{{#Wiki_filter:9 OPElt AllNG DATA It!.PoltT DOCKET NO. | {{#Wiki_filter:9 OPElt AllNG DATA It!.PoltT DOCKET NO. 50 ')UG DALE 9/5/79 COMPLETI:1) ItY C . C_onne_I 1 | ||
50 ')UG DALE 9/5/79 COMPLETI:1) ItY C . C_onne_I 1 | . TELEPilONE (914) 7.59-0200 OPElt ATING STA7 US Notc5 | ||
.TELEPilONE (914) 7.59-0200 OPElt ATING STA7 US Notc5 1. Unit Name: Tm13an point tio . 3 tioclear Power Plant | : 1. Unit Name: Tm13an point tio . 3 tioclear Power Plant | ||
: 2. Iteportin;: Period: | : 2. Iteportin;: Period: Aucunt - 1970 | ||
: 3. Licensed Thennal Power (MWI): _3025 g , | : 3. Licensed Thennal Power (MWI): _3025 g , | ||
I 1013 | |||
} f | |||
9 U>7. Maximum Dependable Capacity (Net MWe): | : 4. Nameplate Itating (Grou .'.lWe): | ||
: 5. Design Eh ctries!ltatin;;(Net MWel: A N d, l;'If[, | |||
: 6. Maximum Dependabic Capacity (Gross MWe): 1000 9 U> | |||
: 7. Maximum Dependable Capacity (Net MWe): | |||
: 8. If Changes Occur in Capacity itatin;;s (Items Number 3 Throu;;h 7) Since 6st fleport.Give Itcasons: | : 8. If Changes Occur in Capacity itatin;;s (Items Number 3 Throu;;h 7) Since 6st fleport.Give Itcasons: | ||
tione | tione | ||
: 9. Power Level To which flestricted,if Any (Net MWel: None | |||
This Month Yr..to Date Cumulatis e 744 5,831 26,328 II. Ilours in Iteporting Period 715.6 5,622.7 | : 10. Itcasons For itestrictions,if Any: N/A This Month Yr..to Date Cumulatis e 744 5,831 26,328 II. Ilours in Iteporting Period 21,283.6 715.6 5,622.7 | ||
: 12. Number of Ilours Iteactor Was Critical 0 - | |||
: 16. Gross Thermal Energy Cencrated (MWil) 1,618,305 15,138,983 55,539,952 469,420 4,822,830 18,205,601 | 0 O | ||
: 17. Gross Electrical Encr;:y Generated (MWill 447,004 4,643,644 17,492,454 | : 13. Ileactor itesene Shutdown llours __ | ||
: 18. Net Electrical Energy Gen.erated (MWil) 92.4 95.4 78.9 19. Unit Senice f actor | 20,773.3 687.1 5,565.6 | ||
: 14. Ilours Generator On Line 0 0 0 | |||
: 21. Unit Capacity Factor (Usin;:MDC Net) 62.3 82.5 68.9 | : 15. Unit itescne Shutdown llours | ||
~'7.6 1.5 | : 16. Gross Thermal Energy Cencrated (MWil) 1,618,305 15,138,983 55,539,952 469,420 4,822,830 18,205,601 | ||
: 17. Gross Electrical Encr;:y Generated (MWill 447,004 4,643,644 17,492,454 | |||
: 18. Net Electrical Energy Gen.erated (MWil) 92.4 95.4 78.9 | |||
: 19. Unit Senice f actor ~ | |||
92.4 95.4 78.9 | |||
: 20. Unit Availability F.ictor 62.3 82.5 68.9 | |||
: 21. Unit Capacity Factor (Usin;:MDC Net) 62.3 82.5 68.9 | |||
: 22. Unit Capuity factor (Usin;: 1) Cit Net) ~' | |||
4.1 7.6 1.5 | |||
: 23. Unit forced Outage Itate | |||
: 24. Shutdowns Schednicd Ostr Next 6 Months (Type. Date.and Duration of racht: | : 24. Shutdowns Schednicd Ostr Next 6 Months (Type. Date.and Duration of racht: | ||
Pafualin Outaan Sor'tenhor 1979 | Pafualin Outaan Sor'tenhor 1979 | ||
: 25. If Shut Down As End Of Ilepunt Period. f.stimated Date of Startup: | : 25. If Shut Down As End Of Ilepunt Period. f.stimated Date of Startup: | ||
: 26. Units In 1 rst Status (l'aior to Connnercial Oper.itioni: | : 26. Units In 1 rst Status (l'aior to Connnercial Oper.itioni: Forecast Asblesed | ||
Forecast Asblesed , INil l A l. Cill11CA l.ll y | , | ||
INil l A l. Cill11CA l.ll y N __ | |||
INill \ I. F1.1.C 11(101T Y ~ | |||
COM\ll 11CI A 1. Ol'1 It Al lON | |||
l eid s .in P'oi nt t] NIT tio 3 9/5/79 | - | ||
Suird0 g.,p y , | |||
-N UNIT SitUTDOWNS AND POWER REDUCTIONS DOCKET NO. | < D 0918 0 39 7 | ||
50-2A6 iO UNIT N O!E Indian point No. N DATE o/6/79-4 | |||
, | |||
AVI.It AGl: DAILY 11 Nil POWl:It I.EVEL DOCKET NO. 69-2Ef l eid s .in P'oi nt t] NIT tio 3 DATE 9/5/79 | |||
