ML17349A806: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter:ACCELERAT DOCVMENT DISTRmUTION SYSTEM REGULAT Y INFORMATION DISTRIBUTIO YSTEM (RIDS)ACCESSION NBR:9304220346 DOC.DATE: 93/03/31 NOTARIZED: | {{#Wiki_filter:ACCELERAT DOCVMENT DISTRmUTION SYSTEM REGULAT Y INFORMATION DISTRIBUTIO YSTEM (RIDS) | ||
NO DOCKET FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 05000250 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 AUTH.NAME AUTHOR AFFILIATION HERBENICK,G. | ACCESSION NBR:9304220346 DOC.DATE: 93/03/31 NOTARIZED: NO DOCKET FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 05000250 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 AUTH. NAME AUTHOR AFFILIATION HERBENICK,G. | ||
PLUNKETT,T.F. | |||
Florida Power&Light Co.RECIP.NAME RECIPIENT AFFILIATION | Florida Florida Power !'ight Power & Light Co. | ||
Co. | |||
RECIP.NAME RECIPIENT AFFILIATION | |||
==SUBJECT:== | ==SUBJECT:== | ||
Monthl'y operating repts for Mar 1993 for Turkey Point Units 3 a 4,per guidance of NUREG-0020.W/930413 ltr.DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE:.TITLE: Monthly Operating Report (per Tech Specs)NOTES: | Monthl'y operating repts for Mar 1993 for Turkey Point Units D 3 a 4,per guidance of NUREG-0020.W/930413 ltr. | ||
PLEASE HELP US fO REDUCE WASTE!CONTACT TIIE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT.504-2065)TO | DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE: | ||
fe'P.O.Box 029100, Miami, FL, 33102-9100 APR 1 8t993 L-93-94 10 CFR 50.36 U.S.Nuclear Regulatory Commission Attn: Document Control Desk Washington, DE C.20555 Gentlemen: | .TITLE: Monthly Operating Report (per Tech Specs) | ||
RE: Turkey Point Units 3 and 4 Docket Nos.50-250 and 50-251 Monthl 0 eratin Re ort In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of NUREG-0020, attached are the March 1993 Operating Status and Summary of Operating Experience Reports for Turkey Point Units 3 and 4.T.F.Plunkett Vice President Turkey'oint Nuclear TFP/GDH/gh attachments cc: Stewart D.Ebneter, Regional Administrator, Region II, USNRC Ross CD Butcher, Senior Resident Inspector, USNRC, Turkey Point Plant'9304220346 930331 PDR ADOCK 05000250 R PDR an FPL Group company | NOTES: | ||
)Ql)(>5,'8 AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. | RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL D PD2-2 LA 3 3 PD2-2 PD 1 1 RAGHAVAN,L 1 1 INTERNAL: AEOD/DOA 1 1 AEOD/DSP/TPAB 1 1 RR/DORP/OEAB 1 1 NRR/DRIL/RPEB 1 1 EG FILE 01 1 1 RGN2 1 1 EXTERNAL: EGSrG BRYCEiJ.H 1 1 NRC PDR 1 1 NSIC 1 1 D | ||
4 UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.50-250 UNIT NAME: TURKEY POINT UNIT 3 DATE: APRIL 08 1993 COMPLETED BY: G.D.HERBENICK TELEPHONE: | D NOTE TO ALL"RIDS" RECIPIENTS: | ||
305 246-7112 REPORT MONTH MARCH 1993 No Date Duration (Hours)Reason*Method of Shutting | PLEASE HELP US fO REDUCE WASTE! CONTACT TIIE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 504-2065) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED! | ||
TOTAL NUMBER OF COPIES REQUIRED: LTTR 14 ENCL 14 | |||
0 | |||
' | |||
fe | |||
' | |||
P.O. Box 029100, Miami, FL, 33102-9100 APR 1 8t993 L-93-94 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DE C. 20555 Gentlemen: | |||
RE: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Monthl 0 eratin Re ort In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of NUREG-0020, attached are the March 1993 Operating Status and Summary of Operating Experience Reports for Turkey Point Units 3 and 4. | |||
