{{#Wiki_filter:ACCELERAT DOCVMENT DISTRmUTION SYSTEM REGULAT Y INFORMATION DISTRIBUTIO YSTEM (RIDS)ACCESSION NBR:9304220346 DOC.DATE: 93/03/31 NOTARIZED:
{{#Wiki_filter:ACCELERAT                     DOCVMENT DISTRmUTION SYSTEM REGULAT       Y INFORMATION DISTRIBUTIO           YSTEM (RIDS)
NO DOCKET FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 05000250 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 AUTH.NAME AUTHOR AFFILIATION HERBENICK,G.
ACCESSION NBR:9304220346                 DOC.DATE: 93/03/31       NOTARIZED: NO           DOCKET FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light                     C 05000250 50-251 Turkey Point Plant, Unit 4, Florida Power and Light                     C 05000251 AUTH. NAME           AUTHOR AFFILIATION HERBENICK,G.
Florida Power!'ight Co.PLUNKETT,T.F.
PLUNKETT,T.F.
Florida Power&Light Co.RECIP.NAME RECIPIENT AFFILIATION
Florida Florida Power    !'ight Power & Light Co.
Co.
RECIP.NAME           RECIPIENT AFFILIATION


==SUBJECT:==
==SUBJECT:==
Monthl'y operating repts for Mar 1993 for Turkey Point Units 3 a 4,per guidance of NUREG-0020.W/930413 ltr.DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE:.TITLE: Monthly Operating Report (per Tech Specs)NOTES: D RECIPIENT ID CODE/NAME PD2-2 LA RAGHAVAN,L INTERNAL: AEOD/DOA RR/DORP/OEAB EG FILE 01 EXTERNAL: EGSrG BRYCEiJ.H NSIC COPIES LTTR ENCL 3 3 1 1 1 1 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME PD2-2 PD AEOD/DSP/TPAB NRR/DRIL/RPEB RGN2 NRC PDR COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 1 D D D NOTE TO ALL"RIDS" RECIPIENTS:
Monthl'y     operating repts for Mar 1993 for Turkey Point Units                       D 3 a   4,per guidance of NUREG-0020.W/930413 ltr.
PLEASE HELP US fO REDUCE WASTE!CONTACT TIIE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT.504-2065)TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!TOTAL NUMBER OF COPIES REQUIRED: LTTR 14 ENCL 14 0'
DISTRIBUTION CODE: IE24D             COPIES RECEIVED:LTR         ENCL       SIZE:
fe'P.O.Box 029100, Miami, FL, 33102-9100 APR 1 8t993 L-93-94 10 CFR 50.36 U.S.Nuclear Regulatory Commission Attn: Document Control Desk Washington, DE C.20555 Gentlemen:
  .TITLE: Monthly Operating Report (per Tech Specs)
RE: Turkey Point Units 3 and 4 Docket Nos.50-250 and 50-251 Monthl 0 eratin Re ort In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of NUREG-0020, attached are the March 1993 Operating Status and Summary of Operating Experience Reports for Turkey Point Units 3 and 4.T.F.Plunkett Vice President Turkey'oint Nuclear TFP/GDH/gh attachments cc: Stewart D.Ebneter, Regional Administrator, Region II, USNRC Ross CD Butcher, Senior Resident Inspector, USNRC, Turkey Point Plant'9304220346 930331 PDR ADOCK 05000250 R PDR an FPL Group company  
NOTES:
)Ql)(>5,'8 AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.UNIT DATE COMPLETED BY TELEPHONE 50-250 TURKEY POINT¹3 APRIL 08 1993 G.HERBENICK 305-246-7112 MONTH MARCH 1993 AVERAGE DAILY POWER LEVEL (MWe-Net)03/01/93 03/02/93 03/03/93 03/04/93 03/05/93 03/06/93 03/07/93 03/08/93 03/09/93 03/1 0/93 03/1 1/93 03/1 2/93 03/1 3/93 03/1 4/93 03/1 5/93 03/1 6/93 03/17/93 03/1 8/93 03/1 9/93 03/20/93 03/21/93 03/22/93 03/23/93 03/24/93 03/25/93 03/26/93 03/27/93 03/28/93 03/29/93 03/30/93 03/31/93 699 696 692 691 544 378 378 642 688 689 684 681 689 704 707 706 701 386 687 699 697 693 695 652 689 690 689 688 691 687 685 I p.N~"i OPERATING STATUS OPERATING DATA REPORT DOCKET NO 50-250 DATE 4/8/93 COMPLETED BY G.D.Herbonhck TELEPHONE 305/246-7112 1.UNIT NAME: TURKEY POINT UNIT 3 2.REPORTING PERIOD: MARCH 1993 3.LICENSED THERMAL POWER (MWT): 2200 4.NAMEPLATE RATING (GROSS MWE): 760 5.DESIGN ELECTRICAL