1151993-12-0202 December 1993 Forwards Physical Security Insp Repts 50-315/93-23 & 50-316/93-23 on 931117-19 & 22-24.No Violations Noted ML20058E6581993-12-0101 December 1993 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 940209.Informs That Facility Must Submit Ltr Identifying Individuals Who Will Take Exam ML20058B5251993-11-16016 November 1993 Forwards Safeguards Info Referened in Preliminary Draft Guide to Facilitate Comments on Proposed Rule for Protection Against Malevolent Use of Vehicles at Nuclear Power Plants. W/O Encl ML20059D2761993-10-26026 October 1993 Forwards Copy of Master Bwr/Pwr Gfes Exam W/Answer Key.W/O Encl ML20057C3871993-09-24024 September 1993 Ack Receipt of Util Ltr Transmitting Rev 25 to DC Cook Physical Security Plan.Changes Consistent W/Provisions of 10CFR50.54(p) & Acceptable,Except as Noted in Encl of Ltr. Encl Withheld ML20057B7441993-08-20020 August 1993 Ltr Contract,Awarding Task Order 52, Sys Based Instrumentation & Control Insp - DC Cook, Under Contract NRC-03-89-027 ML20128F9241993-02-0505 February 1993 Forwards Partially Withheld Insp Repts 50-315/93-02 & 50-316/93-02 on 930119-22.No Violations Noted.Because Licensee self-identified & Corrected Violation,Violation Not Cited ML20128E3091992-12-0202 December 1992 Informs of NRC Plans to Administer Generic Fundamentals Exam Section of Written OL Exam on 930210.Forwards Ltr Utils Should Follow in Order to Register Personnel to Take Generic Fundamentals Exam ML20126H0031992-06-26026 June 1992 Final Response to FOIA Request for Documents.Forwards App a Documents.App B Documents Encl & Are Being Made Available in PDR ML20198C5451991-06-27027 June 1991 Forwards Safety Insp Repts 50-315/91-11 & 50-316/91-11 on 910501-0614.No Violations Noted ML20128P5781990-11-29029 November 1990 Forwards Insp Repts 50-315/90-23 & 50-316/90-23 on 901010-1113.No Violations Noted ML20058E7141990-10-30030 October 1990 Forwards Exam Forms & Answer Keys,Grading Results & Individual Answer Sheets for Each Applicant IR 05000315/19900211990-10-0505 October 1990 Forwards Insp Repts 50-315/90-21 & 50-316/90-21 Containing Results of Review of 900713 Electrocution Event ML20059M2101990-09-25025 September 1990 Forwards Info Re Generic Fundamentals Exam Section of Operator Licensing Written Exams to Be Administered on 901010,including Map of Area Where Exams Will Be Taken, Preliminary Instructions for Exam & Equation Sheet ML20059G9571990-09-0606 September 1990 Forwards Notice of Withdrawal of 890830 Application for Amends to Licenses DPR-58 & DPR-74,revising Tech Spec Sections 3.0 & 4.0 & Accompanying Bases Sections to Incorporate Changes Recommended in Generic Ltr 87-09 ML20058M6141990-08-0707 August 1990 Forwards Sample Registration Ltr for 901010 Generic Fundamentals Section of Written Operator Licensing Exam. Registration Ltr Listing Names of Candidates Taking Exam Should Be Submitted to Region 30 Days Prior to Exam Date ML20056A4981990-08-0101 August 1990 Forwards Master Bwr/Pwr Generic Fundamentals Exam Section W/Answer Key.W/O Encls ML20059M8711990-06-13013 June 1990 Forwards NRC Performance Indicators for First Quarter 1990. W/O Encl ML20247M8111989-09-19019 September 1989 Responds to 890614 Appeal of Dh Grimsley 890526 Denial of FOIA Request for Records Re Insp of Catalytic Industrial Maint Co from 1984 to 890214.App Records Publicly Available. Remainder of Records Withheld (Ref FOIA Exemptions 5 & 7) 1999-06-30
[Table view] |
Text
_ _ _ _ _ . ..
