OPERATLNG DATA REPORT DOCKET NO. 50-247 DATE 3-6-87 COMPLETED BY K. Kriester TELEPHONE (01 M 976-5155 OPERATING STATUS Indian Point Unit No. 2 Notes

1. Unit Name:
2. Reporting Period: February 1987
3. Licensed Thermal Power (MWt): 779R
4. Nameplate Rating (Gross MWe): 1013
5. Design Electrical Rating (Net MWe): 873
6. Maximum Dependable Capacity (Gross MWe): 900
7. Maximum Dependable Capacity (Net MWe): 864
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Gise Reasons:

None

9. Power Level To Which Restricted.lf Any (Net MWe): None
10. Reasons For Restrictions.lf Any: N/A This Month Yr. to-Date Cumulative i1. Hours In Reporting Period 672 1416 111025
12. Number Of Hours Reactor Was Critical AA1 AR 1170 75 75A%1 A9
13. Reactor Resene Shutdown Hours s1.50 79.43 3768.50
14. Hours Generator On.Line 450.90 1168.97 73232.66
15. Unit Reserve Shutdown Hours 0 0 0
16. Gross Thermal Energy Generated (MWH) 1160875 3038678 190756254 .
17. Gross Electrical Energy Generated (MWH) 368990 ~

963490 59220256

18. Net Electrical Energy Generated (MWH) 350503 923065 56513647 67.1 82.6 66.0
19. Unit Service Factor
20. Unit Availability Factor 67.1 82.6 66.0
21. Unit Capacity Factor (Using MDC Net) 60.4 75.4 62.1
22. Unit Capacity Factor IUsing DER Net) 59.7 74.7 61.1
23. Unit Forced Outage Rate 11.2 4.6 9.1
24. Shutdowns Scheduled Oser Next 6 Months (Type. Date,and Duration of Each):
25. If Shut Down At End Of Report Period. Estimated Date of Startup:
26. Units In Test Status IPrior to Commercial Operation): Forecast Achiesed INITIAL CRITICALITY INITIAL ELECTRICITY \ N/A \

COM\lERCIA L OPER ATION \ \

8703230234 870228 '

PDR ADOCK 05000247 49j77 3 R PDR g t L

o AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-247 UNIT IP Unit #2 DATE 3-6-87 K. Krieger COMPLETED BY i

(914) 526-5155 TELEPilONE FEBRUARY 1987 MONT11 DAY AVERAGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL (MWe Net) IMWe Net)

, 0 848 0 862 2 18 0 865 3 19 4 867 20 5

0 863 21 6

0 862 22 7

0 863 23 g

705 8M 24 853 #

9 25 790 835 10 26 0 701

27 0 713 12 28 13 169 -

- 29 14 656 ~

30 15 711 31 16 629 INSTRUCTIONS On this format, list the average daily unit power levelin MWe Net for each day in the reporting month. Compute to the nearest whole megawatt.

(9/77i

DOCKET NO. 50-247 ,

UNIT SHUTDOWNS AND POWER REDUCTIONS IP Unit #2 UNIT N AME DATE 3-6-87 K. Krieger Feb. 1987 COMPLETED BY _

REPORT MONTH ' TELEPHONE (914)S26-5153 c

e ,, '= -. 5

% .E E E ~_4 E Eicensee E

,-t., 5"t Cauw & Corrective W. Date 3g 4 ,g g 5 E-ent ?7 E? Action to i

" 12 0 0 Present Recurrence E Report e c5 5 [5g 6

1 HA Genera Scheduled outage to inspect 1 870117 S 154.47 H -

D generator 3 87-004 IA Instru Operator Error 2 870210 F 56.63 G E

O B 4 HB Valve F Turbine stop valve testing and high N/A 870227 S steam generator chlorides l

l

{

l I 2 3' 4 F: Forced Reason: Method: Exhil'it G-Instructions 5: Scheduled A-Equipment Failure (Explain) 1 Manual for Preparation of Data B-Maintenance of Test 2 Manual Scram. Entry Shects for I.ieensec C-Refueling 3- Automatic Scram. Esent Report ILI R1 File INURI:G-l D-Regulatory Restriction 4-Oiher IExplain) 01611 E-Operator Training & Ucense Examination F-Administrative 5 Eshibit I- Same Source l G-Operational Error (Explain) pl/77) H-Oiher (Explain) i

MAJOR SAFCTY RELATED CORRECTIVE Maintenance

[1t[0 SYSTEM COMPONENT DATE WdRK PERFORMED 20928 EDG 21 EDG 12-30-86 Replaced compressor-26665 CCW 21 CC Pump 12-08-86 Replaced Rot. Element 26122 CVCS 2048 Valve 12-31-86 Remade Donnet Joint 26386 CVCS 22 RHR Pump 12-10-86 Welded in New Nipple 27/97 CVCS 21 Seal Inj FLTR 12-19-86 Replaced 0 Ring 18264 MS. PCV 1310 B 12-06-86 Repacked Value 27454 CVCS 21 BATP 12-11-86 Repaired Seal 26254 CVCS 22 RHR PUMP 12-10-86 Repacked Pump 24936 RilR 22 RHR' Pump 12-18-86 Installed Seal 21805 CVCS 23 RHR Pump 12-30-86 Repacked Pump 233/3 CR0 23 CRD Fan 12-08-86 Replaced Motor 26667 . Riffs 21 RRR Pump 12-26-86 Replaced Seal i

4

_w

FEBRUARY 1987 5UMMARY OF OPERATING EXPERIENCE Unit No. 2 was returned to service on February 7, 1987 following an eight l day outage to inspect the main electric generator. Full load operation was resumed the following day.

On February 10, 1987 the Unit tripped automatically from full load as a result of an operator error during a tag-out clearance for No. 22 emergency diesel generator. The unit was returned to service on February 13, and with the exception of a load reduction to approximately 335 MWe on February 27, 1987 for turbine stop valve testing, operated at or near full load for the remainder of the montti.

Murray Selman 4

i Vce President Consolidated Edison Company of New York, Inc.

Indian Point Station Broadway & Bieakley Avenue Buchanan, NY 10511 Te!ephone (914) 73/-8116 March 15, 1987 Re: Indian Point Unit No. 2 Docket No. 50-247 Director, Office of Management and Program Analysis U.S. Nuclear Regulatory Commission Washington, DC 20555

Dear Sir:

Enclosed are twelve copies of the Monthly Operating Report for Indian Point Unit No. 2 for the month of February 1987 Very truly yours, W Wh - __ -

19.251.2.11.3 Enclosure cc: Dr. Thomas E. Murley Regional Administrator - Region I U.S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, PA 19406 Senior Resident Inspector U.S. Nuclear Regulatory Commission P.O. Box 38 Buchanan, NY 10511

'\

m