{{#Wiki_filter:MGNTRLY REFTB (PGR GRAY BQQK PREPARATT0N)II NRC DISTRIBUTION FOR PART 50 DOCI<ET MATERIAL (TEMPO BAR Y Fo RM)CONTROL NO: FII E*MONTHLY REPORT PILE FROM: Rochester Gas 8 Elec.C Charles f.P(att Roch ste, N Y.10-2-75 10-10-75.DATE OF DOC DATE REC'D LTR XXX TWX R.PT OTHE R NRC CLASS UNCLASS PROPINFO XXX DESCRIPTION:
{{#Wiki_filter:MGNTRLY     REFTB     (PGR GRAY BQQK   PREPARATT0N)II NRC DISTRIBUTION FOR PART 50 DOCI<ET MATERIAL (TEMPO BAR Y Fo RM)
Ltr trans the following:
CONTROL NO:
ORIG 1 Si ned INPUT CC OTHER 0 No CYS REC'D ENCLOSURES SENT AEC PORTLY SENT LOCAL PDR XXX DOCKET No: PLANT NAME: RE Ginna 8 1 Plant 6 Component Operability
FII E* MONTHLY REPORT   PILE FROM:       Rochester   Gas   8 Elec. C .DATE OF DOC      DATE REC'D        LTR      TWX    R.PT      OTHE R Roch ste, Charles f.
&, Availability This Report to be used in preparing Gray Book by Plans 6 Operations.
N Y.
NUIIBER OP COPIES REC'D: 1 FOR*ACTION/INFORMATION BUT'LER (L)W/Copies CLARK (L)W/Copies PARR (L)W/Copies KNIEL (L)W/Copies SCHWENCER (L)ZIEMANN (L)BEGAN (E)W/Copies W/Copies W/Copies ETDLE (L)D(GKER (E)LEAR (L)eIICKNO+LEDGED, W/Copies W/Copies W/Copies VASSALLO (L)I<NIGHTON (E)SPELS W/Copies W/Copies W/Copies/PURPLE (L)YOUNGBLOOD (E)~HIPC/PE W/Copies W/Copies W.'4 Copies)DO NO EMpyg INTERNAL DISTRIBUTION F IL~NB(OGC, ROOM P-506A GOSSI CK/STAF F CASE GIAMBUSSO BOYD MOORE (L)DEYOUNG (L)SKOVWOLT (L)GOLLER (L)(Ltr)P.COLLINS DENISE REG OPB FI I.F R(REGION (2)STEELE TECH REVIEW SCHROEDER MACCARY KNIGHT PAWLICKI SHAO STELLO HOUSTON NOVAK ROSS IPPOLITO TEDESCO J.COLLINS LA I NAS BENAROYA VOLLMEB DENTON GRIMES GAMMI LL KASTNE R BALLARD SPANGLFR.LIC ASST R.DIGGS (I)H.GEAR IN (L)E.GOULBOURNE (L)P.KREUTZER (E)J.LEE (L)M.RUBIFROOK (L)S.REED (E)M.SERVICE (L)yS.Sl-IEPPARD (L)M.SLATER (E)H.SMITH (L)S.TEETS (L)G.WILLIAMS (E)V.WILSON (L)R.INGRAM (L)M DUNCA ENVI Ro MULLER Dl CI<ER KNIG HTON YOUNGBLOOD BEGAN PROJECT LDR HAB LESS EXTERNAL DISTR I fhUTION A/T I ND~BRAITMAN SALTZMAN MELTZ PLANS~MCDONALD~CHAPMAN DUBE (Ltr)E.COUPE PETERSON HARTFIELD (2)KLEC ICE R EISENI-IUT Wl GG I N TON~1-LOCALPDR~Lons Rochester N.Y.~1-1 IC (ABERNATHY)
P(att            10-2-75           10-10-75         XXX ORIG        CC    OTHER        SENT AEC PORTLY NRC                         1  Si ned        0                    SENT LOCAL PDR XXX CLASS       UNCLASS       PROPINFO             INPUT     No CYS REC'D           DOCKET No:
(1)(2)(10)
XXX DESCRIPTION:                                                ENCLOSURES Ltr trans    the following:
-NATIONAL LABS~1-NSIC (BUCHANAN) 1-W.PENNINGTON, Bm E-201 GT~>-ASLB 1-CONSULTANTS 1-Newton Anderson NLWMARK/BLUME/AG BABI AN-ACRS HOLDING/SENT 1-P D R-SAN/LA/N Y 1-BROOKHAVEN NAT LAB 1-G.ULRIKSON, ORNL 1-AGMED (RUTH GUSSMAN)Rm 8-127 GT, 1-J.D.RUNKLES, Rm E-201 GT  
Plant 6 Component Operability &, Availability This Report to be used in preparing Gray Book by Plans 6 Operations.
NUIIBER OP COPIES REC'D:         1 PLANT NAME:          RE  Ginna 8    1 FOR*ACTION/INFORMATION BUT'LER (L)               SCHWENCER (L) ZIEMANN (L)                 BEGAN (E)