August 25, 1997 1
I Mr. E. E. Fitzpatrick, Vice President indiana Michigan Power Company l
Nuclear Generation Group 500 Circle Drive Buchanan, MI 49107
SUBJECT:
DONALD C. COOK NUCLEAR PLANT, UNIT NOS.1 AND 2 - REQUEST FOR ADDITIONAL INFORMATION RE: THERMO-LAG RELATED AMPACITY DERATING ISSUES (TAC NOS M85538 AND M85539)
Dear Mr. Fitzpatrick:
By letter dated March 20,1997, Indiana Michigan Power Company submitted a response to the NRC Request for Additional Information related to Generic Letter 02-08, "Thermo-Lag 330-1 Fire Barriers," for the Donald C. Cook Nuclear Power Plant, Unit Nos.1 and 2. The NRC staff, in conjunction with its contractor, Sandia National Laboratories, has completed the review of your response and has identified a number of open issuet, and concems requiring clarification. Please respond to the enclosed Request for AdditionalInformation within 45 days.
f Please contact me at (301) 415-3017 if you have any questions on the above.
Sincerely, Original Signed By jg John B. Hickman, Project Manager Project Directorate 1113 Division of Reactor Projects Ill/IV Office of Nuclear Reactor Regulation Docket Nos. 50-315 and 50-316
Enclosure:
Request for AdditionalInformation h cc w/ encl: See next page DISTRIBUTION:
Docket File PUBLIC PD3-3 R/F EAdensam (EGA1)
GMarcus OGC ACRS GGrant Rlli '
R 'enkins LTran llll{ll l l 00CUMENT..a, NAME: G:\DCCOOK\CO85538.RAI 1.. min.in wc.em.m...nu r.c nc. v.=cm OFFICE PM:PD33 _
E LA:PD33, ,j E NAME JHickman (ACBoyle, W DATE plafl97 {(/M/97 "
~
OFFICIAL RECORD COPY 9709120270'970825 ADOCK 050003 5 DR m m rq g gj[;.[ [SD{ty jdgi;f fg
v nClouq
- UNITED STATES p t-s } NUCLEAR REZULATORY CSMMISSION k $ WASHINGTON. D.o. 3004 HOD 1
-***/ August 25, 1997 Mr. E. E. Fitzpatrick, Vice President Indiana Michigan Power Company Nuclear Generation Group 500 Circle Drive Buchanan, MI 49107
SUBJECT:
DONALD C. COOK NUCLEAR PLANT, UNIT NOS.1 AND 2 - REQUEST FOR ADDITIONAL INFORMATION RE: THERMO-LAG RELATED AMPACITY DERATING ISSUES (TAC NOS. M85538 AND M85539)
Dear Mr. Fitzpatrick-By letter dated March 20,1997, Indiana Michigan Power Company submitted a response to the NRC Request for Additional information related to Generic Letter 92-08, "Thermo-Lag 330-1 Fire Barriers," for the Donald C. Cook Nuclear Power Plant, Unit Nos.1 and 2. The NRC staff, in conjunction with its contractor, Sandia National Laboratories, has completed the review of your response and has identified a number of open issues and concems requiring clarification. Please respond to the enclosed Request for AdditionalInformation within 45 days.
Please contact me at (301) 415-3017 if you have any questions on the above.
Sincerely, John B. Hickman, Project Manager Project Directorate 111-3 Division of Reactor Projects lil/IV Office of Nuclear Reactor Regulation Docket Nos. 50-315 and 50-316
Enclosure:
Request for AdditionalInformation cc w/ encl; See next page l
t
- E. E..Fitzpatrick Donald C. Cook Nuclear Plant Indiana Michigan Power Company Unit Nos. I and 2 cc:
Regional Administrator, Region III Steve J. Brewer U.S. Nuclear Regulatory Commission Indiana Michigan Power Company 801 Warrenville Road Nuclear Generation Group Lisle, IL 60532-4351 500 Circle Drive Buchanan, MI 49107 Attorney General i Department of Attorney General 525 West Ottawa Street Lansing, MI 48913 Township Supervisor Lake Township Hall P.O. Box 818 Bridgman, MI 49106 Al Blind, Site Vice President Donald C. Cook Nuclear Plant 1 Cook Place t Bridgman, MI 49106 U.S. Nuclear Regulatory Commission Resident Inspector's Office-7700 Red Arrow Highway Stevensville, MI 49127 Gerald Charnoff, Esquire Shaw, Pittman, Potts and Trowbridge 2300 N Street, NW.