T. F. Plunkett Vice President Turkey'oint Nuclear TFP/GDH/gh attachments cc: Stewart D. Ebneter, Regional Administrator, Region II, USNRC Ross CD Butcher, Senior Resident Inspector, USNRC, Turkey Point Plant | |||
'9304220346 930331 PDR ADOCK 05000250 R PDR an FPL Group company | |||
) Ql) (>5,'8 AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-250 UNIT TURKEY POINT ¹3 DATE APRIL 08 1993 COMPLETED BY G. HERBENICK TELEPHONE 305-246-7112 MONTH MARCH 1993 AVERAGE DAILY POWER LEVEL (MWe-Net) 03/01/93 699 03/02/93 696 03/03/93 692 03/04/93 691 03/05/93 544 03/06/93 378 03/07/93 378 03/08/93 642 03/09/93 688 03/1 0/93 689 03/1 1/93 684 03/1 2/93 681 03/1 3/93 689 03/1 4/93 704 03/1 5/93 707 03/1 6/93 706 03/17/93 701 03/1 8/93 386 03/1 9/93 687 03/20/93 699 03/21/93 697 03/22/93 693 03/23/93 695 03/24/93 652 03/25/93 689 03/26/93 690 03/27/93 689 03/28/93 688 03/29/93 691 03/30/93 687 03/31/93 685 | |||
I | |||
: p. N | |||
~ "i | |||
OPERATING DATA REPORT DOCKET NO 50 250 DATE 4/ 8/93 COMPLETED BY G. D. Herbonhck TELEPHONE 305/246-7112 OPERATING STATUS | |||
: 1. UNIT NAME: TURKEY POINT UNIT 3 | |||
: 2. REPORTING PERIOD: MARCH 1993 | |||
: 3. LICENSED THERMAL POWER (MWT): 2200 | |||
: 4. NAMEPLATE RATING (GROSS MWE): 760 | |||
: 5. DESIGN ELECTRICAL RATING (NET MWE): 693 | |||
: 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 699 | |||
: 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 666 | |||
: 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) | |||
SINCE LAST REPORT, GIVE REASONS: | |||
: 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE) | |||
: 10. REASONS FOR RESTRICTIONS, IF ANY: | |||
MONTHLY -YTD- CUMULATIVE | |||
: 11. HOURS IN REPORT PERIOD: 744 2160 178137. 6 | |||
: 12. NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 2043.9 114803.2 | |||
: 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 844.4 | |||
: 14. HOURS GENERATOR ON-LINE 744.0 2007.5 113118.3 | |||
: 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 121.8 | |||
: 16. GROSS THERMAL ENERGY GENERATED (MWH) 1557074 4305713 234212640 | |||
: 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 511385 1419340 75061466 | |||
: 18. NET ELECTRICAL ENERGY GENERATED (MWH) 487162 1351108 70963268 | |||
: 19. UNIT SERVICE FACTOR 100.0 92.9 63.5 | |||
: 20. UNIT AVAILABILITYFACTOR 100.0 92.9 63.6 | |||
: 21. CAPACITY FACTOR (USING MDC NET) 98.3 93.9 60.9 | |||
: 22. CAPACITY FACTOR (USING DER NET) 94.5 90.3 57.5 | |||
: 23. UNIT FORCED OUTAGE RATE 0.0 7.1 12.4 | |||
: 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS NO SHUTDOWNS ARE SCHEDULED FOR UNIT 3. | |||
: 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: | |||
4 UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-250 UNIT NAME: TURKEY POINT UNIT 3 DATE: APRIL 08 1993 COMPLETED BY: G. D. HERBENICK TELEPHONE: 305 246-7112 REPORT MONTH MARCH 1993 No Date Duration (Hours) | |||
Reason* Method of Shutting Event Reactor'icensee Down Ropoztf Syston Code'ause Code'onponent C Corrective Action to Prevent Recurrence 05 930305 0.00 N/A HH POMP XX 38 STEAM GENERATOR FEEDWATER PVMP 06 930318 0.00 N/A HC HTEXCH WATERBOX CLEANING F Forced | |||
- Reason | |||
- Equipment Failure Method | |||
- Exhibit G Instructions Exhibit 1 - sano Source s scheduled A 1 Manual for Pzeparation of Data 8 Maintenance or Test 2 - Manual Scran Entry Sheets Licensee C - Refueling 3 Auto.wtic Sczan Event Report (LER) File D Regulatory restriction 4 - Continued (NUREG-0161) | |||
E Operator Training s 5 Load Reduction License Exanination 9 Other (Explain) | |||
F Administrative G Opozational Error (Explain) | |||