RATING (NET MWE): 693 6.MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 699 7.MAXIMUM DEPENDABLE CAPACITY (NET MWE): 666 8.IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)SINCE LAST REPORT, GIVE REASONS: 9.POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE)10.REASONS FOR RESTRICTIONS, IF ANY: MONTHLY-YTD-CUMULATIVE 11.HOURS IN REPORT PERIOD: 12.NUMBER OF HOURS REACTOR WAS CRITICAL 13.REACTOR RESERVE SHUTDOWN HOURS 14.HOURS GENERATOR ON-LINE 15.UNIT RESERVE SHUTDOWN HOURS 16.GROSS THERMAL ENERGY GENERATED (MWH)17.GROSS ELECTRICAL ENERGY GENERATED (MWH)18.NET ELECTRICAL ENERGY GENERATED (MWH)19.UNIT SERVICE FACTOR 20.UNIT AVAILABILITY FACTOR 21.CAPACITY FACTOR (USING MDC NET)22.CAPACITY FACTOR (USING DER NET)23.UNIT FORCED OUTAGE RATE 24.SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS NO SHUTDOWNS ARE SCHEDULED FOR UNIT 3.744 744.0 0.0 744.0 0.0 1557074 511385 487162 100.0 100.0 98.3 94.5 0.0 2160 2043.9 0.0 2007.5 0.0 4305713 1419340 1351108 92.9 92.9 93.9 90.3 7.1 178137.6 114803.2 844.4 113118.3 121.8 234212640 75061466 70963268 63.5 63.6 60.9 57.5 12.4 25.IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
RECIPIENT              COPIES              RECIPIENT           COPIES ID CODE/NAME           LTTR ENCL          ID  CODE/NAME      LTTR ENCL            D PD2-2 LA                     3      3      PD2-2 PD                1    1 RAGHAVAN,L                   1      1 INTERNAL: AEOD/DOA                         1      1      AEOD/DSP/TPAB            1    1 RR/DORP/OEAB                 1      1      NRR/DRIL/RPEB            1    1 EG   FILE         01        1      1      RGN2                    1    1 EXTERNAL:   EGSrG BRYCEiJ.H             1     1     NRC PDR                 1   1 NSIC                          1     1 D
4 UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.50-250 UNIT NAME: TURKEY POINT UNIT 3 DATE: APRIL 08 1993 COMPLETED BY: G.D.HERBENICK TELEPHONE:
D NOTE TO ALL"RIDS" RECIPIENTS:
305 246-7112 REPORT MONTH MARCH 1993 No Date Duration (Hours)Reason*Method of Shutting Down Reactor'icensee Event Ropoztf Syston Code'onponent Code'ause C Corrective Action to Prevent Recurrence 05 06 930305 930318 0.00 0.00 N/A N/A HH HC POMP XX HTEXCH 38 STEAM GENERATOR FEEDWATER PVMP WATERBOX CLEANING F-Forced s-scheduled Reason A-Equipment Failure 8-Maintenance or Test C-Refueling D-Regulatory restriction E-Operator Training s License Exanination F-Administrative G-Opozational Error (Explain)H-Other (Explain)Method 1-Manual 2-Manual Scran 3-Auto.wtic Sczan 4-Continued 5-Load Reduction 9-Other (Explain)Exhibit G-Instructions for Pzeparation of Data Entry Sheets Licensee Event Report (LER)File (NUREG-0161)
PLEASE HELP US fO REDUCE WASTE! CONTACT TIIE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 504-2065) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
Exhibit 1-sano Source
TOTAL NUMBER OF COPIES REQUIRED: LTTR                 14   ENCL   14
 
0
'
 
fe
'
P.O. Box 029100, Miami, FL, 33102-9100 APR 1 8t993 L-93-94 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington,       DE   C.         20555 Gentlemen:
RE:   Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Monthl 0 eratin Re ort In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of NUREG-0020, attached are the March 1993 Operating Status and Summary of Operating Experience Reports for Turkey Point Units 3 and 4.
T. F. Plunkett Vice President Turkey'oint Nuclear TFP/GDH/gh attachments cc:     Stewart D. Ebneter, Regional Administrator, Region II, USNRC Ross   CD Butcher,           Senior Resident Inspector, USNRC, Turkey Point Plant
          '9304220346 930331 PDR   ADOCK 05000250 R                         PDR an FPL Group company
 