31 790817 F 24.3 A 3 N/A | . | ||
M Ground corrected. | COMP 7.ETED BY C . _C onne 11 TELEPl!ONE 914-739-8200 MONT!! Angu e 1979 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAl: Y POWER LEVEL (MWe Net) (MWe-Net) g 629 37 216 2 627 gg 281 3 657 19 830 4 686- 20 818 5 | ||
32 790821 F 1 A 1 N/A IIP IITEXCII Load reduction due to condenser D leaks, leaks sealed and load restored to normal 33 790831 F 9 A 1 N/A IIF IITEXCII Load reduction due to condenser D leaks, leaks sealed and load restored to normal | 688 21 750 | ||
Method: | - | ||
Entry Sheets for Licensee C.Refucting 3-Automatic Scram. | 686. 716 6 22 7 | ||
Event Report (LER) File (NUREG- | 71r 23 743 8 372. 24 735 0 707 9 | ||
-(9/77)Il Other (Explain) | 10 438 26 703 yg 527 704 7 | ||
Exhibi.li- Same Source | 12 540 700 2S 533 704 13 29 530 09 14 30 533 620 IS 3, 533 34 INSTRUCTIONS P00R01BM On this fornut. list the aserage daily unit power levelin MWe. Net for each day in the reporting anonth.Coinpute to the nearest whole negawatt. - | ||
, | \ | ||
: MONTHLY MAINTENANCE REPCRT August 1979 Month (Q 4 DATE<W.R.#EQUIPMENT MALFUNCTION CORRECTIVE ACTION | - | ||
()C)8-01-79 I-366-02#33 Service Water Pump Repair Pump Replaced purp internals / installed motor, realigned. | (9/771 bb1bh- | ||
8-03-79 I-590-lC#32 Service Water Pump Pump internals problem Replaced worn internals / installed motor, realigned. | |||
8-03-79 I-591-lC#36 Service Water Pump Pump internals problem Replaced worn internals / installed motor, realigned - | - | ||
5-13-79 I-525-02#32 Charging Pump | N UNIT SitUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-2A6 iO UNIT N O!E Indian point No. N DATE o/6/79 -4 REPORT MON 71! August 1979 COMPLETED BY c. connell (914)739-R200 | ||
#1 and #5 cylinders leak Repacked #1 and #5 cylinders 8-13-79 I-546-02 Fuel Receipt N/A Received and stored new elenents 8-03-79 I-588-02#32 Charging Pump Piston leakage Repacked #1-4 cylinders 8-10-79 I-595-1B#31 Main Steam MSIV #31 S/G operator broken Replaced defective operator assembly adjusted linkage 8-24-79 I-675-lC#32 Diesel Generator Lube oil strainers clog $,ed Cleaned oil strainers | @ | ||
, I | TELEPIIONE | ||
,, 4, Month O v9 Date W.R.#Equipment Malfunction Corrective Action 8-13-79 IC-1-427-2 Rl9 PRM Defective meter (remote) | : n. . | ||
Replaced meter (remote) 8-21-79 IC-1-454-2 R15 FRM Defective remote meter Replaced meter 8-22-79 IC-475-18 42 Fower Range Loss of II.V. output detector Replaced li.V. power supply | e c. '5 w5 '""" | ||
.I$I..O | E | ||
.. | *% | ||
On August 8th at 12:35 the unit tripped due to a transformer fault on B & C phase bushings on #31 main transformer. At the time of this trip, the unit had been operating continuously since April 10th at 23:39, setting new site record of 119 days, 12 hours and 56 minutes of operation. The | * Date d. 5 _$ E 7EU a b^" Cause & Corrective 4 3 .E 6 5 3 cc Event p u) U Acijon go oO cd 3 05 y RcPo't 4. o Prevent Recurrence | ||
. O C | |||
On August 17th 'at 10:25, a unit trip occurred due to a ground in the turbine trip circuitry. While .the unit was down #31 main transformer which had been repaired was reconnect'ed and the unit was returned to service on August 18dh at 10:42. | 30 790808 F 32.6 A 3 N/A EG TRANSF Transformer fault on B&C pha.se bushings of #31 main transformer Bushings repaired and Westinghouse checked out transformer. | ||
On August 21st, at 16:00 load was reduced due to the removal of two circulating water pucps because of condenser leaks. | 31 790817 F 24.3 A 3 N/A IIA l RELAYX Ground in turbine trip circuitry. | ||