H Other (Explain) | |||
==SUMMARY== | ==SUMMARY== | ||
OF OPERATING EXPERIENCE DOCKET NO.50-250 UNIT Turke Point 3 DATE A ril 08 1993 COMPLETED BY:G.D.Herbenick TELEPHONE: | OF OPERATING EXPERIENCE DOCKET NO. 50-250 UNIT Turke Point 3 DATE A ril 08 1993 COMPLETED BY:G. D. Herbenick TELEPHONE: 305 246-7112 REPORT MONTH March 1993 On March 5, Unit 3 commenced load reduction to 55% power to repair the 3B Steam Generator Feedwater Pump. | ||
305 246-7112 REPORT MONTH March 1993 On March 5, Unit 3 commenced load reduction to 55%power to repair the 3B Steam Generator Feedwater Pump.On March 8, Unit 3 increased reactor power to 100%.On March 18, Unit 3 commenced load reduction to 40%power for Main Turbine valve testing and condenser waterbox cleaning.On March 19, Unit 3 increased reactor power to 100%.Unit 3 essentially maintained 100%power for the remainder of the month. | On March 8, Unit 3 increased reactor power to 100%. | ||
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. | On March 18, Unit 3 commenced load reduction to 40% power for Main Turbine valve testing and condenser waterbox cleaning. | ||
On March 19, Unit 3 increased reactor power to 100%. | |||
Unit 3 essentially maintained 100% power for the remainder of the month. | |||
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-251 UNIT TURKEY POINT ¹4 DATE APRIL 08 1993 COMPLETED BY G. HERBENICK TELEPHONE 305-246-7112 MONTH MARCH 1993 AVERAGE DAILY POWER LEVEL (MWe-Net) 03/01/93 691 03/02/93 690 03/03/93 688 03/04/93 686 03/05/93 687 03/06/93 686 03/07/93 684 03/08/93 684 03/09/93 688 03/1 0/93 686 03/1 1/92 680 03/1 2/93 678 03/1 3/93 683 03/1 4/93 698 03/1 5/93 702 03/1 6/93 700 03/1 7/93 694 03/1 8/93 688 03/1 9/93 684 03/20/93 683 03/21/93 679 03/22/93 676 03/23/93 680 03/24/93 677 03/25/93 674 03/26/93 674 03/27/93 674 03/28/93 672 03/29/93 677 03/30/93 678 03/31/93 674 | |||
' | ' | ||
OPERATING DATA REPORT DOCKET NO 50 - 25I DATE 4/ 8/93 COMPLETED BY G. D. Herbenick TELEPHONE 305/246-7112 OPERATING STATUS | |||
: 1. UNIT NAME: TURKEY POINT UNIT 4 | |||
UNIT SHUTDOWNS AND POWER REDUCTZONS DOCKET NO.50-251 UNIT NAME'URKEY POINT UNIT 4 DATE: APRIL 08 1993 COMPLETED BY: G.D.HERBENICK TELEPHONE: | : 2. REPORTING PERIOD: MARCH 1993 | ||
305 246-7112 REPORT MONTH MARCH 1993 No. | : 3. LICENSED THERMAL POWER (MWT): 2200 | ||
: 4. NAMEPLATE RATING (GROSS MWE): 760 | |||
: 5. DESIGN ELECTRICAL RATING (NET 'MWE): 693 | |||
: 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 699 | |||
: 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 666 | |||
: 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) | |||
SINCE LAST REPORT, GIVE REASONS: | |||
: 9. POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE) | |||
~ | |||
: 10. REASONS FOR RESTRICTIONS, IF ANY: | |||
MONTHLY -YTD- CUMULATIVE ll. HOURS IN REPORT PERIOD: 744 2160 171869. 0 | |||
: 12. NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 2160. 0 111998. 6 | |||
: 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 166. 6 | |||
: 14. HOURS GENERATOR ON-LINE 744.0 2151.9 108197. 2 I5. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 577.3 | |||
: 16. GROSS THERMAL ENERGY GENERATED (MWH) 1636770 4693143 228267478 | |||
: 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 533115 1526625 72885595 | |||
: 18. NET ELECTRICAL ENERGY GENERATED (MWH) 508628 1456246 68945187 | |||
: 19. UNIT SERVICE FACTOR 100.0 99.6 63.0 | |||
: 20. UNIT AVAILABILITYFACTOR 100.0 99.6 63.3 2'I. CAPACITY FACTOR (USING MDC NET) 102.6 101. 2 61.3 | |||