Washington, DC 20037 Mayor, City of Bridgman P.O. Box 366
^
- Bridgman, MI 49106 Special Assistant to the Governor Room 1 - State Capitol Lansing, MI 48909 4 Drinking Water and Radiological Protection Division Michigan Department of Environmental Quality 3423 N. Martin Luther King Jr Blvd P.O. Box 30630 CPH Mailroom Lansing, MI 48909-8130 1
4 4
.: REQUEST FOR ADDITIONAL INFORMATION DONALD C. COOK NUCLEAR POWER PLANT. UNIT NOS.1 AND 2 FIRE BARRIER AMPACITY DERATING ISSUES fTAC NOS, M85538 AND M85539) i 1.0 - BACKGROUND .
l 1 By letter dated March 20,1997, Indiana Michigan Power Company (the licensee) submitted its response to the second NRC Request for Additional Information (RAl) related to Generic Letter 92-08, "Thermo-Lag 330-1 Fire Barriers, for the Donald C. Cook Nuclear Power Plant (DCNPP), Unit Nos.1 and 2. This response included the following attachments:
Attachment 1: Response to RAI Regarding Thermo-Lag Related Ampacity Derating issues
- for Cook Nuclear Plant; .
Attachment 2: Table Depicting Correlation Between the Predicted and Measured Ampacities; i Attachment 3: Model Computer Code; i
Attachment 4: Test Report CL-492; i
Attachment 5: Comparison Tables Providing Base Information Regarding Trays and Conduits Cable Full Load Amperes, and Comparison of Calculated
{ Ampacities vs. ICEA Ampacities; and Attachment 6: Ampacity vs. Depth of Fill Plot for #12 AWG Cable in Tray.
The DCNPP ampacity derating methodology involves the application of two separate but
- related models, in the first model (denoted as Part 1 Analysis), the licensee calculates the overall heat rejection capacity for a given cable tray (conduit) based on heat transfer correlations and calculations, in this analysis, a series of calculations are performed for each uniquely sized cable in the tray and the limiting heat intensity is used _in the Part 2 analysis for all cables in the tray, in the second model (denoted as Part 2 Analysis), the licensee calculates, based on the Part 1 analysis, the allowable ampacity limit for individual cables.
This calculation is basically a partitioning of the total heat load to individual cables.
The NRC staff, in conjunction with its contractor, Sandia National Laboratories (SNL), has
- completed the review of the licensee's submittal, and requires that the questions listed below are addressed by the licensee.
' 2.0 QUESTIONS -
2.1 The staff requested in its RAI dated December 2,1996, (Item 2.2 - Part 1 Analysis,
! Appendix A of Attachment A) that Appendix C, as well as any other documentation that will support the validation of the experiments cited in the licensee submittal dated May 12,1995, be submitted for staff review.
[
! ENCLOSURE l-l r
Although the licensee submittal dated March 20,1997, provided additional clarification, SNL found that the licensee plot of ampacity versus (d/R,)" and its initial validations were based only on those tests that involved a nondiverse cable fill. The original concem raised by SNL pertained to the fact that the licensee has not shown that the thermal model, specifically, the diameter based partitioning method, was appropriate for diverse cable loads actually installed in the plant. An analysis of the licensee test data by SNL indicates that the licensee assumed the diameter ,
partitioning method may not be appropriate and may result in overestimation of the amrwity limits for smaller cables in diversely loaded trays (see Section 3.2 and Appendix C of the attached SNL report for furiher details.) The licensee is requested to address the subject concems and to provide an adequate validation of the heat load partitioning methodology.
2.2 The staff requested in its RAI dated December 2,1996, (Item 2.3 - Part 2 Analysis, Appendix B of Attachment) that the licensee provide a direct comparison of predicted cable ampacity limits to those measured in experiments on the corresponding system in order to validate its calculations.
