| title = Monthly Operating Rept for Mar 1994 for Waterford 3 | | title = Monthly Operating Rept for Mar 1994 for Waterford 3 | ||
| author name = Becker T, Burski R | | author name = Becker T, Burski R | ||
| author affiliation = ENTERGY OPERATIONS, INC. | | author affiliation = ENTERGY OPERATIONS, INC. | ||
Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter:}} | {{#Wiki_filter:y , | ||
~ | |||
7ep;! * | |||
* 9 Pr~'ENTERGY E75 ''*"" "" '"'' | |||
kena L A N0(C ~ ' | |||
Te4 504 739 6774-R. F. Burski tauxe. | |||
UkJ Yif ?Ob?f wwwa : | |||
W3F1-94-0045 A4.05 PR April 13, 1994 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 9 | |||
==Subject:== | |||
Waterford 3 SES Docket No. 50-382 License No. NPF-38 Monthly Operating Report a | |||
Gentlemen: | |||
* Attached is.the subject monthly report which covers the operating ;; | |||
statistics for the month of March,1994. This report is' submitted per Section 6.9.1.6 of the Waterford 3 Technical Specifications-for Facility ' | |||
Operating License No. NPF-38. O t. | |||
Very truly yours, - | |||
R.F. Burski | |||
-Director Nuclear Safety ; | |||
RF8/CJT/ssf | |||
. Attachment , | |||
cc: L.'J.. Callan, (NRC Region IV), R.B. Mc'Gehee, , | |||
N.S. Reynolds, F. Yost-(Utility Data Institute, Inc;), ; | |||
J.T..Wheelock (INP0 Records Center),'NRC Resident: | |||
Inspectors Office '7'l +1 | |||
'9404150114 940331- -- 2 - | |||
p eq DR. ADOCK'0500 quvuyg V - | |||
- - . ~ _. . , | |||
;.. r 4 | |||
NRC MONTHLY OPERATING REPORT | |||
==SUMMARY== | |||
OF OPERATIONS WATERFORD 3 MARCH 1994 The unit operated at an average reactor power of 12.6% and shutdown for Refuel Outage 6 during the period. | |||
L .. -i_. . | |||
,; 2.- | |||
PRESSURIZER SAFETY VALVE FAILURES AND CHALLENGES WATERFORD 3 During the month of March 1994, there were no pressurizer safety valve failures or challenges, I | |||
1. | |||
L: | |||
g | |||
c., . | |||
.y | |||
') | |||
OPERATING DATA REPORT .l | |||
. o DOCKET NUMBER: 50-382 UNIT NAME: WATERFORD 3 DATE OF REPORT: APRIL,1994 COMPLETED BY: T.S. BECKER TELEPHONE: 504-7394683 OPERATING SIATUS | |||
: 1. Reporting Period: March,1994 Gross Hours in Reporting Pericc. .Z43_ | |||
: 2. Currently Authorized Power Level (MWt): 3390 Maximum Dependable Capacity (Net MWe): 1075 Design Electrical Rating (Net MWe): 1104 1 | |||
: 3. Power Level to which Restricted (if any) (Net MWe): N/A C | |||
: 4. Reasons for Restriction (if any): N/A | |||
:l THIS MONTH YR TO DATE CUMULATIVE 5, Number of Hours Reactor was Critical 95.4 1,511.4 62,611.4 3 | |||
: 6. Reactor Reserve Shutdown Hours - . | |||
: 7. Hours Generator was On-line 95.3 1,511.3 61,799.5 | |||
: 8. Unit Peserve Shutdown Hours .; | |||
: 9. Gross Thermal Energy Generated (MWH) 318.321 5,109,327 204.137,804 | |||
: 10. Gross Electrical Energy Generated (MWH) 104,350 1,672,060 68,092,840 | |||
: 11. Not Electrical Energy , | |||
Generated (MWH) . 91,760 1,593,593 64,904,038 | |||
, 12. Reactor Service Factor 12.8' 70.0 83.9 i i | |||
: 13. Reactor Availability Factor 12.8 70.0 83.9 1 | |||
: 14. Unit Service Factor 12.8 70.0 82.8' U | |||
. 15. Unit Availability Factor 12.8 70.0 82.8 i | |||
: 16. Unit Capacity Factor (using MDC) 11.5 68.7 80.9 | |||
: 17. Unit Capacity Factor (Using DER) 11.2 66.9 78.7 | |||
: 18. Unit Forced Outage Rate 3.4 | |||
b-4 OPERATING DATA REPORT DOCKET NUMBER: 50-382 UNIT NAME: WATERFORD 3 DATE OF REPORT: APRIL,1994 COMPLETED BY: T.S. BECKER | |||
. TELEPHONE: 504-739-6683 OPERATING DATA REPORT (Can't) | |||
: 19. Shutdowns Scheduled over next 6 Months (type, date and duration of each): | |||