W/ Copies                W/ Copies             W/ Copies           W/ Copies CLARK (L)                ETDLE (L)             D(GKER (E)           LEAR (L) eIICKNO+LEDGED, W/ Copies                 W/ Copies            W/ Copies           W/ Copies PARR (L)                  VASSALLO (L)         I<NIGHTON (E)       SPELS W/ Copies                 W/ Copies            W/ Copies            W/ Copies KNIEL (L)
W/ Copies
                          /PURPLE (L)
W/ Copies YOUNGBLOOD (E)
W/ Copies
                                                                      ~   HIPC/PE W.'4 Copies       )DO NO           EMpyg INTERNAL   DISTRIBUTION F IL               TECH REVIEW          DENTON              LIC ASST                  A/T I ND  ~
~ OGC, NB(                       SCHROEDER           GRIMES           R. DIGGS (I )                 BRAITMAN ROOM P-506A        MACCARY              GAMMILL          H. GEAR IN (L)                 SALTZMAN GOSSI CK/STAF F            KNIGHT                KASTNE R        E. GOULBOURNE (L)             MELTZ CASE                      PAWLICKI              BALLARD          P. KREUTZER     (E)
GIAMBUSSO                  SHAO                SPANGLFR .        J. LEE (L)                   PLANS BOYD                      STELLO                                M. RUBIFROOK (L)           ~MCDONALD MOORE (L)
DEYOUNG (L)
HOUSTON NOVAK ENVI Ro MULLER S. REED (E)
M. SERVICE (L)
                                                                                                ~  CHAPMAN DUBE (Ltr)
SKOVWOLT (L)              ROSS                Dl CI< ER        yS. Sl-IEPPARD (L)             E. COUPE GOLLER (L) (Ltr)          IPPOLITO              KNIGHTON        M. SLATER (E)                 PETERSON P. COLLINS                TEDESCO              YOUNGBLOOD H. SMITH (L)                         HARTFIELD (2)
DENISE                    J. COLLINS          BEGAN            S. TEETS   (L)               KLEC ICE R REG OPB                    LAI NAS              PROJECT LDR      G. WILLIAMS(E)                 EISENI-IUT FI I.F R( REGION (2)      BENAROYA                              V. WILSON (L)                 Wl GG I N TON VOLLMEB              HAB LESS        R. INGRAM (L)
STEELE                                                            M DUNCA EXTERNAL DISTR I fhUTION
~1 LOCALPDR~Lons Rochester N.Y.                                                       P D R-SAN/LA/NY
~1 1 IC (ABERNATHY) (1)(2)(10) NATIONALLABS                                        1 BROOKHAVEN NAT LAB
~1   NSIC (BUCHANAN)                   1     W. PENNINGTON, Bm E-201 GT             1
~> ASLB                               1   CONSULTANTS                             1 G. ULRIKSON, ORNL 1 Newton Anderson                         NLWMARK/BLUME/AGBABIAN                1 AGMED (RUTH GUSSMAN)
ACRS HOLDING/SENT                                                                    Rm 8-127 GT, 1 J. D. RUNKLES, Rm E-201 GT