) Ql) (>5,'8 AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-250 UNIT          TURKEY POINT ¹3 DATE          APRIL 08 1993 COMPLETED BY  G. HERBENICK TELEPHONE    305-246-7112 MONTH MARCH 1993 AVERAGE DAILY POWER LEVEL (MWe-Net) 03/01/93   699 03/02/93   696 03/03/93   692 03/04/93   691 03/05/93   544 03/06/93   378 03/07/93   378 03/08/93   642 03/09/93   688 03/1 0/93 689 03/1 1/93 684 03/1 2/93 681 03/1 3/93 689 03/1 4/93 704 03/1 5/93 707 03/1 6/93 706 03/17/93   701 03/1 8/93 386 03/1 9/93 687 03/20/93   699 03/21/93   697 03/22/93   693 03/23/93   695 03/24/93   652 03/25/93   689 03/26/93   690 03/27/93   689 03/28/93   688 03/29/93   691 03/30/93   687 03/31/93   685
 
I
: p. N
    ~ "i
 
OPERATING DATA REPORT DOCKET NO           50 250 DATE                 4/ 8/93 COMPLETED BY G. D. Herbonhck TELEPHONE       305/246-7112 OPERATING STATUS
: 1. UNIT NAME: TURKEY POINT     UNIT 3
: 2. REPORTING PERIOD:     MARCH 1993
: 3. LICENSED THERMAL POWER (MWT):                   2200
: 4. NAMEPLATE RATING (GROSS MWE):                   760
: 5. DESIGN ELECTRICAL RATING (NET MWE):             693
: 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE):         699
: 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE):           666
: 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH       7)
SINCE LAST REPORT, GIVE REASONS:
: 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE)
: 10. REASONS   FOR RESTRICTIONS, IF ANY:
MONTHLY     -YTD- CUMULATIVE
: 11. HOURS IN REPORT PERIOD:                          744        2160          178137. 6
: 12. NUMBER OF HOURS REACTOR WAS CRITICAL             744.0      2043.9        114803.2
: 13. REACTOR RESERVE SHUTDOWN HOURS                     0.0        0.0          844.4
: 14. HOURS GENERATOR ON-LINE                         744.0      2007.5        113118.3
: 15. UNIT RESERVE SHUTDOWN HOURS                         0.0        0.0          121.8
: 16. GROSS THERMAL ENERGY GENERATED (MWH)           1557074    4305713      234212640
: 17. GROSS ELECTRICAL ENERGY GENERATED (MWH)         511385    1419340      75061466
: 18. NET ELECTRICAL ENERGY GENERATED (MWH)           487162    1351108      70963268
: 19. UNIT SERVICE FACTOR                               100.0      92.9            63.5
: 20. UNIT AVAILABILITYFACTOR                          100.0      92.9            63.6
: 21. CAPACITY FACTOR (USING MDC NET)                   98.3      93.9            60.9
: 22. CAPACITY FACTOR (USING DER NET)                   94.5      90.3            57.5
: 23. UNIT FORCED OUTAGE RATE                             0.0        7.1          12.4
: 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS NO SHUTDOWNS ARE SCHEDULED FOR UNIT 3.
: 25. IF   SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
 
4 UNIT   SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.               50-250 UNIT NAME:               TURKEY POINT UNIT 3 DATE:                   APRIL 08         1993 COMPLETED BY: G. D. HERBENICK TELEPHONE:                 305     246-7112 REPORT MONTH MARCH 1993 No     Date   Duration (Hours)
Reason* Method of Shutting   Event Reactor'icensee Down    Ropoztf Syston   Code'ause Code'onponent                          C Corrective Action to Prevent Recurrence 05       930305   0.00                             N/A       HH     POMP XX     38 STEAM GENERATOR FEEDWATER   PVMP 06      930318  0.00                              N/A        HC    HTEXCH      WATERBOX CLEANING F Forced
  -                   Reason
                        - Equipment Failure       Method
                                                    -                         Exhibit  G  Instructions        Exhibit 1 - sano Source s   scheduled        A                            1   Manual                 for Pzeparation of  Data 8  Maintenance or Test      2 - Manual Scran           Entry Sheets Licensee C - Refueling                3 Auto.wtic Sczan         Event Report (LER)  File D  Regulatory restriction  4 - Continued               (NUREG-0161)
E  Operator Training s      5 Load Reduction License Exanination    9 Other (Explain)
F  Administrative G Opozational Error (Explain)
H  Other (Explain)