: 20. If Shutdown at end of report period, estimated date of startup: April 18,1994 | |||
: 21. Unit in Commercial Operation THIS MONTH YR TO DATE CUMULATIVE | |||
: 22. Hours in Reporting Period 743.0 2159.0 74,664.0 | |||
: 23. Unit Forced Outage Hours 0.0 00 2,178.7 | |||
: 24. Nameplate Rating (Gross MWe): 1200 | |||
: 25. If Changes Occur in Capacity Ratings (items Number 2 and 24) Since Last Report, Give Reasons: N/A I | |||
i.. | |||
.., ..;?, | |||
AVERAGE DAILY UNIT POWER LEVEL DOCKET NUMBER: 50-382 UNIT NAME: WATERFORD 3 DATE OF REPORT: APRIL,1994 COMPLETED BY: . T.S. BECKER TELEPHONE: 504-739-6683 MONTH JAARCH.1994 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-NET) (MWe-NET) 1 1055 17 (6) 1 2 1053 18 (5) 3 1054 19 (5) ' | |||
4 980 20 (11) 5 (36) 21 (9) 6 (21) 22 (8) 7 (22) 23 (9) l 8 (14) 24 (12) 9 (14) 25 (12) 10 (12) 26 (12) 11 (13) 27 (12) -l 12 (13) 28 (6) 13 (12) 29 _ 8) | |||
( | |||
14 J13) 30 (10) 15 (11) 31 (9) l 16 (6) | |||
-l INSTRUCTIONS On this format, list the average daily unit power level in MWts-Net fcr each day in the reporting month. | |||
Compute to the nearest whole megawatt. | |||
4 g - 'g UNIT SHUTDOWNS AND POWER REDUCTIONS . . | |||
DOCKET NUMBER- 50-382 , | |||
UNIT NAME- WATERFORD 3 DATE OF REPORT: APRIL,1994 - | |||
COMPLETED BY: T.S. BECKER - | |||
TELEPHONE- 504-739-6683 REPORT FOR MARCH.1994 Type Method of Shutting F = Forced Duration Down the Reactor or- Cause. Comments and Number Data S = Schedufed (Hours) Reason (1) Reducino Power (2) Corrective Actions 94-01 940304 S 647.7 C 2 Unit removed from service to begin Refuel Outage 6. | |||
(1) REASON . | |||
(2) METHOD A= Equipment Failure (explain) 1= Manual B= Maintenance or Test 2= Manual Scram C= Refueling 3= Automatic Scram D= Regulatory Restriction - 4= Continuation from Previous Period E= Operator Training and 5= Power Reduction License Examination 6= Other(explain) | |||
F= Administrative G= Operational Enor (explain) | |||
H= Other(explain) l l | |||
_ _ _ _ _ _ _ _ _ _ m __ __ _ _ .m. ~ . * . _ ___________m~ - -}} |
Latest revision as of 08:18, 6 January 2021
ML20065H686 | |
Person / Time | |
---|---|
Site: | Waterford |
Issue date: | 03/31/1994 |
From: | Becker T, Burski R ENTERGY OPERATIONS, INC. |
To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
References | |
W3F1-94-0045, W3F1-94-45, NUDOCS 9404150114 | |
Download: ML20065H686 (7) | |
Text
y ,
~
7ep;! *
- 9 Pr~'ENTERGY E75 *"" "" '"
kena L A N0(C ~ '
Te4 504 739 6774-R. F. Burski tauxe.
UkJ Yif ?Ob?f wwwa :
W3F1-94-0045 A4.05 PR April 13, 1994 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 9
Subject:
Waterford 3 SES Docket No. 50-382 License No. NPF-38 Monthly Operating Report a
Gentlemen:
- Attached is.the subject monthly report which covers the operating ;;
statistics for the month of March,1994. This report is' submitted per Section 6.9.1.6 of the Waterford 3 Technical Specifications-for Facility '
Operating License No. NPF-38. O t.
Very truly yours, -
R.F. Burski
-Director Nuclear Safety ;
RF8/CJT/ssf
. Attachment ,
cc: L.'J.. Callan, (NRC Region IV), R.B. Mc'Gehee, ,
N.S. Reynolds, F. Yost-(Utility Data Institute, Inc;), ;
J.T..Wheelock (INP0 Records Center),'NRC Resident:
Inspectors Office '7'l +1
'9404150114 940331- -- 2 -
p eq DR. ADOCK'0500 quvuyg V -
- - . ~ _. . ,
- .. r 4
NRC MONTHLY OPERATING REPORT
SUMMARY
OF OPERATIONS WATERFORD 3 MARCH 1994 The unit operated at an average reactor power of 12.6% and shutdown for Refuel Outage 6 during the period.
L .. -i_. .
,; 2.-
PRESSURIZER SAFETY VALVE FAILURES AND CHALLENGES WATERFORD 3 During the month of March 1994, there were no pressurizer safety valve failures or challenges, I
1.
