Text
y
~
7ep;! *
- 9 Pr~'ENTERGY E75 *"" "" '"
kena L A N0(C ~
Te4 504 739 6774-R. F. Burski tauxe.
UkJ Yif ?Ob?f wwwa W3F1-94-0045 A4.05 PR April 13, 1994 U.S. Nuclear Regulatory Commission ATTN:
Document Control Desk Washington, D.C. 20555 9
Subject:
Waterford 3 SES Docket No. 50-382 License No. NPF-38 Monthly Operating Report a
Gentlemen:
Attached is.the subject monthly report which covers the operating statistics for the month of March,1994. This report is' submitted per Section 6.9.1.6 of the Waterford 3 Technical Specifications-for Facility Operating License No. NPF-38.
O Very truly yours, t.
R.F. Burski
-Director Nuclear Safety RF8/CJT/ssf
. Attachment L.'J.. Callan, (NRC Region IV), R.B. Mc'Gehee, cc:
N.S. Reynolds, F. Yost-(Utility Data Institute, Inc;),
J.T..Wheelock (INP0 Records Center),'NRC Resident:
Inspectors Office
'7'l
+1
'9404150114 940331- --
p eq DR. ADOCK'0500 2
V quvuyg
~
r 4
NRC MONTHLY OPERATING REPORT
SUMMARY
OF OPERATIONS WATERFORD 3 MARCH 1994 The unit operated at an average reactor power of 12.6% and shutdown for Refuel Outage 6 during the period.
L..
-i..
2.-
PRESSURIZER SAFETY VALVE FAILURES AND CHALLENGES WATERFORD 3 During the month of March 1994, there were no pressurizer safety valve failures or challenges, I
1.
L:
g
.y c.,
')
OPERATING DATA REPORT
.l o
DOCKET NUMBER: 50-382 UNIT NAME: WATERFORD 3 DATE OF REPORT: APRIL,1994 COMPLETED BY:
T.S. BECKER TELEPHONE: 504-7394683 OPERATING SIATUS 1.
Reporting Period: March,1994 Gross Hours in Reporting Pericc..Z43_
2.
Currently Authorized Power Level (MWt): 3390 Maximum Dependable Capacity (Net MWe): 1075 Design Electrical Rating (Net MWe): 1104 1
3.
Power Level to which Restricted (if any) (Net MWe): N/A C
4.
Reasons for Restriction (if any): N/A
- l THIS MONTH YR TO DATE CUMULATIVE 5,
Number of Hours Reactor was Critical 95.4 1,511.4 62,611.4 3
6.
Reactor Reserve Shutdown Hours -.
7.
Hours Generator was On-line 95.3 1,511.3 61,799.5 8.
Unit Peserve Shutdown Hours.;
9.
Gross Thermal Energy Generated (MWH) 318.321 5,109,327 204.137,804
- 10. Gross Electrical Energy Generated (MWH) 104,350 1,672,060 68,092,840
- 11. Not Electrical Energy Generated (MWH).
91,760 1,593,593 64,904,038
- 12. Reactor Service Factor 12.8' 70.0 83.9 i
i
- 13. Reactor Availability Factor 12.8 70.0 83.9 1
- 14. Unit Service Factor 12.8 70.0 82.8' U
- 15. Unit Availability Factor 12.8 70.0 82.8 i
- 16. Unit Capacity Factor (using MDC) 11.5 68.7 80.9
- 17. Unit Capacity Factor (Using DER) 11.2 66.9 78.7
- 18. Unit Forced Outage Rate 3.4
b-4 OPERATING DATA REPORT DOCKET NUMBER: 50-382 UNIT NAME: WATERFORD 3 DATE OF REPORT: APRIL,1994 COMPLETED BY:
T.S. BECKER
. TELEPHONE: 504-739-6683 OPERATING DATA REPORT (Can't) 19.
Shutdowns Scheduled over next 6 Months (type, date and duration of each):
20.
If Shutdown at end of report period, estimated date of startup: April 18,1994 21.
Unit in Commercial Operation THIS MONTH YR TO DATE CUMULATIVE
- 22. Hours in Reporting Period 743.0 2159.0 74,664.0
- 23. Unit Forced Outage Hours 0.0 00 2,178.7 24.
Nameplate Rating (Gross MWe): 1200 25.
If Changes Occur in Capacity Ratings (items Number 2 and 24) Since Last Report, Give Reasons: N/A I
i..
..;?,
AVERAGE DAILY UNIT POWER LEVEL DOCKET NUMBER: 50-382 UNIT NAME: WATERFORD 3 DATE OF REPORT: APRIL,1994 COMPLETED BY:. T.S. BECKER TELEPHONE: 504-739-6683 MONTH JAARCH.1994 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-NET)
(MWe-NET) 1 1055 17 (6) 2 1053 18 (5) 3 1054 19 (5) 4 980 20 (11) 5 (36) 21 (9) 6 (21) 22 (8) 7 (22) 23 (9) 8 (14) 24 (12) 9 (14) 25 (12) 10 (12) 26 (12) 11 (13) 27 (12)
-l 12 (13) 28 (6) 13 (12) 29
_ 8)
(
14 J13) 30 (10) 15 (11) 31 (9) 16 (6)
INSTRUCTIONS On this format, list the average daily unit power level in MWts-Net fcr each day in the reporting month.
Compute to the nearest whole megawatt.
4 g -
'g UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NUMBER-50-382 UNIT NAME-WATERFORD 3 DATE OF REPORT: APRIL,1994 COMPLETED BY:
T.S. BECKER TELEPHONE-504-739-6683 REPORT FOR MARCH.1994 Type Method of Shutting F = Forced Duration Down the Reactor or-Cause. Comments and Number Data S = Schedufed (Hours)
Reason (1)
Reducino Power (2)
Corrective Actions 94-01 940304 S
647.7 C
2 Unit removed from service to begin Refuel Outage 6.
(1) REASON (2) METHOD A=
Equipment Failure (explain) 1=
Manual B=
Maintenance or Test 2=
Manual Scram C=
Refueling 3=
Regulatory Restriction -
4=
Continuation from Previous Period E=
Operator Training and 5=
Power Reduction License Examination 6=
Other(explain)
F=
Administrative G=
Operational Enor (explain)
H=
Other(explain) l l
m
.m.
~
m~ - -