==SUMMARY==
==SUMMARY==
OF OPERATING EXPERIENCE DOCKET NO.50-250 UNIT Turke Point 3 DATE A ril 08 1993 COMPLETED BY:G.D.Herbenick TELEPHONE:
OF OPERATING EXPERIENCE DOCKET NO. 50-250 UNIT Turke Point 3 DATE A ril 08 1993 COMPLETED BY:G. D. Herbenick TELEPHONE:   305 246-7112 REPORT MONTH March 1993 On March 5, Unit 3 commenced load reduction to     55% power to repair the 3B Steam Generator Feedwater Pump.
305 246-7112 REPORT MONTH March 1993 On March 5, Unit 3 commenced load reduction to 55%power to repair the 3B Steam Generator Feedwater Pump.On March 8, Unit 3 increased reactor power to 100%.On March 18, Unit 3 commenced load reduction to 40%power for Main Turbine valve testing and condenser waterbox cleaning.On March 19, Unit 3 increased reactor power to 100%.Unit 3 essentially maintained 100%power for the remainder of the month.
On March 8, Unit   3   increased reactor power to 100%.
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.UNIT DATE COMPLETED BY TELEPHONE 50-251 TURKEY POINT¹4 APRIL 08 1993 G.HERBENICK 305-246-7112 MONTH MARCH 1993 AVERAGE DAILY POWER LEVEL (MWe-Net)03/01/93 03/02/93 03/03/93 03/04/93 03/05/93 03/06/93 03/07/93 03/08/93 03/09/93 03/1 0/93 03/1 1/92 03/1 2/93 03/1 3/93 03/1 4/93 03/1 5/93 03/1 6/93 03/1 7/93 03/1 8/93 03/1 9/93 03/20/93 03/21/93 03/22/93 03/23/93 03/24/93 03/25/93 03/26/93 03/27/93 03/28/93 03/29/93 03/30/93 03/31/93 691 690 688 686 687 686 684 684 688 686 680 678 683 698 702 700 694 688 684 683 679 676 680 677 674 674 674 672 677 678 674  
On March 18, Unit 3 commenced load reduction to 40% power for Main Turbine valve testing and condenser waterbox cleaning.
On March 19, Unit   3 increased reactor power to   100%.
Unit 3 essentially maintained     100% power for the remainder of the month.
 
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-251 UNIT          TURKEY POINT ¹4 DATE          APRIL 08 1993 COMPLETED BY  G. HERBENICK TELEPHONE    305-246-7112 MONTH MARCH 1993 AVERAGE DAILY POWER LEVEL (MWe-Net) 03/01/93   691 03/02/93   690 03/03/93   688 03/04/93   686 03/05/93   687 03/06/93   686 03/07/93   684 03/08/93   684 03/09/93   688 03/1 0/93 686 03/1 1/92 680 03/1 2/93 678 03/1 3/93 683 03/1 4/93 698 03/1 5/93 702 03/1 6/93 700 03/1 7/93 694 03/1 8/93 688 03/1 9/93 684 03/20/93   683 03/21/93   679 03/22/93   676 03/23/93   680 03/24/93   677 03/25/93   674 03/26/93   674 03/27/93   674 03/28/93   672 03/29/93   677 03/30/93   678 03/31/93   674
 