t yzizzzp'iiiiiiiiriii i slztzifll/E iiIiiiiIiii ROCHESTER GAS AND ELECTRIC CORPORATION o S9 EAST AVENUE, ROCHESTER, N.Y.14649 TELEPHON E AREA coDE lid 546.2700 Office of Plans and Schedules Directorate of Licensing U.S.Nuclear Regulatory Commission Washington, D.C.20555 na Sta tion gp c<+c,~o>+St ber 2, 1975 zi~gql>gpss 6 bi Mr,l~P'(s~(
t yzizzzp'       iiiiiiiiriii i slztzifll/E iiIiiiiIiii ROCHESTER GAS AND ELECTRIC CORPORATION o S9 EAST AVENUE, ROCHESTER, N.Y. 14649 TELEPHON E AREA coDE lid 546.2700 c<+
gp              na Sta   tion
                                                                            ~o>+ c,            St ber 2, 1975 zi                 ~gql>
gpss                   6 bi Mr,l~
P
                                                                            '(s~(
Office of Plans and Schedules Directorate of Licensing U. S. Nuclear Regulatory Commission Washington, D. C. 20555
                                                                                      'R~~fa~tOlf    '~.~e-~3"-


==Subject:==
==Subject:==
Monthly Report for September, 1975 Operating Status Information R.E.Ginna Nuclear Power Plant Unit No.1 Docket No.50-244'R~~fa~tOlf
Monthly Report for September, 1975 Operating Status Information R. E. Ginna Nuclear Power Plant Unit No.             1 Docket No. 50-244 Gentlemen:
'~.~e-~3"-
Pursuant to the letter dated February 19, 1974 of Mr. L. Manning Muntzing, Director of Regulation, enclosed herewith is the requested operating status information of the Ginna Station for the month of September.
Gentlemen:
Very   truly yours, Charles E. Platt Superint'endent CEP:kas Enclosure
Pursuant to the letter dated February 19, 1974 of Mr.L.Manning Muntzing, Director of Regulation, enclosed herewith is the requested operating status information of the Ginna Station for the month of September.
'cc: Mr.         James             P. O'Reilly o
Very truly yours, Charles E.Platt Superint'endent CEP:kas Enclosure'cc: Mr.James P.O'Reilly S'gg/P~o ooqgoy~~~0~.o~ng@+io"'~~
S'gg/P~
etlCJlal~EEL/E~
ooq goy~~
4~~
                                                            ~