: 22. CAPACITY FACTOR (USING DER NET) 98.6 97.3 57.9 | |||
: 23. UNIT FORCED OUTAGE RATE 00.0 0.4 11.7 | |||
: 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS UNIT 4 WILL BEGIN A REFUELING AND MAINTENANCE OUTAGE ON APRIL 10, 1993. | |||
: 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: | |||
UNIT SHUTDOWNS AND POWER REDUCTZONS DOCKET NO. 50-251 UNIT NAME'URKEY POINT UNIT 4 DATE: APRIL 08 1993 COMPLETED BY: G.D. HERBENICK TELEPHONE: 305 246-7112 REPORT MONTH MARCH 1993 No. Date Type Duration Reasons Nethod of Licensee Systen Component cause s corrective (Hours) Shutting Event Codes Action to Down Reports Code'/A Prevent Recurrence Reactor'/A N/A N/A N/A N/A N/A N/A N/A N/A F - Forced Reason Method Exhibit - Instructions Exhibit - source s scheduled A Equipnent Failure 1 - Ywnual G | |||
for Preparation of Data 1 Sa=e B - Naintenance or Test 2 - Nwnual Scran Entry Sheets Licensee C - Refueling 3 Autcmatic Scrau Event Report (LER) File D Regulatory restriction 4 - Continued (NUREG-0161) | |||
E Operator Training S 5 Load Reduction License Exanination 9 Othez (Explain) | |||
F - Administrative G Operational Error (Explain) | |||
H - Other (Explain) | |||
(o | |||
~ | |||
~ | |||
l | |||
==SUMMARY== | ==SUMMARY== | ||
OF OPERATING EXPERIENCE DOCKET NO.50-251 UNIT Turke Point 4 DATE A | OF OPERATING EXPERIENCE DOCKET NO. 50-251 UNIT Turke Point 4 DATE A rilBY:G.D.Herbenick COMPLETED 08 1993 TELEPHONE: 305 246-7112 REPORT MONTH March 1993 Unit 4 essentially maintained 100% power for the month of March. | ||
305 246-7112 REPORT MONTH March 1993 Unit 4 essentially maintained 100%power for the month of March. | |||
0 0~~~ | 0 0 ~ ~ | ||
~ | |||
~ | |||
\ | |||
p it I'}} |
Revision as of 07:45, 22 October 2019
ML17349A806 | |
Person / Time | |
---|---|
Site: | Turkey Point |
Issue date: | 03/31/1993 |
From: | Herbenick G, Plunkett T FLORIDA POWER & LIGHT CO. |
To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
References | |
RTR-NUREG-0020, RTR-NUREG-20 L-93-94, NUDOCS 9304220346 | |
Download: ML17349A806 (17) | |
Text
ACCELERAT DOCVMENT DISTRmUTION SYSTEM REGULAT Y INFORMATION DISTRIBUTIO YSTEM (RIDS)
ACCESSION NBR:9304220346 DOC.DATE: 93/03/31 NOTARIZED: NO DOCKET FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 05000250 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 AUTH. NAME AUTHOR AFFILIATION HERBENICK,G.
PLUNKETT,T.F.
Florida Florida Power !'ight Power & Light Co.
Co.
RECIP.NAME RECIPIENT AFFILIATION
SUBJECT:
Monthl'y operating repts for Mar 1993 for Turkey Point Units D 3 a 4,per guidance of NUREG-0020.W/930413 ltr.
DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE:
.TITLE: Monthly Operating Report (per Tech Specs)
NOTES:
RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL D PD2-2 LA 3 3 PD2-2 PD 1 1 RAGHAVAN,L 1 1 INTERNAL: AEOD/DOA 1 1 AEOD/DSP/TPAB 1 1 RR/DORP/OEAB 1 1 NRR/DRIL/RPEB 1 1 EG FILE 01 1 1 RGN2 1 1 EXTERNAL: EGSrG BRYCEiJ.H 1 1 NRC PDR 1 1 NSIC 1 1 D
D NOTE TO ALL"RIDS" RECIPIENTS:
PLEASE HELP US fO REDUCE WASTE! CONTACT TIIE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 504-2065) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED: LTTR 14 ENCL 14
0
'
fe
'
P.O. Box 029100, Miami, FL, 33102-9100 APR 1 8t993 L-93-94 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DE C. 20555 Gentlemen:
RE: Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Monthl 0 eratin Re ort In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of NUREG-0020, attached are the March 1993 Operating Status and Summary of Operating Experience Reports for Turkey Point Units 3 and 4.
