| number = ML20065H686
| number = ML20065H686
| issue date = 03/31/1994
| issue date = 03/31/1994
| title = Monthly Operating Rept for Mar 1994 for Waterford 3.W/940413 Ltr
| title = Monthly Operating Rept for Mar 1994 for Waterford 3
| author name = Becker T, Burski R
| author name = Becker T, Burski R
| author affiliation = ENTERGY OPERATIONS, INC.
| author affiliation = ENTERGY OPERATIONS, INC.
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:y              ,
                                                                                                                    ~
7ep;! *
* 9 Pr~'ENTERGY                                                                    E75 ''*"" "" '"''
kena L A N0(C ~                    '
Te4 504 739 6774-R. F. Burski tauxe.
UkJ Yif ?Ob?f wwwa                                :
W3F1-94-0045 A4.05 PR April 13, 1994 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 9
 
==Subject:==
Waterford 3 SES Docket No. 50-382 License No. NPF-38 Monthly Operating Report a
Gentlemen:
* Attached is.the subject monthly report which covers the operating                                  ;;
statistics for the month of March,1994. This report is' submitted per Section 6.9.1.6 of the Waterford 3 Technical Specifications-for Facility                              '
Operating License No. NPF-38.                                                                        O t.
Very truly yours,                                                                                      -
R.F. Burski
                  -Director Nuclear Safety                                                                                        ;
RF8/CJT/ssf
                  . Attachment                                                                                            ,
cc:              L.'J.. Callan, (NRC Region IV), R.B. Mc'Gehee,                                      ,
N.S. Reynolds, F. Yost-(Utility Data Institute, Inc;),                              ;
J.T..Wheelock (INP0 Records Center),'NRC Resident:
Inspectors Office                                                            '7'l +1
                '9404150114 940331- --      2                                                          -
p eq DR. ADOCK'0500 quvuyg                                                                                      V          -
        -                      -        .                                ~        _.              .          ,
 
  ;..        r 4
NRC MONTHLY OPERATING REPORT
 
==SUMMARY==
OF OPERATIONS WATERFORD 3 MARCH 1994 The unit operated at an average reactor power of 12.6% and shutdown for Refuel Outage 6 during the period.
L ..    -i_. .
 
      ,;            2.-
PRESSURIZER SAFETY VALVE FAILURES AND CHALLENGES WATERFORD 3 During the month of March 1994, there were no pressurizer safety valve failures or challenges, I
1.
L:
g
 
c., .
                                                                                                                        .y
                                                                                                                        ')
OPERATING DATA REPORT                                              .l
                        .                                                                                              o DOCKET NUMBER: 50-382 UNIT NAME: WATERFORD 3 DATE OF REPORT: APRIL,1994 COMPLETED BY:      T.S. BECKER TELEPHONE: 504-7394683 OPERATING SIATUS
: 1.      Reporting Period: March,1994 Gross Hours in Reporting Pericc. .Z43_
: 2. Currently Authorized Power Level (MWt): 3390 Maximum Dependable Capacity (Net MWe): 1075 Design Electrical Rating (Net MWe): 1104                                                            1
: 3.      Power Level to which Restricted (if any) (Net MWe): N/A                                            C
: 4. Reasons for Restriction (if any): N/A
:l THIS MONTH        YR TO DATE          CUMULATIVE 5,  Number of Hours Reactor was Critical 95.4            1,511.4          62,611.4 3
: 6. Reactor Reserve Shutdown Hours                        -                                    .
: 7. Hours Generator was On-line                        95.3            1,511.3          61,799.5
: 8. Unit Peserve Shutdown Hours                                                                                                                                                                                  .;
: 9. Gross Thermal Energy Generated (MWH)                                  318.321          5,109,327        204.137,804
: 10. Gross Electrical Energy Generated (MWH)                                  104,350          1,672,060        68,092,840
: 11. Not Electrical Energy                                                                                      ,
Generated (MWH) .                                91,760          1,593,593        64,904,038
,          12. Reactor Service Factor                                  12.8'              70.0              83.9          i i
: 13. Reactor Availability Factor                            12.8                70.0              83.9 1
: 14. Unit Service Factor                                    12.8                70.0              82.8'      U
.          15. Unit Availability Factor                              12.8                70.0              82.8 i
: 16. Unit Capacity Factor (using MDC)                      11.5                68.7              80.9
: 17. Unit Capacity Factor (Using DER)                      11.2                66.9              78.7
: 18. Unit Forced Outage Rate                                                                3.4
 