'.UNIT NAhlE.Ginna Station, t 81 I, DATE: October 2 1975 COhlPLETED BY: Andrew E.McNamara, Operations Aide Telephone$11-716-546-2700, Ext.OpER4T]NG STpTUc)291-214 at Ginna 1.REPORTING PERIOD: GROSS HOURS IN REPORTING PERIOD: TO: 720 2400,750930 2.CURRENTLY AUTHORIZED POWER LEVEL hlWt 1520 hlax.Depend.Capacity (hIIVe-Net) 3.POWER LEVEL TO WHICH RESTRICTED (IF ANY): (hHUe Net)4.REASONS FOR RESTRICTIONS (IF ANY): 470 5.NUhlBER OF HOURS THE REACTOR WAS CRITICAL..
                                                                .
THIS MONTH YEAR TO DATE 720 4, 724.54 CUMULATIVE TO DATE 39, 043.6.REACTOR RESERVE SHUTDOWN HOURS............
o
7.HOURS GENERATOR ON LINE.~8.UNIT RESERVE SHUTDOWN HOURS....9~GROSS THERhlAL ENERGY GENERATED (hLWH)~~~~~~10'ROSS ELECTRICAL ENERGY GENERATED (htWH)~~~11.NET ELECTRICAL ENERGY GENERATED (MWH)...~~12.REACTOR AVAILABILITY FACTOR (1)..........
                                                                  ~ng@+io"'~~
13.UNIT AVAILABILTY FACTOR (2).............
                                                                                          ~0 etlCJlal
14.UNIT CAPACITY FACTOR (3)..15.UNIT FORCED OUTAGE RATE (4)..720 1 086 864~6~0 344 396 100%100%101.8%291.22 4"588.75 8.5 6 537 163 2: "831 2 036 423 72.12%70.05%66.14%5.74%291.22'7,790.88 8.5+47 201 482 15 750 649 14 887,585 75.6%73.75%65.96%9.23%1 6~SHUTDOWNS SCI'IEDULED OVER NEXT 6 MONTHS 3 (TYPE 3 DATE AND DURATI ON OF EACH)March 12, 1976 to May 6, 1976 annual refueling shutdown.17'F SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: 18'NITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
                                                                    ~EEL/E~
DATE FORECASTED DATE ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICAL POWER GENERATION COhlhlERCIAL OPERATION (1)REACTOR AVAILABILITY FACTOR=HOURS REACTOR WAS CRITICAL GROSS HOURS IN REPORTING PERIOD HOURS GENERATOR ON"LINE GROSS HOURS IN REPORTING PERIOD 0100 0100 (3)UNIT CAPACITY FACTOR=NET ELECTRICAL POWER GENERATED 8100 CURRENTLY LICENSED POWER LEVEL<<'GROSS HRS.IN REPORTING PERIOD (4)FORCED OUTAGE RATE"-FORCED OUTAGE HOURS e100 HOURS GENERATOR ON-LINE+FORCED OUTAGE HOURS+Cumulative data commencing January 1, 1975 49 88