Load was increased to approximately 780 mw on August 22nd at 2000 after repairs were effected and remained that way until August 31st when condenser leaks again caused a load reduction. Load was reduced to 450 mw. | M Ground corrected. | ||
i.4 o 0O.1.2$}} | 32 790821 F 1 A 1 N/A IIP IITEXCII Load reduction due to condenser D leaks, leaks sealed and load restored to normal 33 790831 F 9 A 1 N/A IIF IITEXCII Load reduction due to condenser D leaks, leaks sealed and load restored to normal s | ||
l I | |||
3 4 F: Forced 2^ Reason: Method: | |||
S: Scheduled A Equipment Failure (Explain) Exhibit F -Instructions 1 Manual for Preparation of Data B. Maintenance of Test 2-Manual Scram. Entry Sheets for Licensee C.Refucting 3-Automatic Scram. | |||
D Regulatory Restriction Event Report (LER) File (NUREG-4 Other(Explaia) 0161) | |||
E Operator Training & License Examination F Administrative 5 | |||
G Operational Error (Explain) | |||
- | |||
(9/77) Il Other (Explain) Exhibi.li- Same Source | |||
, | |||
: | |||
MONTHLY MAINTENANCE REPCRT August 1979 Month (Q 4 | |||
DATE< W.R. # EQUIPMENT MALFUNCTION CORRECTIVE ACTION () | |||
C) 8-01-79 I-366-02 #33 Service Water Pump Repair Pump Replaced purp internals / installed motor, realigned. | |||
8-03-79 I-590-lC #32 Service Water Pump Pump internals problem Replaced worn internals / installed motor, realigned. | |||
8-03-79 I-591-lC #36 Service Water Pump Pump internals problem Replaced worn internals / installed motor, realigned - | |||
5-13-79 I-525-02 #32 Charging Pump #1 and #5 cylinders leak Repacked #1 and #5 cylinders 8-13-79 I-546-02 Fuel Receipt N/A Received and stored new elenents 8-03-79 I-588-02 #32 Charging Pump Piston leakage Repacked #1-4 cylinders 8-10-79 I-595-1B #31 Main Steam MSIV #31 S/G operator broken Replaced defective operator assembly adjusted linkage 8-24-79 I-675-lC #32 Diesel Generator Lube oil strainers clog $,ed Cleaned oil strainers | |||
, | |||
I | |||
l MONTIILY I & C CATEGORY I REPORT gt | |||
'. .O C4 August 1979 ,, 4, Month O v9 Date W.R. # Equipment Malfunction Corrective Action 8-13-79 IC-1-427-2 Rl9 PRM Defective meter (remote) Replaced meter (remote) 8-21-79 IC-1-454-2 R15 FRM Defective remote meter Replaced meter 8-22-79 IC-475-18 42 Fower Range Loss of II.V. output detector Replaced li.V. power supply | |||
. | |||
I | |||
$ | |||
I | |||
. | |||
. | |||
O | |||
- | |||
.. | |||
. | |||
Summary of Operating Experience August - 1979 Indian Point Unit 3 was synchronized to the bus for a total of 744 hours, producing a gross generation of 469,420 mwh for this reporting period. During this period, the unit experienced 2 trips,1 load reduction and the setting of a new site record for continuous operation. | |||
On August 8th at 12:35 the unit tripped due to a transformer fault on B & C phase bushings on #31 main transformer. At the time of this trip, the unit had been operating continuously since April 10th at 23:39, setting ' | |||
new site record of 119 days, 12 hours and 56 minutes of operation. The transformer was isolated and the unit was able to return to service at half load on August 9th at 21:12. On August 17th 'at 10:25, a unit trip occurred due to a ground in the turbine trip circuitry. While .the unit was down #31 main transformer which had been repaired was reconnect'ed and the unit was returned to service on August 18dh at 10:42. | |||
On August 21st, at 16:00 load was reduced due to the removal of two circulating water pucps because of condenser leaks. Load was increased to approximately 780 mw on August 22nd at 2000 after repairs were effected and remained that way until August 31st when condenser leaks again caused a load reduction. Load was reduced to 450 mw. | |||