'
'
OPERATING STATUS OPERATING DATA REPORT DOCKET NO 50-25I DATE 4/8/93 COMPLETED BY G.D.Herbenick TELEPHONE 305/246-7112 1.UNIT NAME: TURKEY POINT UNIT 4 2.REPORTING PERIOD: MARCH 1993 3.LICENSED THERMAL POWER (MWT): 2200 4.NAMEPLATE RATING (GROSS MWE): 760 5.DESIGN ELECTRICAL RATING (NET'MWE): 693 6.MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 699 7.MAXIMUM DEPENDABLE CAPACITY (NET MWE): 666 8.IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)SINCE LAST REPORT, GIVE REASONS: 9.POWER LEVEL TO WHICH RESTRICTED
OPERATING DATA REPORT DOCKET NO           50 - 25I DATE                 4/ 8/93 COMPLETED BY G. D. Herbenick TELEPHONE       305/246-7112 OPERATING STATUS
~IF ANY (NET MWE)10.REASONS FOR RESTRICTIONS, IF ANY: MONTHLY-YTD-CUMULATIVE ll.HOURS IN REPORT PERIOD: 12.NUMBER OF HOURS REACTOR WAS CRITICAL 13.REACTOR RESERVE SHUTDOWN HOURS 14.HOURS GENERATOR ON-LINE I5.UNIT RESERVE SHUTDOWN HOURS 16.GROSS THERMAL ENERGY GENERATED (MWH)17.GROSS ELECTRICAL ENERGY GENERATED (MWH)18.NET ELECTRICAL ENERGY GENERATED (MWH)19.UNIT SERVICE FACTOR 20.UNIT AVAILABILITY FACTOR 2'I.CAPACITY FACTOR (USING MDC NET)22.CAPACITY FACTOR (USING DER NET)23.UNIT FORCED OUTAGE RATE 24.SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS UNIT 4 WILL BEGIN A REFUELING AND MAINTENA 744 744.0 0.0 744.0 0.0 1636770 533115 508628 100.0 100.0 102.6 98.6 00.0 171869.0 111998.6 166.6 108197.2 577.3 228267478 72885595 68945187 63.0 63.3 61.3 57.9 11.7 2160 2160.0 0.0 2151.9 0.0 4693143 1526625 1456246 99.6 99.6 101.2 97.3 0.4 NCE OUTAGE ON APRIL 10, 1993.25.IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
: 1. UNIT NAME: TURKEY POINT     UNIT 4
UNIT SHUTDOWNS AND POWER REDUCTZONS DOCKET NO.50-251 UNIT NAME'URKEY POINT UNIT 4 DATE: APRIL 08 1993 COMPLETED BY: G.D.HERBENICK TELEPHONE:
: 2. REPORTING PERIOD:     MARCH 1993
305 246-7112 REPORT MONTH MARCH 1993 No.N/A Date N/A Type N/A Duration (Hours)N/A Reasons N/A Nethod of Shutting Down Reactor'/A Licensee Event Reports N/A Systen Code'/A Component Codes N/A N/A cause s corrective Action to Prevent Recurrence F-Forced s-scheduled Reason A-Equipnent Failure B-Naintenance or Test C-Refueling D-Regulatory restriction E-Operator Training S License Exanination F-Administrative G-Operational Error (Explain)H-Other (Explain)Method 1-Ywnual 2-Nwnual Scran 3-Autcmatic Scrau 4-Continued 5-Load Reduction 9-Othez (Explain)Exhibit G-Instructions for Preparation of Data Entry Sheets Licensee Event Report (LER)File (NUREG-0161)
: 3. LICENSED THERMAL POWER (MWT):                   2200
Exhibit 1-Sa=e source (o~~l  
: 4. NAMEPLATE RATING (GROSS MWE):                   760
: 5. DESIGN ELECTRICAL RATING (NET 'MWE):             693
: 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE):         699
: 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE):           666
: 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER     3 THROUGH   7)
SINCE LAST REPORT, GIVE REASONS:
: 9. POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE)
                                      ~
: 10. REASONS   FOR RESTRICTIONS, IF ANY:
MONTHLY   -YTD- CUMULATIVE ll. HOURS IN REPORT PERIOD:                        744      2160        171869. 0
: 12. NUMBER OF HOURS   REACTOR WAS CRITICAL           744.0    2160. 0      111998. 6
: 13. REACTOR RESERVE SHUTDOWN HOURS                   0.0        0.0          166. 6
: 14. HOURS GENERATOR ON-LINE                       744.0    2151.9      108197. 2 I5. UNIT RESERVE SHUTDOWN HOURS                     0.0        0.0          577.3
: 16. GROSS THERMAL ENERGY GENERATED (MWH)         1636770    4693143    228267478
: 17. GROSS ELECTRICAL ENERGY GENERATED (MWH)       533115    1526625      72885595
: 18. NET ELECTRICAL ENERGY GENERATED (MWH)         508628    1456246      68945187
: 19. UNIT SERVICE FACTOR                           100.0      99.6            63.0
: 20. UNIT AVAILABILITYFACTOR                        100.0      99.6            63.3 2'I. CAPACITY FACTOR (USING MDC NET)               102.6      101. 2          61.3
: 22. CAPACITY FACTOR (USING DER NET)                 98.6      97.3            57.9
: 23. UNIT FORCED OUTAGE RATE                         00.0        0.4            11.7
: 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS UNIT 4 WILL BEGIN A REFUELING AND MAINTENANCE OUTAGE ON APRIL     10, 1993.
: 25. IF   SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
 