ENCLOSURE A~I UNIT Ginna Station Unit 81 October 2 1975 OOh(PLETED BY Andrew E.McNamara, Opera iona Aide Telephone fk 1-716-546-2700, Ext 291-214 DAILY PLANT POWER OUTPUT MONTR September, 1975 DAY 7 10 13 15 16 17 18 19 20 21 23 AVERAGE DAILY hfWe-net 481.46 481.58 480.17 480.20 480.5 478.92 479.04 478.38 4 78.'1',7 477.04 476.83 477.46 477.50 476.29 475.67 477.67 476.54 476.63 477.17 477.88 477.25 477.54 477.29 477 DAY 25 26 27 28 29 30 31 AVERAGE DAILY hOVe-net 478.58 480.45 479.5 479.2 478.04 479.88 49~87 I O.)t  
4
~ ~
 
  '. UNIT NAhlE.      Ginna  Station,        t  81 I,
DATE:            October  2    1975 COhlPLETED BY:
Andrew E. McNamara, Operations Aide Telephone $11-716-546-2700,        Ext.      OpER4T] NG STpTUc) 291-214 at Ginna
: 1. REPORTING PERIOD:                                        TO:          2400,750930 GROSS  HOURS  IN REPORTING PERIOD:                    720
: 2. CURRENTLY AUTHORIZED POWER LEVEL hlWt            1520        hlax. Depend. Capacity (hIIVe-Net)      470
: 3. POWER  LEVEL TO WHICH RESTRICTED        (IF ANY): (hHUe Net) 4 . REASONS FOR RESTRICTIONS        (IF ANY):
THIS                        CUMULATIVE MONTH      YEAR TO DATE        TO DATE
: 5. NUhlBER OF HOURS THE REACTOR WAS CRITICAL..                          720        4, 724. 54          39, 043.
: 6. REACTOR RESERVE SHUTDOWN HOURS............                                          291.22 291.22'7,790.88
: 7. HOURS GENERATOR ON LINE.        ~
720        4"588.75
: 8. UNIT RESERVE SHUTDOWN HOURS....                                                      8.5                  8.5+
9 ~  GROSS  THERhlAL ENERGY GENERATED (hLWH) ~    ~ ~ ~ ~  ~
1  086 864    6 537 163          47 201 482 10  'ROSS      ELECTRICAL ENERGY GENERATED (htWH)        ~ ~  ~      ~6~0            2:    "831        15 750 649
: 11. NET ELECTRICAL ENERGY GENERATED          (MWH)...    ~ ~
344 396      2 036    423        14 887,585 12  . REACTOR    AVAILABILITYFACTOR        (1)..........                100%            72.12%              75.6      %
: 13. UNIT AVAILABILTYFACTOR              (2).............                  100%            70.05%            73.75%
: 14. UNIT CAPACITY FACTOR (3)..                                          101.8%            66.14%            65.96%
: 15. UNIT FORCED OUTAGE RATE (4)..                                                          5.74%            9.23%
1 6 ~  SHUTDOWNS SCI'IEDULED OVER NEXT 6 MONTHS 3          ( TYPE 3  DATE AND DURATION OF EACH )
March 12, 1976 to May 6, 1976 annual          refueling shutdown.
17  'F    SHUT DOWN AT END OF REPORT PERIOD,          ESTIMATED DATE OF STARTUP:
18  'NITS      IN TEST STATUS (PRIOR        TO COMMERCIAL        OPERATION):
DATE FORECASTED        DATE ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICAL POWER        GENERATION COhlhlERCIAL OPERATION (1)    REACTOR  AVAILABILITYFACTOR        = HOURS REACTOR WAS CRITICAL                  0100 GROSS HOURS IN REPORTING PERIOD HOURS GENERATOR ON"LINE                    0100 GROSS HOURS IN REPORTING          PERIOD (3) UNIT CAPACITY        FACTOR = NET ELECTRICAL POWER GENERATED                                                8100 CURRENTLY LICENSED POWER LEVEL<<'GROSS HRS.                IN REPORTING PERIOD (4)    FORCED OUTAGE RATE    "-  FORCED OUTAGE HOURS                                    e100 HOURS GENERATOR ON-LINE+ FORCED OUTAGE HOURS
        +  Cumulative data commencing January 1, 1975 49 88
 
ENCLOSURE A               ~ I UNIT Ginna   Station   Unit   81 October 2   1975 OOh(PLETED BY Andrew E. McNamara, Opera iona Aide Telephone   fk 1-716-546-2700,     Ext 291-214 DAILY PLANT     POWER OUTPUT MONTR September, 1975 DAY           AVERAGE DAILY hfWe-net      DAY              AVERAGE DAILY hOVe-net 481.46                                       478.58 25 481. 58               26                    480.45 480.17                 27                    479. 5 480.20                 28                    479.2 480. 5                 29                    478. 04 478.92                 30                    479.88 7                  479. 04               31 478.38 4 78 .'1',7 10                  477.04 476.83 477.46 13                  477. 50 476. 29 15                  475.67 16                  477.67 17                  476.54 18                  476.63 19                  477. 17 20                  477.88 21                  477. 25 477. 54 23                  477. 29 477 49 ~ 87
 