T. F. Plunkett Vice President Turkey'oint Nuclear TFP/GDH/gh attachments cc: Stewart D. Ebneter, Regional Administrator, Region II, USNRC Ross CD Butcher, Senior Resident Inspector, USNRC, Turkey Point Plant
'9304220346 930331 PDR ADOCK 05000250 R PDR an FPL Group company
) Ql) (>5,'8 AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-250 UNIT TURKEY POINT ¹3 DATE APRIL 08 1993 COMPLETED BY G. HERBENICK TELEPHONE 305-246-7112 MONTH MARCH 1993 AVERAGE DAILY POWER LEVEL (MWe-Net) 03/01/93 699 03/02/93 696 03/03/93 692 03/04/93 691 03/05/93 544 03/06/93 378 03/07/93 378 03/08/93 642 03/09/93 688 03/1 0/93 689 03/1 1/93 684 03/1 2/93 681 03/1 3/93 689 03/1 4/93 704 03/1 5/93 707 03/1 6/93 706 03/17/93 701 03/1 8/93 386 03/1 9/93 687 03/20/93 699 03/21/93 697 03/22/93 693 03/23/93 695 03/24/93 652 03/25/93 689 03/26/93 690 03/27/93 689 03/28/93 688 03/29/93 691 03/30/93 687 03/31/93 685
I
- p. N
~ "i
OPERATING DATA REPORT DOCKET NO 50 250 DATE 4/ 8/93 COMPLETED BY G. D. Herbonhck TELEPHONE 305/246-7112 OPERATING STATUS
- 1. UNIT NAME: TURKEY POINT UNIT 3
- 2. REPORTING PERIOD: MARCH 1993
- 3. LICENSED THERMAL POWER (MWT): 2200
- 4. NAMEPLATE RATING (GROSS MWE): 760
- 5. DESIGN ELECTRICAL RATING (NET MWE): 693
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 699
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 666
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)
SINCE LAST REPORT, GIVE REASONS:
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE)
- 10. REASONS FOR RESTRICTIONS, IF ANY:
MONTHLY -YTD- CUMULATIVE
- 11. HOURS IN REPORT PERIOD: 744 2160 178137. 6
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 2043.9 114803.2
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 844.4
- 14. HOURS GENERATOR ON-LINE 744.0 2007.5 113118.3
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 121.8
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 1557074 4305713 234212640
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 511385 1419340 75061466
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 487162 1351108 70963268
- 19. UNIT SERVICE FACTOR 100.0 92.9 63.5
- 20. UNIT AVAILABILITYFACTOR 100.0 92.9 63.6
- 21. CAPACITY FACTOR (USING MDC NET) 98.3 93.9 60.9
- 22. CAPACITY FACTOR (USING DER NET) 94.5 90.3 57.5
- 23. UNIT FORCED OUTAGE RATE 0.0 7.1 12.4
- 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS NO SHUTDOWNS ARE SCHEDULED FOR UNIT 3.
- 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
4 UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-250 UNIT NAME: TURKEY POINT UNIT 3 DATE: APRIL 08 1993 COMPLETED BY: G. D. HERBENICK TELEPHONE: 305 246-7112 REPORT MONTH MARCH 1993 No Date Duration (Hours)
Reason* Method of Shutting Event Reactor'icensee Down Ropoztf Syston Code'ause Code'onponent C Corrective Action to Prevent Recurrence 05 930305 0.00 N/A HH POMP XX 38 STEAM GENERATOR FEEDWATER PVMP 06 930318 0.00 N/A HC HTEXCH WATERBOX CLEANING F Forced
- Reason
- Equipment Failure Method
- Exhibit G Instructions Exhibit 1 - sano Source s scheduled A 1 Manual for Pzeparation of Data 8 Maintenance or Test 2 - Manual Scran Entry Sheets Licensee C - Refueling 3 Auto.wtic Sczan Event Report (LER) File D Regulatory restriction 4 - Continued (NUREG-0161)
E Operator Training s 5 Load Reduction License Exanination 9 Other (Explain)
F Administrative G Opozational Error (Explain)
H Other (Explain)
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO. 50-250 UNIT Turke Point 3 DATE A ril 08 1993 COMPLETED BY:G. D. Herbenick TELEPHONE: 305 246-7112 REPORT MONTH March 1993 On March 5, Unit 3 commenced load reduction to 55% power to repair the 3B Steam Generator Feedwater Pump.