i | |||
. | |||
4 o | |||
0O.1.2$}} |
Revision as of 15:21, 19 October 2019
ML19208A994 | |
Person / Time | |
---|---|
Site: | Indian Point |
Issue date: | 09/05/1979 |
From: | Connell C POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK |
To: | |
Shared Package | |
ML19208A991 | List: |
References | |
NUDOCS 7909180397 | |
Download: ML19208A994 (6) | |
Text
9 OPElt AllNG DATA It!.PoltT DOCKET NO. 50 ')UG DALE 9/5/79 COMPLETI:1) ItY C . C_onne_I 1
. TELEPilONE (914) 7.59-0200 OPElt ATING STA7 US Notc5
- 1. Unit Name: Tm13an point tio . 3 tioclear Power Plant
- 2. Iteportin;: Period: Aucunt - 1970
- 3. Licensed Thennal Power (MWI): _3025 g ,
I 1013
} f
- 4. Nameplate Itating (Grou .'.lWe):
- 5. Design Eh ctries!ltatin;;(Net MWel: A N d, l;'If[,
- 6. Maximum Dependabic Capacity (Gross MWe): 1000 9 U>
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity itatin;;s (Items Number 3 Throu;;h 7) Since 6st fleport.Give Itcasons:
tione
- 9. Power Level To which flestricted,if Any (Net MWel: None
- 10. Itcasons For itestrictions,if Any: N/A This Month Yr..to Date Cumulatis e 744 5,831 26,328 II. Ilours in Iteporting Period 21,283.6 715.6 5,622.7
- 12. Number of Ilours Iteactor Was Critical 0 -
0 O
- 13. Ileactor itesene Shutdown llours __
20,773.3 687.1 5,565.6
- 14. Ilours Generator On Line 0 0 0
- 15. Unit itescne Shutdown llours
- 16. Gross Thermal Energy Cencrated (MWil) 1,618,305 15,138,983 55,539,952 469,420 4,822,830 18,205,601
- 17. Gross Electrical Encr;:y Generated (MWill 447,004 4,643,644 17,492,454
- 18. Net Electrical Energy Gen.erated (MWil) 92.4 95.4 78.9
- 19. Unit Senice f actor ~
92.4 95.4 78.9
- 20. Unit Availability F.ictor 62.3 82.5 68.9
- 21. Unit Capacity Factor (Usin;:MDC Net) 62.3 82.5 68.9
- 22. Unit Capuity factor (Usin;: 1) Cit Net) ~'
4.1 7.6 1.5
- 23. Unit forced Outage Itate
- 24. Shutdowns Schednicd Ostr Next 6 Months (Type. Date.and Duration of racht:
Pafualin Outaan Sor'tenhor 1979
- 25. If Shut Down As End Of Ilepunt Period. f.stimated Date of Startup:
- 26. Units In 1 rst Status (l'aior to Connnercial Oper.itioni: Forecast Asblesed
,
INil l A l. Cill11CA l.ll y N __
INill \ I. F1.1.C 11(101T Y ~
COM\ll 11CI A 1. Ol'1 It Al lON
-
Suird0 g.,p y ,
< D 0918 0 39 7
,
AVI.It AGl: DAILY 11 Nil POWl:It I.EVEL DOCKET NO. 69-2Ef l eid s .in P'oi nt t] NIT tio 3 DATE 9/5/79
.
COMP 7.ETED BY C . _C onne 11 TELEPl!ONE 914-739-8200 MONT!! Angu e 1979 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAl: Y POWER LEVEL (MWe Net) (MWe-Net) g 629 37 216 2 627 gg 281 3 657 19 830 4 686- 20 818 5
688 21 750
-
686. 716 6 22 7
71r 23 743 8 372. 24 735 0 707 9
10 438 26 703 yg 527 704 7
12 540 700 2S 533 704 13 29 530 09 14 30 533 620 IS 3, 533 34 INSTRUCTIONS P00R01BM On this fornut. list the aserage daily unit power levelin MWe. Net for each day in the reporting anonth.Coinpute to the nearest whole negawatt. -
\
-
(9/771 bb1bh-
-
N UNIT SitUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-2A6 iO UNIT N O!E Indian point No. N DATE o/6/79 -4 REPORT MON 71! August 1979 COMPLETED BY c. connell (914)739-R200
@
TELEPIIONE
- n. .
e c. '5 w5 '"""
E
- %
- Date d. 5 _$ E 7EU a b^" Cause & Corrective 4 3 .E 6 5 3 cc Event p u) U Acijon go oO cd 3 05 y RcPo't 4. o Prevent Recurrence
. O C
30 790808 F 32.6 A 3 N/A EG TRANSF Transformer fault on B&C pha.se bushings of #31 main transformer Bushings repaired and Westinghouse checked out transformer.