I O.
)t


==SUMMARY==
==SUMMARY==
: Reactor Power Level averaged 99.5%in the month.Exceptions were a reduction to 97%level on 9/10 during performance of PT-6.4, incore-excore calibration", reduction to>96%level on 9/23 to perform PT-16, Auxiliary Feed-water system flow check.REPDRT MDNTH September, 1975 UN I T NAME Ginna Station Unittl October 2 1975 f<<.tg~Andrew E.HcNamara, Operations Aide Telephone IP1-716-546-2700, Ext.291-214 at Ginna PLANT SHUTDOWNS DATE TYPE F-FORCED S-SCHEDULED DURATION (HOURS)REASON (I)METHOD OF SHUTTING DOWN THE REACTOR (2)COMMENTS No shutdowns to report (I)REASON: A-EQUIPMENT FAILURE (EXPLAIN)8-MAINT.OR TEST C-REFUELING D-REGULATORY RESTRICTION E-OPERATOR TRAINING AND LICENSE EXAMINATION F-ADMINISTRATIVE G-OPERATIONAL ERROR (EXPLAIN)(2)METHOD: A-MANUAL B-MANUAL SCRAM C-AUTOMATIC SCRAM 49 89 M/}}
: Reactor Power Level averaged 99.5%                                                               UN I T NAME  Ginna  Station  Unittl in the month. Exceptions were a reduction to f <<.tg~
97% level on 9/10 during performance of PT-6.4,                                                                       October  2  1975 incore-excore calibration", reduction to>96%
level on 9/23 to perform PT-16, Auxiliary Feed-water system flow check.                                                                                             Andrew E. HcNamara, Operations Aide Telephone IP1-716-546-2700, Ext. 291-214 at Ginna REPDRT MDNTH September, 1975 PLANT SHUTDOWNS TYPE                                   METHOD OF F-FORCED       DURATION                SHUTTING  DOWN COMMENTS DATE    S-SCHEDULED     (HOURS) REASON (I)     THE REACTOR (2)
No shutdowns   to report (I) REASON:                               (2)  METHOD:
A - EQUIPMENT FAILURE (EXPLAIN)           A - MANUAL 8 - MAINT. OR TEST                         B - MANUAL SCRAM C - REFUELING                             C - AUTOMATIC SCRAM D - REGULATORY RESTRICTION E - OPERATOR TRAINING AND LICENSE EXAMINATION F - ADMINISTRATIVE G - OPERATIONAL ERROR (EXPLAIN) 49 89
 
M/}}

Revision as of 02:21, 21 October 2019

R. E. Ginna - Forwards Operating Status Information for Month of September 1975
ML18142B394
Person / Time
Site: Ginna Constellation icon.png
Issue date: 10/02/1975
From: Platt C
Rochester Gas & Electric Corp
To:
Office of Nuclear Reactor Regulation
References
Download: ML18142B394 (10)


Text

MGNTRLY REFTB (PGR GRAY BQQK PREPARATT0N)II NRC DISTRIBUTION FOR PART 50 DOCI<ET MATERIAL (TEMPO BAR Y Fo RM)

CONTROL NO:

FII E* MONTHLY REPORT PILE FROM: Rochester Gas 8 Elec. C .DATE OF DOC DATE REC'D LTR TWX R.PT OTHE R Roch ste, Charles f.

N Y.

P(att 10-2-75 10-10-75 XXX ORIG CC OTHER SENT AEC PORTLY NRC 1 Si ned 0 SENT LOCAL PDR XXX CLASS UNCLASS PROPINFO INPUT No CYS REC'D DOCKET No:

XXX DESCRIPTION: ENCLOSURES Ltr trans the following:

Plant 6 Component Operability &, Availability This Report to be used in preparing Gray Book by Plans 6 Operations.

NUIIBER OP COPIES REC'D: 1 PLANT NAME: RE Ginna 8 1 FOR*ACTION/INFORMATION BUT'LER (L) SCHWENCER (L) ZIEMANN (L) BEGAN (E)

W/ Copies W/ Copies W/ Copies W/ Copies CLARK (L) ETDLE (L) D(GKER (E) LEAR (L) eIICKNO+LEDGED, W/ Copies W/ Copies W/ Copies W/ Copies PARR (L) VASSALLO (L) I<NIGHTON (E) SPELS W/ Copies W/ Copies W/ Copies W/ Copies KNIEL (L)

W/ Copies

/PURPLE (L)

W/ Copies YOUNGBLOOD (E)

W/ Copies

~ HIPC/PE W.'4 Copies )DO NO EMpyg INTERNAL DISTRIBUTION F IL TECH REVIEW DENTON LIC ASST A/T I ND ~

~ OGC, NB( SCHROEDER GRIMES R. DIGGS (I ) BRAITMAN ROOM P-506A MACCARY GAMMILL H. GEAR IN (L) SALTZMAN GOSSI CK/STAF F KNIGHT KASTNE R E. GOULBOURNE (L) MELTZ CASE PAWLICKI BALLARD P. KREUTZER (E)

GIAMBUSSO SHAO SPANGLFR . J. LEE (L) PLANS BOYD STELLO M. RUBIFROOK (L) ~MCDONALD MOORE (L)