UNIT           SHUTDOWNS AND POWER REDUCTZONS DOCKET NO.               50-251 UNIT     NAME'URKEY POINT                       UNIT 4 DATE:                     APRIL 08 1993 COMPLETED BY: G.D. HERBENICK TELEPHONE:                 305 246-7112 REPORT MONTH MARCH 1993 No. Date Type Duration    Reasons    Nethod        of  Licensee    Systen        Component                  cause  s corrective (Hours)                Shutting            Event                      Codes                      Action to Down    Reports      Code'/A                               Prevent Recurrence Reactor'/A N/A     N/A N/A N/A         N/A                         N/A                         N/A           N/A F - Forced             Reason                                Method                              Exhibit  -  Instructions        Exhibit  -      source s scheduled           A Equipnent   Failure               1 - Ywnual G
for Preparation of  Data 1  Sa=e B - Naintenance or Test               2 - Nwnual Scran                    Entry Sheets Licensee C - Refueling                         3  Autcmatic      Scrau          Event Report (LER)  File D Regulatory   restriction         4 - Continued                      (NUREG-0161)
E Operator   Training S             5  Load Reduction License Exanination               9  Othez (Explain)
F - Administrative G Operational Error (Explain)
H - Other (Explain)
 
(o
  ~
      ~
l


==SUMMARY==
==SUMMARY==
OF OPERATING EXPERIENCE DOCKET NO.50-251 UNIT Turke Point 4 DATE A ril 08 1993 COMPLETED BY:G.D.Herbenick TELEPHONE:
OF OPERATING EXPERIENCE DOCKET NO. 50-251 UNIT Turke Point 4 DATE A rilBY:G.D.Herbenick COMPLETED 08 1993 TELEPHONE:   305   246-7112 REPORT MONTH March 1993 Unit 4 essentially maintained 100% power for the month of March.
305 246-7112 REPORT MONTH March 1993 Unit 4 essentially maintained 100%power for the month of March.
 
0 0~~~p~\it I'}}
0 0 ~ ~
            ~
              ~
                \
p it I'}}

Revision as of 07:45, 22 October 2019

Monthly Operating Repts for Mar 1993 for Turkey Point Units 3 & 4,per Guidance of NUREG-0020.W/930413 Ltr
ML17349A806
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 03/31/1993
From: Herbenick G, Plunkett T
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
RTR-NUREG-0020, RTR-NUREG-20 L-93-94, NUDOCS 9304220346
Download: ML17349A806 (17)


Text

ACCELERAT DOCVMENT DISTRmUTION SYSTEM REGULAT Y INFORMATION DISTRIBUTIO YSTEM (RIDS)

ACCESSION NBR:9304220346 DOC.DATE: 93/03/31 NOTARIZED: NO DOCKET FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 05000250 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 AUTH. NAME AUTHOR AFFILIATION HERBENICK,G.

PLUNKETT,T.F.

Florida Florida Power  !'ight Power & Light Co.

Co.

RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthl'y operating repts for Mar 1993 for Turkey Point Units D 3 a 4,per guidance of NUREG-0020.W/930413 ltr.

DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE:

.TITLE: Monthly Operating Report (per Tech Specs)

NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL D PD2-2 LA 3 3 PD2-2 PD 1 1 RAGHAVAN,L 1 1 INTERNAL: AEOD/DOA 1 1 AEOD/DSP/TPAB 1 1 RR/DORP/OEAB 1 1 NRR/DRIL/RPEB 1 1 EG FILE 01 1 1 RGN2 1 1 EXTERNAL: EGSrG BRYCEiJ.H 1 1 NRC PDR 1 1 NSIC 1 1 D

D NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US fO REDUCE WASTE! CONTACT TIIE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 504-2065) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 14 ENCL 14

0

'

fe

'

P.O. Box 029100, Miami, FL, 33102-9100 APR 1 8t993 L-93-94 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DE C. 20555 Gentlemen:

RE: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Monthl 0 eratin Re ort In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of NUREG-0020, attached are the March 1993 Operating Status and Summary of Operating Experience Reports for Turkey Point Units 3 and 4.