SNL finds that the response provided in the licensee submittal dated March 20,1997,
[
to be only partially responsive to the subject concems. Specifically, model versus experimental comparisons have only been provided for two specific tests. None of the cables involved with the subject tests were loaded to its ampacity limit. SNL identified the following concems with the licensee validations efforts: (1) the licensee model predicts an ampacity value significantly higher than measured in the test; (2) the licensee studies did not consider the full range of test dates available to the licensee; and (3) SNL assessments have identified potential inconsistencies between the model results and experimental test data. Overall, SNL finds that the licensee validations study, as provided by the subject licensee submittel, to be inadequate to justify reliance on the licensee approach to thermal modeling techniques (see Appendix C, Section 2.2, and Section 3.3.2 of the attached SNL report for further details.)
The licensee is requested to address the subject concems and to provide a complete validation of ampacity model results to applicable experimental test data.
2.3 The staff requested in its RAI dated December 2,1996, (Item 2.3 - Part 2 Analysis, Appendix B of Attachment) that the licensee provide the supporting validation results which justified its treatment of cable trays using equivalent annular region assumptions.
As stated in item 2.2 above, SNL has found that the licensee validation studies to be
. inadequate and that, in its own validation studies, SNL identified inconsistencies and potential nonconservatisms in the licensee thermal model. (See Sections 3.3.6 and 4.2, and Appendices B and C of the attached SNL report for further details.)
The licensee is requested to address the subject concems regarding validation of its thermal model.
1 .
'4 2.4 The staff requested in its RAI dated December 2,1996, (ltem 2.4 - Representative Calculation Results) that the licensee provide a direct comparison between ampacity loads installed at DCNPP to the ICEA Standard P-54 440 ampacity limits and to justify.
any cases which exceed ICEA P-54-440 limits. SNL reviewed Attachment 5 calculations which were contained in the licensee submittal dated March 20,1997, and identified four apparent errors. As a result of a reanalysis of the most significant -
of the licensee cable applications, SNL identifed four specific cables which appear to be nominally overloaded even in the absence of the fire barrier _ system and six additional cables which may have insufficient ampacity dorating margin. (See Section 4.5 and Appendix A of the attached SNL report for further details.)
The licensee is requested to provide additional justification for the acceptability of the ampacity loading on the 10 cables as identifed in the attached SNL report.
2.5 SNL found that several licensee responses as provided in the licensee submittal dated !
March 20,1997, did not provide sufficient information to resolve the identifed ;
concems cited in the staff RAI dated December 2,1996. However, all of the deficient responses were directly related to thermal modeling concems. Those deficient responses which were not identified in the above items are discussed in Sections !
3.3.3, 3.3.6, 3.3,7, 3.3.8, 3.3.9, 3.4.1, 3.4.2, 3.4.6L and 3.4.8 of the attached SNL report Although the staff agrees with its contractor SNL that the pursuit of an integrated resolution of the concems for the licensee thermal model and its implementation is the primary review objective, the staff requests that the licensee ^
j address the above deficient responses in those instances where the applicable concem may materially impact the acceptability of the licensee ampacity model results and validation studies.
Overall, SNL has recommended that the licensee thermal model should not be credited as an appropriate basis for analysis without significant further review and 1 validation. Further, in the case where the licensee plans to continue to seek-acceptability of its current thermal model, SNL recommends that the licensee provide the following changes or additional information:
- The actual computer code implementation should be reformulated in order to !
comply with accepted engineering practice for a structured program. -This !
I revision should include an organized logical code structure that allows for a direct and clear understanding of the program flow and flow control, and the explicit ,
definition of intemal variables, input variables, and flow control parameters. The - l revised code should be amenable to independent implementation and verification.
i
- The validation study should be supplemented to provide a direct comparison of .I I
total allowable heat rejection capacity as calculated by the thermal model and as measured in these tests, i.e., the 11 specific tests cited in the licensee CL-492 test report.-- The subject tests include those tests performed using the " solid i' bottom / solid cover /no fire barrief tray configuration and those tests performed using the " vented bottom /no cover / solid fire barrief tray configuration.
4 The staff fully supports the above SNL recommendations. The staff requests that the licensee either implement those recommendations or provide an attemate technical analysis to resolve the subject concems regarding the licenses thermal model and its implementation at the Donald C. Cook Nuclear Plant.
Attachment:
Ltr Rpt to USNRC, Rev. O, dtd 6/19/97 4