DEYOUNG (L)

HOUSTON NOVAK ENVI Ro MULLER S. REED (E)

M. SERVICE (L)

~ CHAPMAN DUBE (Ltr)

SKOVWOLT (L) ROSS Dl CI< ER yS. Sl-IEPPARD (L) E. COUPE GOLLER (L) (Ltr) IPPOLITO KNIGHTON M. SLATER (E) PETERSON P. COLLINS TEDESCO YOUNGBLOOD H. SMITH (L) HARTFIELD (2)

DENISE J. COLLINS BEGAN S. TEETS (L) KLEC ICE R REG OPB LAI NAS PROJECT LDR G. WILLIAMS(E) EISENI-IUT FI I.F R( REGION (2) BENAROYA V. WILSON (L) Wl GG I N TON VOLLMEB HAB LESS R. INGRAM (L)

STEELE M DUNCA EXTERNAL DISTR I fhUTION

~1 LOCALPDR~Lons Rochester N.Y. P D R-SAN/LA/NY

~1 1 IC (ABERNATHY) (1)(2)(10) NATIONALLABS 1 BROOKHAVEN NAT LAB

~1 NSIC (BUCHANAN) 1 W. PENNINGTON, Bm E-201 GT 1

~> ASLB 1 CONSULTANTS 1 G. ULRIKSON, ORNL 1 Newton Anderson NLWMARK/BLUME/AGBABIAN 1 AGMED (RUTH GUSSMAN)

ACRS HOLDING/SENT Rm 8-127 GT, 1 J. D. RUNKLES, Rm E-201 GT

t yzizzzp' iiiiiiiiriii i slztzifll/E iiIiiiiIiii ROCHESTER GAS AND ELECTRIC CORPORATION o S9 EAST AVENUE, ROCHESTER, N.Y. 14649 TELEPHON E AREA coDE lid 546.2700 c<+

gp na Sta tion

~o>+ c, St ber 2, 1975 zi ~gql>

gpss 6 bi Mr,l~

P

'(s~(

Office of Plans and Schedules Directorate of Licensing U. S. Nuclear Regulatory Commission Washington, D. C. 20555

'R~~fa~tOlf '~.~e-~3"-

Subject:

Monthly Report for September, 1975 Operating Status Information R. E. Ginna Nuclear Power Plant Unit No. 1 Docket No. 50-244 Gentlemen:

Pursuant to the letter dated February 19, 1974 of Mr. L. Manning Muntzing, Director of Regulation, enclosed herewith is the requested operating status information of the Ginna Station for the month of September.

Very truly yours, Charles E. Platt Superint'endent CEP:kas Enclosure

'cc: Mr. James P. O'Reilly o

S'gg/P~

ooq goy~~

~

.

o

~ng@+io"'~~

~0 etlCJlal

~EEL/E~

4

~ ~

'. UNIT NAhlE. Ginna Station, t 81 I,

DATE: October 2 1975 COhlPLETED BY:

Andrew E. McNamara, Operations Aide Telephone $11-716-546-2700, Ext. OpER4T] NG STpTUc) 291-214 at Ginna

1. REPORTING PERIOD: TO: 2400,750930 GROSS HOURS IN REPORTING PERIOD: 720
2. CURRENTLY AUTHORIZED POWER LEVEL hlWt 1520 hlax. Depend. Capacity (hIIVe-Net) 470
3. POWER LEVEL TO WHICH RESTRICTED (IF ANY): (hHUe Net) 4 . REASONS FOR RESTRICTIONS (IF ANY):

THIS CUMULATIVE MONTH YEAR TO DATE TO DATE

5. NUhlBER OF HOURS THE REACTOR WAS CRITICAL.. 720 4, 724. 54 39, 043.
6. REACTOR RESERVE SHUTDOWN HOURS............ 291.22 291.22'7,790.88
7. HOURS GENERATOR ON LINE. ~