T. F. Plunkett Vice President Turkey'oint Nuclear TFP/GDH/gh attachments cc: Stewart D. Ebneter, Regional Administrator, Region II, USNRC Ross CD Butcher, Senior Resident Inspector, USNRC, Turkey Point Plant

'9304220346 930331 PDR ADOCK 05000250 R PDR an FPL Group company

) Ql) (>5,'8 AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-250 UNIT TURKEY POINT ¹3 DATE APRIL 08 1993 COMPLETED BY G. HERBENICK TELEPHONE 305-246-7112 MONTH MARCH 1993 AVERAGE DAILY POWER LEVEL (MWe-Net) 03/01/93 699 03/02/93 696 03/03/93 692 03/04/93 691 03/05/93 544 03/06/93 378 03/07/93 378 03/08/93 642 03/09/93 688 03/1 0/93 689 03/1 1/93 684 03/1 2/93 681 03/1 3/93 689 03/1 4/93 704 03/1 5/93 707 03/1 6/93 706 03/17/93 701 03/1 8/93 386 03/1 9/93 687 03/20/93 699 03/21/93 697 03/22/93 693 03/23/93 695 03/24/93 652 03/25/93 689 03/26/93 690 03/27/93 689 03/28/93 688 03/29/93 691 03/30/93 687 03/31/93 685

I

p. N

~ "i

OPERATING DATA REPORT DOCKET NO 50 250 DATE 4/ 8/93 COMPLETED BY G. D. Herbonhck TELEPHONE 305/246-7112 OPERATING STATUS

1. UNIT NAME: TURKEY POINT UNIT 3
2. REPORTING PERIOD: MARCH 1993
3. LICENSED THERMAL POWER (MWT): 2200
4. NAMEPLATE RATING (GROSS MWE): 760
5. DESIGN ELECTRICAL RATING (NET MWE): 693
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 699
7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 666
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)

SINCE LAST REPORT, GIVE REASONS:

9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE)
10. REASONS FOR RESTRICTIONS, IF ANY:

MONTHLY -YTD- CUMULATIVE

11. HOURS IN REPORT PERIOD: 744 2160 178137. 6
12. NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 2043.9 114803.2
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 844.4
14. HOURS GENERATOR ON-LINE 744.0 2007.5 113118.3
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 121.8
16. GROSS THERMAL ENERGY GENERATED (MWH) 1557074 4305713 234212640
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 511385 1419340 75061466
18. NET ELECTRICAL ENERGY GENERATED (MWH) 487162 1351108 70963268
19. UNIT SERVICE FACTOR 100.0 92.9 63.5
20. UNIT AVAILABILITYFACTOR 100.0 92.9 63.6
21. CAPACITY FACTOR (USING MDC NET) 98.3 93.9 60.9
22. CAPACITY FACTOR (USING DER NET) 94.5 90.3 57.5
23. UNIT FORCED OUTAGE RATE 0.0 7.1 12.4
24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS NO SHUTDOWNS ARE SCHEDULED FOR UNIT 3.
25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

4 UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-250 UNIT NAME: TURKEY POINT UNIT 3 DATE: APRIL 08 1993 COMPLETED BY: G. D. HERBENICK TELEPHONE: 305 246-7112 REPORT MONTH MARCH 1993 No Date Duration (Hours)

Reason* Method of Shutting Event Reactor'icensee Down Ropoztf Syston Code'ause Code'onponent C Corrective Action to Prevent Recurrence 05 930305 0.00 N/A HH POMP XX 38 STEAM GENERATOR FEEDWATER PVMP 06 930318 0.00 N/A HC HTEXCH WATERBOX CLEANING F Forced

- Reason

- Equipment Failure Method

- Exhibit G Instructions Exhibit 1 - sano Source s scheduled A 1 Manual for Pzeparation of Data 8 Maintenance or Test 2 - Manual Scran Entry Sheets Licensee C - Refueling 3 Auto.wtic Sczan Event Report (LER) File D Regulatory restriction 4 - Continued (NUREG-0161)

E Operator Training s 5 Load Reduction License Exanination 9 Other (Explain)

F Administrative G Opozational Error (Explain)

H Other (Explain)

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO. 50-250 UNIT Turke Point 3 DATE A ril 08 1993 COMPLETED BY:G. D. Herbenick TELEPHONE: 305 246-7112 REPORT MONTH March 1993 On March 5, Unit 3 commenced load reduction to 55% power to repair the 3B Steam Generator Feedwater Pump.

