. o OPERATING DATA REPORT

  • DOCKET NO. 50-247 DATE 12-5-85 COMPLETED BY K. Krieger TELEPHONE 914-526-5155 OPERATING STATUS Indian Point Unit #2 Notes
1. Unit Name:

For the year to date, gross

2. Reporting Period: November 1985 2758 electrical generation has
3. Licensed Thermal Power (MWt): exceeded that for the pre-

'4. Nameplate Rating (Gross MWe): 1013 vious record full year (1983)

5. Design Electrical Rating (Net MWe):873
6. Maximum Dependable Capacity (Gross MWe): 900
7. Maximum Dependable Capacity (Net MWe): 864
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:

None

9. Power Level To Which Restricted,If Any (Net MWe): None
10. Reasons For Restrictions,if Any: No ne This Month Yr.-to-Date Cumulative 720 8016 100105
11. Hours In Reporting Period
12. Number Of Hours Reactor Was Critical 720 7787.36 68453.08
13. Reactor Reserve Shutdown Hours 0 152.67 3398.37
14. Hours Generator On-Line 720 7677.41 AAA?7 ni
15. Unit Reserve Shutdown Hours 0 0 n
16. Gross Thermal Energy Generated (MWH) 1855601 20181onn 1799nsus -
17. Gross Electrical Energy Generated (MWH) 572230 _,

6322110 53630726

18. Net Electrical Energy Generated (MWH) 550751 6077638 51191545
19. Unit Service Factor 100 95.8 '66.4
20. Unit Availability Factor 100 95.8 66.4
21. Unit Capacity Factor (Using MDC Net) 88,5 88.6 59.5
22. Unit Capacity Factor (Using DER Net) 87.6 86.8 58.6
23. Unit Forced Outage Rate 0 3.4 o.n
24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Each):

Cycle 7/8 Refueling and Maintenance Outare, scheduled for 1-15-86 nnd n f n 60 day duration

25. If Shut Down At End Of Report Period. Estimated Date of Startup:

/A

26. Units in Test Status (Prior to Commercial Operation): Forecast Achieved

~

INITIAL CRITICALITY INITIAL ELECTRICITY / N/A [

COMMERCIAL OPERATION / /

B512230055 851130 7

/ / <hS y-DR ADOCK 0500

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-247 UNIT IP #2 DATE 12-5-85 E

COMPLETED BY

~

TELEPHONE November 1985 .

MONTH f DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 1MWe-Net) y 840 g7 548 841 805 2 g 3 844 838 19 4 844 833 20 5

843 748 21 6

845 718 22 7

839 836 23 643 841 8 24 827 838 9 25 10 834 209 26 gg 824 146.

27 0lI 12 28 797 804 835 13 29 818 g4 30 834 827 -

15 31 _

16 838 l

INSTRUCTIONS On this format, list the aserage daily unit power level in MWe Net for each day in the reporting inonth. Compute to the nearest whole megawatt.

l (9/77) ,

1 L

v .-

'?

) ..

SU MARY OF OPERATING EXPERIENCE

, November 1985 Unit No. 2 operated at 100% reactor power until Friday, November 8,1985, when load .was reduced to approximately 200 We to facilitate visual

. verification of.a suspected reactor coolant leak at the gasketed cover plate joint on check valve 897D. This particular valve is in the

' discharge line tram No.'24 Safety Injection System Accumulator and is located immediately off the loop cold leg. After confirmation that the

<1eak was at the gasketed joint, load was returned to full power conditions.

With the following exceptions, the unit operated at full load for the remainder of the month:

o On November 12th reactor power was reduced to 90% as a result of higher than normal Steam Generator Chlorides. Power was returned to 100% on November 13th.

c,-- s o On November 17th reactor power was reduced to 64% to allow the cleaning of the tubes'in #23 Condenser.

f 1

k'

o On November 21st reactor power was reduced to 74% to allow -

shutdown of 22 MBFP (Main Boiler Feed Pump) to replace a leaking.

s hose in the high pressure control oil system. Power was returned to 100% on November 22nd.

o On November 26th reactor power was reduced to 15% to reduce radiation fields within containment to allow verification of qualified electrical equipment. Power was returned to 100% on November 28th.

, . , , , _ . e , < , . . . .m.~,,. , . - - . . - , ,s.. _ _ . . . , .- -- ..m._ -.- - . , _,,

U 50-247 DOCKET NO.

UNITSHUTDOWNS AND POWER REDUCTIONS IP #2 UNIT NAME DATE 19 4 95 November 1985 COMPLETED BY v vh a ea >-

REPORT MONTH TELEPHONE 914-990siss

_ 5 E

- .{ g 3 j .E h Licensee ,Eg . Cause & Corrective No. Date g 'd g  % yss Event g7 {"?

gU Action to H

f5 5 j;gg Report 2r. mo g Prevent Recurrence d5 N/A 85 11 08 S 0 H N/A N/A SD Valvex B Controlled load reduction to verify source of increased RCS leakage N/A 85 11 17 S 0 H N/A N/A HC IITexch D Condenser cleaning N/A 85 11 26 S 0 B N/A N/A IE SLECON Controlled load reduction to facilitat 2 verification of qualified electrical 8"

' equipment within vapor containment 85 11 27 building i 2 3 4 F: Forced Reason: Method: Exhibit G - Instructions S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance of Test 2-Manual Scram. Entry Sheets for Licensee C-Refueling 3-Automatic Scram. Event Report (LER) File (NUREG-D-Regulatory Restriction 4-Other (Explain) 0161)

E-Operator Training & License Examination F-Adininistrative 5 G-Operational Error (Explain) Exhibit I - Same Source 19/77) II-Ott er (Explain)

~ .

MAJOR SAFEIT-RELATED CORRECTIVE MAINTENANCE November 1985 WR NO. SYSTEM COMPONENT DATE WORK PEPSORMED 23042 RVLIS Level Transmitters 11/27/85 Replaced existing LT-1311, 1312, 1321 transmitters with 1322 qualified transmitters 20278- ELEC Terminal Blocks, 11/30/85 Replaced terminal "T" Drains, blocks with qual-Terminal Box ified blocks, Seals and' Drains Installed "T" Drains on valve motor operators and installed terminal block box cover seals and drains 5

s-

  • - J:hn D. O'Toob

%ce Presx1ent Consolidated Ed: son Company of New Ycrk. loc.

4 Irying Piace, New York, NY 10003 Telephone (212) 460 2533 December 16, 1985 Re: Indian Point Unit No. 2 Docket No. 50-247 Mr. James M. Taylor, Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D.-C. 20555 ATIN: Document Control Desk

Dear Sir:

Enclosed are twelve copies of the Monthly Operatirg Report for Indian Point Unit No. 2 for the month of November 1985.

Ver[ truly youys, jL , ff(C_

Encl.

cc: Dr. Thomas E. Murley, Regional Administrator Region I U. S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, Pa. 19406 Senior Resident Inspector U. S. Nuclear Regulatory Commission P. O. Box 38 Buchanan, New York 10511

?

i r

l 9 i

( . _ _ _ _ _ _ _ - - _ - _ _ _ - _ - _ _ - _ - _ _ _ _ _ -