720 4"588.75

8. UNIT RESERVE SHUTDOWN HOURS.... 8.5 8.5+

9 ~ GROSS THERhlAL ENERGY GENERATED (hLWH) ~ ~ ~ ~ ~ ~

1 086 864 6 537 163 47 201 482 10 'ROSS ELECTRICAL ENERGY GENERATED (htWH) ~ ~ ~ ~6~0 2: "831 15 750 649

11. NET ELECTRICAL ENERGY GENERATED (MWH)... ~ ~

344 396 2 036 423 14 887,585 12 . REACTOR AVAILABILITYFACTOR (1).......... 100% 72.12% 75.6  %

13. UNIT AVAILABILTYFACTOR (2)............. 100% 70.05% 73.75%
14. UNIT CAPACITY FACTOR (3).. 101.8% 66.14% 65.96%
15. UNIT FORCED OUTAGE RATE (4).. 5.74% 9.23%

1 6 ~ SHUTDOWNS SCI'IEDULED OVER NEXT 6 MONTHS 3 ( TYPE 3 DATE AND DURATION OF EACH )

March 12, 1976 to May 6, 1976 annual refueling shutdown.

17 'F SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

18 'NITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

DATE FORECASTED DATE ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICAL POWER GENERATION COhlhlERCIAL OPERATION (1) REACTOR AVAILABILITYFACTOR = HOURS REACTOR WAS CRITICAL 0100 GROSS HOURS IN REPORTING PERIOD HOURS GENERATOR ON"LINE 0100 GROSS HOURS IN REPORTING PERIOD (3) UNIT CAPACITY FACTOR = NET ELECTRICAL POWER GENERATED 8100 CURRENTLY LICENSED POWER LEVEL<<'GROSS HRS. IN REPORTING PERIOD (4) FORCED OUTAGE RATE "- FORCED OUTAGE HOURS e100 HOURS GENERATOR ON-LINE+ FORCED OUTAGE HOURS

+ Cumulative data commencing January 1, 1975 49 88

ENCLOSURE A ~ I UNIT Ginna Station Unit 81 October 2 1975 OOh(PLETED BY Andrew E. McNamara, Opera iona Aide Telephone fk 1-716-546-2700, Ext 291-214 DAILY PLANT POWER OUTPUT MONTR September, 1975 DAY AVERAGE DAILY hfWe-net DAY AVERAGE DAILY hOVe-net 481.46 478.58 25 481. 58 26 480.45 480.17 27 479. 5 480.20 28 479.2 480. 5 29 478. 04 478.92 30 479.88 7 479. 04 31 478.38 4 78 .'1',7 10 477.04 476.83 477.46 13 477. 50 476. 29 15 475.67 16 477.67 17 476.54 18 476.63 19 477. 17 20 477.88 21 477. 25 477. 54 23 477. 29 477 49 ~ 87

I O.

)t

SUMMARY

Reactor Power Level averaged 99.5% UN I T NAME Ginna Station Unittl in the month. Exceptions were a reduction to f <<.tg~

97% level on 9/10 during performance of PT-6.4, October 2 1975 incore-excore calibration", reduction to>96%

level on 9/23 to perform PT-16, Auxiliary Feed-water system flow check. Andrew E. HcNamara, Operations Aide Telephone IP1-716-546-2700, Ext. 291-214 at Ginna REPDRT MDNTH September, 1975 PLANT SHUTDOWNS TYPE METHOD OF F-FORCED DURATION SHUTTING DOWN COMMENTS DATE S-SCHEDULED (HOURS) REASON (I) THE REACTOR (2)

No shutdowns to report (I) REASON: (2) METHOD:

A - EQUIPMENT FAILURE (EXPLAIN) A - MANUAL 8 - MAINT. OR TEST B - MANUAL SCRAM C - REFUELING C - AUTOMATIC SCRAM D - REGULATORY RESTRICTION E - OPERATOR TRAINING AND LICENSE EXAMINATION F - ADMINISTRATIVE G - OPERATIONAL ERROR (EXPLAIN) 49 89