b-4 OPERATING DATA REPORT DOCKET NUMBER: 50-382 UNIT NAME: WATERFORD 3 DATE OF REPORT: APRIL,1994 COMPLETED BY:        T.S. BECKER
                                                                                . TELEPHONE: 504-739-6683 OPERATING DATA REPORT (Can't)
: 19. Shutdowns Scheduled over next 6 Months (type, date and duration of each):
: 20. If Shutdown at end of report period, estimated date of startup: April 18,1994
: 21. Unit in Commercial Operation THIS MONTH            YR TO DATE          CUMULATIVE
: 22. Hours in Reporting Period                          743.0                  2159.0          74,664.0
: 23. Unit Forced Outage Hours                              0.0                    00            2,178.7
: 24. Nameplate Rating (Gross MWe): 1200
: 25. If Changes Occur in Capacity Ratings (items Number 2 and 24) Since Last Report, Give Reasons: N/A I
 
i..
    .., ..;?,
AVERAGE DAILY UNIT POWER LEVEL DOCKET NUMBER: 50-382 UNIT NAME: WATERFORD 3 DATE OF REPORT: APRIL,1994 COMPLETED BY: . T.S. BECKER TELEPHONE: 504-739-6683 MONTH JAARCH.1994 DAY AVERAGE DAILY POWER LEVEL                            DAY AVERAGE DAILY POWER LEVEL (MWe-NET)                                              (MWe-NET) 1    1055                                              17    (6) 1 2    1053                                              18    (5) 3    1054                                              19    (5)                                  '
4      980                                              20    (11) 5      (36)                                              21    (9) 6      (21)                                              22    (8) 7      (22)                                              23    (9) l 8      (14)                                              24    (12) 9      (14)                                              25    (12) 10    (12)                                              26    (12) 11    (13)                                              27    (12)                                    -l 12    (13)                                              28    (6) 13    (12)                                              29  _ 8)
(
14 J13)                                                  30    (10) 15    (11)                                              31    (9)                                        l 16      (6)
                                                                                                                        -l INSTRUCTIONS On this format, list the average daily unit power level in MWts-Net fcr each day in the reporting month.
Compute to the nearest whole megawatt.
 
4                                                                                                                                                              g -            'g UNIT SHUTDOWNS AND POWER REDUCTIONS                                                          . .
DOCKET NUMBER- 50-382                  ,
UNIT NAME- WATERFORD 3 DATE OF REPORT: APRIL,1994              -
COMPLETED BY: T.S. BECKER                -
TELEPHONE- 504-739-6683 REPORT FOR MARCH.1994 Type                                      Method of Shutting F = Forced      Duration                  Down the Reactor or-  Cause. Comments and Number        Data          S = Schedufed (Hours)          Reason (1) Reducino Power (2)    Corrective Actions 94-01          940304            S          647.7              C              2              Unit removed from service to begin Refuel Outage 6.
(1) REASON                              .
(2) METHOD A=      Equipment Failure (explain)              1=      Manual B=      Maintenance or Test                      2=      Manual Scram C=      Refueling                                3=      Automatic Scram D=    Regulatory Restriction -                  4=      Continuation from Previous Period E=    Operator Training and                      5=      Power Reduction License Examination                        6=      Other(explain)
F=    Administrative G=    Operational Enor (explain)
H=    Other(explain) l l
_ _ _ _ _ _ _ _ _ _  m __ __ _ _    .m.    ~                .                                          *              .          _                        ___________m~ -    -}}

Latest revision as of 08:18, 6 January 2021

Monthly Operating Rept for Mar 1994 for Waterford 3
ML20065H686
Person / Time
Site: Waterford Entergy icon.png
Issue date: 03/31/1994
From: Becker T, Burski R
ENTERGY OPERATIONS, INC.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
W3F1-94-0045, W3F1-94-45, NUDOCS 9404150114
Download: ML20065H686 (7)


Text

y ,

~

7ep;! *

  • 9 Pr~'ENTERGY E75 *"" "" '"

kena L A N0(C ~ '

Te4 504 739 6774-R. F. Burski tauxe.

UkJ Yif ?Ob?f wwwa  :

W3F1-94-0045 A4.05 PR April 13, 1994 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 9

Subject:

Waterford 3 SES Docket No. 50-382 License No. NPF-38 Monthly Operating Report a

Gentlemen:

  • Attached is.the subject monthly report which covers the operating  ;;

statistics for the month of March,1994. This report is' submitted per Section 6.9.1.6 of the Waterford 3 Technical Specifications-for Facility '

Operating License No. NPF-38. O t.

Very truly yours, -

R.F. Burski

-Director Nuclear Safety  ;

RF8/CJT/ssf

. Attachment ,

cc: L.'J.. Callan, (NRC Region IV), R.B. Mc'Gehee, ,

N.S. Reynolds, F. Yost-(Utility Data Institute, Inc;),  ;

J.T..Wheelock (INP0 Records Center),'NRC Resident:

Inspectors Office '7'l +1

'9404150114 940331- -- 2 -

p eq DR. ADOCK'0500 quvuyg V -

- - . ~ _. . ,

.. r 4

NRC MONTHLY OPERATING REPORT

SUMMARY

OF OPERATIONS WATERFORD 3 MARCH 1994 The unit operated at an average reactor power of 12.6% and shutdown for Refuel Outage 6 during the period.

L .. -i_. .