On March 8, Unit 3 increased reactor power to 100%.

On March 18, Unit 3 commenced load reduction to 40% power for Main Turbine valve testing and condenser waterbox cleaning.

On March 19, Unit 3 increased reactor power to 100%.

Unit 3 essentially maintained 100% power for the remainder of the month.

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-251 UNIT TURKEY POINT ¹4 DATE APRIL 08 1993 COMPLETED BY G. HERBENICK TELEPHONE 305-246-7112 MONTH MARCH 1993 AVERAGE DAILY POWER LEVEL (MWe-Net) 03/01/93 691 03/02/93 690 03/03/93 688 03/04/93 686 03/05/93 687 03/06/93 686 03/07/93 684 03/08/93 684 03/09/93 688 03/1 0/93 686 03/1 1/92 680 03/1 2/93 678 03/1 3/93 683 03/1 4/93 698 03/1 5/93 702 03/1 6/93 700 03/1 7/93 694 03/1 8/93 688 03/1 9/93 684 03/20/93 683 03/21/93 679 03/22/93 676 03/23/93 680 03/24/93 677 03/25/93 674 03/26/93 674 03/27/93 674 03/28/93 672 03/29/93 677 03/30/93 678 03/31/93 674

'

OPERATING DATA REPORT DOCKET NO 50 - 25I DATE 4/ 8/93 COMPLETED BY G. D. Herbenick TELEPHONE 305/246-7112 OPERATING STATUS

1. UNIT NAME: TURKEY POINT UNIT 4
2. REPORTING PERIOD: MARCH 1993
3. LICENSED THERMAL POWER (MWT): 2200
4. NAMEPLATE RATING (GROSS MWE): 760
5. DESIGN ELECTRICAL RATING (NET 'MWE): 693
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 699
7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 666
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)

SINCE LAST REPORT, GIVE REASONS:

9. POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE)

~

10. REASONS FOR RESTRICTIONS, IF ANY:

MONTHLY -YTD- CUMULATIVE ll. HOURS IN REPORT PERIOD: 744 2160 171869. 0

12. NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 2160. 0 111998. 6
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 166. 6
14. HOURS GENERATOR ON-LINE 744.0 2151.9 108197. 2 I5. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 577.3
16. GROSS THERMAL ENERGY GENERATED (MWH) 1636770 4693143 228267478
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 533115 1526625 72885595
18. NET ELECTRICAL ENERGY GENERATED (MWH) 508628 1456246 68945187
19. UNIT SERVICE FACTOR 100.0 99.6 63.0
20. UNIT AVAILABILITYFACTOR 100.0 99.6 63.3 2'I. CAPACITY FACTOR (USING MDC NET) 102.6 101. 2 61.3
22. CAPACITY FACTOR (USING DER NET) 98.6 97.3 57.9
23. UNIT FORCED OUTAGE RATE 00.0 0.4 11.7
24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS UNIT 4 WILL BEGIN A REFUELING AND MAINTENANCE OUTAGE ON APRIL 10, 1993.
25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

UNIT SHUTDOWNS AND POWER REDUCTZONS DOCKET NO. 50-251 UNIT NAME'URKEY POINT UNIT 4 DATE: APRIL 08 1993 COMPLETED BY: G.D. HERBENICK TELEPHONE: 305 246-7112 REPORT MONTH MARCH 1993 No. Date Type Duration Reasons Nethod of Licensee Systen Component cause s corrective (Hours) Shutting Event Codes Action to Down Reports Code'/A Prevent Recurrence Reactor'/A N/A N/A N/A N/A N/A N/A N/A N/A F - Forced Reason Method Exhibit - Instructions Exhibit - source s scheduled A Equipnent Failure 1 - Ywnual G

for Preparation of Data 1 Sa=e B - Naintenance or Test 2 - Nwnual Scran Entry Sheets Licensee C - Refueling 3 Autcmatic Scrau Event Report (LER) File D Regulatory restriction 4 - Continued (NUREG-0161)

E Operator Training S 5 Load Reduction License Exanination 9 Othez (Explain)

F - Administrative G Operational Error (Explain)

H - Other (Explain)

(o

~

~

l

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO. 50-251 UNIT Turke Point 4 DATE A rilBY:G.D.Herbenick COMPLETED 08 1993 TELEPHONE: 305 246-7112 REPORT MONTH March 1993 Unit 4 essentially maintained 100% power for the month of March.