L:
g
c., .
.y
')
OPERATING DATA REPORT .l
. o DOCKET NUMBER: 50-382 UNIT NAME: WATERFORD 3 DATE OF REPORT: APRIL,1994 COMPLETED BY: T.S. BECKER TELEPHONE: 504-7394683 OPERATING SIATUS
- 1. Reporting Period: March,1994 Gross Hours in Reporting Pericc. .Z43_
- 2. Currently Authorized Power Level (MWt): 3390 Maximum Dependable Capacity (Net MWe): 1075 Design Electrical Rating (Net MWe): 1104 1
- 3. Power Level to which Restricted (if any) (Net MWe): N/A C
- 4. Reasons for Restriction (if any): N/A
- l THIS MONTH YR TO DATE CUMULATIVE 5, Number of Hours Reactor was Critical 95.4 1,511.4 62,611.4 3
- 6. Reactor Reserve Shutdown Hours - .
- 7. Hours Generator was On-line 95.3 1,511.3 61,799.5
- 8. Unit Peserve Shutdown Hours .;
- 9. Gross Thermal Energy Generated (MWH) 318.321 5,109,327 204.137,804
- 10. Gross Electrical Energy Generated (MWH) 104,350 1,672,060 68,092,840
- 11. Not Electrical Energy ,
Generated (MWH) . 91,760 1,593,593 64,904,038
, 12. Reactor Service Factor 12.8' 70.0 83.9 i i
- 13. Reactor Availability Factor 12.8 70.0 83.9 1
- 14. Unit Service Factor 12.8 70.0 82.8' U
. 15. Unit Availability Factor 12.8 70.0 82.8 i
- 16. Unit Capacity Factor (using MDC) 11.5 68.7 80.9
- 17. Unit Capacity Factor (Using DER) 11.2 66.9 78.7
- 18. Unit Forced Outage Rate 3.4
b-4 OPERATING DATA REPORT DOCKET NUMBER: 50-382 UNIT NAME: WATERFORD 3 DATE OF REPORT: APRIL,1994 COMPLETED BY: T.S. BECKER
. TELEPHONE: 504-739-6683 OPERATING DATA REPORT (Can't)
- 19. Shutdowns Scheduled over next 6 Months (type, date and duration of each):
- 20. If Shutdown at end of report period, estimated date of startup: April 18,1994
- 21. Unit in Commercial Operation THIS MONTH YR TO DATE CUMULATIVE
- 22. Hours in Reporting Period 743.0 2159.0 74,664.0
- 23. Unit Forced Outage Hours 0.0 00 2,178.7
- 24. Nameplate Rating (Gross MWe): 1200
- 25. If Changes Occur in Capacity Ratings (items Number 2 and 24) Since Last Report, Give Reasons: N/A I
i..
.., ..;?,
AVERAGE DAILY UNIT POWER LEVEL DOCKET NUMBER: 50-382 UNIT NAME: WATERFORD 3 DATE OF REPORT: APRIL,1994 COMPLETED BY: . T.S. BECKER TELEPHONE: 504-739-6683 MONTH JAARCH.1994 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-NET) (MWe-NET) 1 1055 17 (6) 1 2 1053 18 (5) 3 1054 19 (5) '
4 980 20 (11) 5 (36) 21 (9) 6 (21) 22 (8) 7 (22) 23 (9) l 8 (14) 24 (12) 9 (14) 25 (12) 10 (12) 26 (12) 11 (13) 27 (12) -l 12 (13) 28 (6) 13 (12) 29 _ 8)
(
14 J13) 30 (10) 15 (11) 31 (9) l 16 (6)
-l INSTRUCTIONS On this format, list the average daily unit power level in MWts-Net fcr each day in the reporting month.
Compute to the nearest whole megawatt.
4 g - 'g UNIT SHUTDOWNS AND POWER REDUCTIONS . .
DOCKET NUMBER- 50-382 ,
UNIT NAME- WATERFORD 3 DATE OF REPORT: APRIL,1994 -
COMPLETED BY: T.S. BECKER -
TELEPHONE- 504-739-6683 REPORT FOR MARCH.1994 Type Method of Shutting F = Forced Duration Down the Reactor or- Cause. Comments and Number Data S = Schedufed (Hours) Reason (1) Reducino Power (2) Corrective Actions 94-01 940304 S 647.7 C 2 Unit removed from service to begin Refuel Outage 6.
(1) REASON .
(2) METHOD A= Equipment Failure (explain) 1= Manual B= Maintenance or Test 2= Manual Scram C= Refueling 3= Automatic Scram D= Regulatory Restriction - 4= Continuation from Previous Period E= Operator Training and 5= Power Reduction License Examination 6= Other(explain)
F= Administrative G= Operational Enor (explain)
H= Other(explain) l l
_ _ _ _ _ _ _ _ _ _ m __ __ _ _ .m. ~ . * . _ ___________m~ - -