On March 8, Unit 3 increased reactor power to 100%.
On March 18, Unit 3 commenced load reduction to 40% power for Main Turbine valve testing and condenser waterbox cleaning.
On March 19, Unit 3 increased reactor power to 100%.
Unit 3 essentially maintained 100% power for the remainder of the month.
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-251 UNIT TURKEY POINT ¹4 DATE APRIL 08 1993 COMPLETED BY G. HERBENICK TELEPHONE 305-246-7112 MONTH MARCH 1993 AVERAGE DAILY POWER LEVEL (MWe-Net) 03/01/93 691 03/02/93 690 03/03/93 688 03/04/93 686 03/05/93 687 03/06/93 686 03/07/93 684 03/08/93 684 03/09/93 688 03/1 0/93 686 03/1 1/92 680 03/1 2/93 678 03/1 3/93 683 03/1 4/93 698 03/1 5/93 702 03/1 6/93 700 03/1 7/93 694 03/1 8/93 688 03/1 9/93 684 03/20/93 683 03/21/93 679 03/22/93 676 03/23/93 680 03/24/93 677 03/25/93 674 03/26/93 674 03/27/93 674 03/28/93 672 03/29/93 677 03/30/93 678 03/31/93 674
'
OPERATING DATA REPORT DOCKET NO 50 - 25I DATE 4/ 8/93 COMPLETED BY G. D. Herbenick TELEPHONE 305/246-7112 OPERATING STATUS
- 1. UNIT NAME: TURKEY POINT UNIT 4
- 2. REPORTING PERIOD: MARCH 1993
- 3. LICENSED THERMAL POWER (MWT): 2200
- 4. NAMEPLATE RATING (GROSS MWE): 760
- 5. DESIGN ELECTRICAL RATING (NET 'MWE): 693
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 699
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 666
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)
SINCE LAST REPORT, GIVE REASONS:
- 9. POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE)
~
- 10. REASONS FOR RESTRICTIONS, IF ANY:
MONTHLY -YTD- CUMULATIVE ll. HOURS IN REPORT PERIOD: 744 2160 171869. 0
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 2160. 0 111998. 6
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 166. 6
- 14. HOURS GENERATOR ON-LINE 744.0 2151.9 108197. 2 I5. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 577.3
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 1636770 4693143 228267478
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 533115 1526625 72885595
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 508628 1456246 68945187
- 19. UNIT SERVICE FACTOR 100.0 99.6 63.0
- 20. UNIT AVAILABILITYFACTOR 100.0 99.6 63.3 2'I. CAPACITY FACTOR (USING MDC NET) 102.6 101. 2 61.3
- 22. CAPACITY FACTOR (USING DER NET) 98.6 97.3 57.9
- 23. UNIT FORCED OUTAGE RATE 00.0 0.4 11.7
- 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS UNIT 4 WILL BEGIN A REFUELING AND MAINTENANCE OUTAGE ON APRIL 10, 1993.
- 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
UNIT SHUTDOWNS AND POWER REDUCTZONS DOCKET NO. 50-251 UNIT NAME'URKEY POINT UNIT 4 DATE: APRIL 08 1993 COMPLETED BY: G.D. HERBENICK TELEPHONE: 305 246-7112 REPORT MONTH MARCH 1993 No. Date Type Duration Reasons Nethod of Licensee Systen Component cause s corrective (Hours) Shutting Event Codes Action to Down Reports Code'/A Prevent Recurrence Reactor'/A N/A N/A N/A N/A N/A N/A N/A N/A F - Forced Reason Method Exhibit - Instructions Exhibit - source s scheduled A Equipnent Failure 1 - Ywnual G
for Preparation of Data 1 Sa=e B - Naintenance or Test 2 - Nwnual Scran Entry Sheets Licensee C - Refueling 3 Autcmatic Scrau Event Report (LER) File D Regulatory restriction 4 - Continued (NUREG-0161)
E Operator Training S 5 Load Reduction License Exanination 9 Othez (Explain)
F - Administrative G Operational Error (Explain)
H - Other (Explain)
(o
~
~
l
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO. 50-251 UNIT Turke Point 4 DATE A rilBY:G.D.Herbenick COMPLETED 08 1993 TELEPHONE: 305 246-7112 REPORT MONTH March 1993 Unit 4 essentially maintained 100% power for the month of March.
0 0 ~ ~
~
~
\
p it I'