31 790817 F 24.3 A 3 N/A IIA l RELAYX Ground in turbine trip circuitry.
M Ground corrected.
32 790821 F 1 A 1 N/A IIP IITEXCII Load reduction due to condenser D leaks, leaks sealed and load restored to normal 33 790831 F 9 A 1 N/A IIF IITEXCII Load reduction due to condenser D leaks, leaks sealed and load restored to normal s
l I
3 4 F: Forced 2^ Reason: Method:
S: Scheduled A Equipment Failure (Explain) Exhibit F -Instructions 1 Manual for Preparation of Data B. Maintenance of Test 2-Manual Scram. Entry Sheets for Licensee C.Refucting 3-Automatic Scram.
D Regulatory Restriction Event Report (LER) File (NUREG-4 Other(Explaia) 0161)
E Operator Training & License Examination F Administrative 5
G Operational Error (Explain)
-
(9/77) Il Other (Explain) Exhibi.li- Same Source
,
MONTHLY MAINTENANCE REPCRT August 1979 Month (Q 4
DATE< W.R. # EQUIPMENT MALFUNCTION CORRECTIVE ACTION ()
C) 8-01-79 I-366-02 #33 Service Water Pump Repair Pump Replaced purp internals / installed motor, realigned.
8-03-79 I-590-lC #32 Service Water Pump Pump internals problem Replaced worn internals / installed motor, realigned.
8-03-79 I-591-lC #36 Service Water Pump Pump internals problem Replaced worn internals / installed motor, realigned -
5-13-79 I-525-02 #32 Charging Pump #1 and #5 cylinders leak Repacked #1 and #5 cylinders 8-13-79 I-546-02 Fuel Receipt N/A Received and stored new elenents 8-03-79 I-588-02 #32 Charging Pump Piston leakage Repacked #1-4 cylinders 8-10-79 I-595-1B #31 Main Steam MSIV #31 S/G operator broken Replaced defective operator assembly adjusted linkage 8-24-79 I-675-lC #32 Diesel Generator Lube oil strainers clog $,ed Cleaned oil strainers
,
I
l MONTIILY I & C CATEGORY I REPORT gt
'. .O C4 August 1979 ,, 4, Month O v9 Date W.R. # Equipment Malfunction Corrective Action 8-13-79 IC-1-427-2 Rl9 PRM Defective meter (remote) Replaced meter (remote) 8-21-79 IC-1-454-2 R15 FRM Defective remote meter Replaced meter 8-22-79 IC-475-18 42 Fower Range Loss of II.V. output detector Replaced li.V. power supply
.
I
$
I
.
.
O
-
..
.
Summary of Operating Experience August - 1979 Indian Point Unit 3 was synchronized to the bus for a total of 744 hours0.00861 days <br />0.207 hours <br />0.00123 weeks <br />2.83092e-4 months <br />, producing a gross generation of 469,420 mwh for this reporting period. During this period, the unit experienced 2 trips,1 load reduction and the setting of a new site record for continuous operation.
On August 8th at 12:35 the unit tripped due to a transformer fault on B & C phase bushings on #31 main transformer. At the time of this trip, the unit had been operating continuously since April 10th at 23:39, setting '
new site record of 119 days, 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and 56 minutes of operation. The transformer was isolated and the unit was able to return to service at half load on August 9th at 21:12. On August 17th 'at 10:25, a unit trip occurred due to a ground in the turbine trip circuitry. While .the unit was down #31 main transformer which had been repaired was reconnect'ed and the unit was returned to service on August 18dh at 10:42.
On August 21st, at 16:00 load was reduced due to the removal of two circulating water pucps because of condenser leaks. Load was increased to approximately 780 mw on August 22nd at 2000 after repairs were effected and remained that way until August 31st when condenser leaks again caused a load reduction. Load was reduced to 450 mw.
i
.
4 o
0O.1.2$