,; 2.-

PRESSURIZER SAFETY VALVE FAILURES AND CHALLENGES WATERFORD 3 During the month of March 1994, there were no pressurizer safety valve failures or challenges, I

1.

L:

g

c., .

.y

')

OPERATING DATA REPORT .l

. o DOCKET NUMBER: 50-382 UNIT NAME: WATERFORD 3 DATE OF REPORT: APRIL,1994 COMPLETED BY: T.S. BECKER TELEPHONE: 504-7394683 OPERATING SIATUS

1. Reporting Period: March,1994 Gross Hours in Reporting Pericc. .Z43_
2. Currently Authorized Power Level (MWt): 3390 Maximum Dependable Capacity (Net MWe): 1075 Design Electrical Rating (Net MWe): 1104 1
3. Power Level to which Restricted (if any) (Net MWe): N/A C
4. Reasons for Restriction (if any): N/A
l THIS MONTH YR TO DATE CUMULATIVE 5, Number of Hours Reactor was Critical 95.4 1,511.4 62,611.4 3
6. Reactor Reserve Shutdown Hours - .
7. Hours Generator was On-line 95.3 1,511.3 61,799.5
8. Unit Peserve Shutdown Hours .;
9. Gross Thermal Energy Generated (MWH) 318.321 5,109,327 204.137,804
10. Gross Electrical Energy Generated (MWH) 104,350 1,672,060 68,092,840
11. Not Electrical Energy ,

Generated (MWH) . 91,760 1,593,593 64,904,038

, 12. Reactor Service Factor 12.8' 70.0 83.9 i i

13. Reactor Availability Factor 12.8 70.0 83.9 1
14. Unit Service Factor 12.8 70.0 82.8' U

. 15. Unit Availability Factor 12.8 70.0 82.8 i

16. Unit Capacity Factor (using MDC) 11.5 68.7 80.9
17. Unit Capacity Factor (Using DER) 11.2 66.9 78.7
18. Unit Forced Outage Rate 3.4

b-4 OPERATING DATA REPORT DOCKET NUMBER: 50-382 UNIT NAME: WATERFORD 3 DATE OF REPORT: APRIL,1994 COMPLETED BY: T.S. BECKER

. TELEPHONE: 504-739-6683 OPERATING DATA REPORT (Can't)

19. Shutdowns Scheduled over next 6 Months (type, date and duration of each):
20. If Shutdown at end of report period, estimated date of startup: April 18,1994
21. Unit in Commercial Operation THIS MONTH YR TO DATE CUMULATIVE
22. Hours in Reporting Period 743.0 2159.0 74,664.0
23. Unit Forced Outage Hours 0.0 00 2,178.7
24. Nameplate Rating (Gross MWe): 1200
25. If Changes Occur in Capacity Ratings (items Number 2 and 24) Since Last Report, Give Reasons: N/A I

i..

.., ..;?,

AVERAGE DAILY UNIT POWER LEVEL DOCKET NUMBER: 50-382 UNIT NAME: WATERFORD 3 DATE OF REPORT: APRIL,1994 COMPLETED BY: . T.S. BECKER TELEPHONE: 504-739-6683 MONTH JAARCH.1994 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-NET) (MWe-NET) 1 1055 17 (6) 1 2 1053 18 (5) 3 1054 19 (5) '

4 980 20 (11) 5 (36) 21 (9) 6 (21) 22 (8) 7 (22) 23 (9) l 8 (14) 24 (12) 9 (14) 25 (12) 10 (12) 26 (12) 11 (13) 27 (12) -l 12 (13) 28 (6) 13 (12) 29 _ 8)

(

14 J13) 30 (10) 15 (11) 31 (9) l 16 (6)

-l INSTRUCTIONS On this format, list the average daily unit power level in MWts-Net fcr each day in the reporting month.

Compute to the nearest whole megawatt.

4 g - 'g UNIT SHUTDOWNS AND POWER REDUCTIONS . .

DOCKET NUMBER- 50-382 ,

UNIT NAME- WATERFORD 3 DATE OF REPORT: APRIL,1994 -

COMPLETED BY: T.S. BECKER -

TELEPHONE- 504-739-6683 REPORT FOR MARCH.1994 Type Method of Shutting F = Forced Duration Down the Reactor or- Cause. Comments and Number Data S = Schedufed (Hours) Reason (1) Reducino Power (2) Corrective Actions 94-01 940304 S 647.7 C 2 Unit removed from service to begin Refuel Outage 6.

(1) REASON .

(2) METHOD A= Equipment Failure (explain) 1= Manual B= Maintenance or Test 2= Manual Scram C= Refueling 3= Automatic Scram D= Regulatory Restriction - 4= Continuation from Previous Period E= Operator Training and 5= Power Reduction License Examination 6= Other(explain)

F= Administrative G= Operational Enor (explain)

H= Other(explain) l l

_ _ _ _ _ _ _ _ _ _ m __ __ _ _ .m. ~ . * . _ ___________m~ - -