OPERATING DATA REPORT DOCKET NO. 50-286 DATE '- k n 6 COMPLETED BY L- reliv_

TELEPHONE (914) 739-8200 OPERATING STATUS Notes

1. Unit Name: Indian Point No. 3 Nuclear Power Plant January 1986
2. Reporting Period:
3. Licensed Thermal Power (MWt): 3025
4. Nameplate Rating (Gross MWe): 1013 ,
5. Desi;;n Electrical Rating (Net MWe): 965
6. Maximum Dependable Capacity (Gross MWe): 1000
7. Maximum Dependable Capacity (Net MWe): 965
8. If Changes Occur in Capacity Ratingi(Items Number 3 Through 7) Since Last Report. Give Reasons:
9. Power Level To which Restricted,If Any (Net MWe):
10. Reasons For Restrictions.lf Any:

This Month Yr..to.Date Cumulative 744 744 82,609

11. Hours in Reporting Period 744 744 48,011.3n
12. Number Of Hours Reactor Was Critical
13. Reactor Reserve Shutdown Hours 0 0 0 744 744 46,377.30
11. Hours Generator On.Line n 0 0
15. Unit Reserve Shutdown Hours
16. Gross T;iermal Energy Generated (MWH) 2.254.965.n9 2,254,965.89 123,032,741.0
17. Gross Electrical Energy Generated (MWH) 749.160 748,160 38,312,69s 723,Ano 723,800 36,738,439
18. Net Electrical Energy Generated (MWHi _
19. Unit Service Factor inn n 100.o 56.1
20. Unit Availability Factor 100.0 100.0 gn 1
21. Unit Capacity Factor (Using MDC Net) loo.n 100.n 4r.12 *
22. Unit Capacity Factor (Using DER Net) 100.8 100.a 46.1 00 00 1 19 4
23. Unit Forced Outage Rate
24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Eacht:
  • Weighted Average Steam Generator Inspection Outage Est. Pfid April,1986 25 If Shut Down At End Of Report Period. Estimated Date of Startup:

26 Units In Test Status (Prior to Commercial Operation): Forecast Achieved INITIAL CRITICAllTY INITIAL ELECTRICITY COMMERCIAL OPER ATION i

8602240651 860131 PDR ADOCK 05000286 pm I

R \\

AVERAGE DAILY UNIT POWER LEVEL ,

DOCKET NO. 50-286 Indian Point UNIT No. 3 DATE 2-3-86 COMPLETED BY L. Kelly TELEPHONE (914) 739-8200 MONTH January 1986 DAY AVERAGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL (MWe. Net) i MWe. Net )

g 974 972 37 973 gg 972 2

3 973 39 973 4 972 20 972 5

973 21 974 6 971 22 972 7

974 23 973 8 471 24 974 9 973 23 975 g

974 974 10 26 974 973 i gg 3 12 973 28 973 l3 972 29 972 l4 973 971 30 15 974 31 972 0 16 971 INSTRUCTIONS

, On this format list the average daily unit power levelin MWe. Net for each day in the reporting anonth. Compute to k the nearest whole megawatt.

~*

(9/77i

e , i,  ! *, J. 'i 4 'i j <' -i l I J'

/

7 7

SF N

) .'e .

SF c o l

ec le r

N

  • ud t O e N d E I

, b s

e 2

I l

- - GFliDCBAR

- - - - - e Hh-OOAORRMEa s p dp e e a q s hemreg fiu o r a ial e tpu; unin er ii ens ai l ee

(

Eoiwes t

t wg ae nnn [E! .

ans pa a Ty nn EgE cs l ll s a i a e F iEviR nn ene oa fi is

) ir nt s l

g Tur I

gi As c ee s

t( 5(3 E i o

x L E p in x l c p ai e l 2Ejy -

n ns ai

) e )

n g jgY U E

j N

x 6gc y3E.n I T

a m S i

n i

- R l

- a E O m i s

1 P T w

e c Ei c L O D s r R O w ew en 'W w nse T t t M N

  1. e S O

N

^

./

D N 3 I D .

P J O .

432iM e

.~

mg E. a W -

OAMMs e O?, n u E ht uaah nn a R eomlaa; r uudu r y

R

(

l a l E i t micc S 1 D .

pl r uh6g*c 9 U aSa -

8 C ic n s r i

a.

i O3.* 6 T I

) O

m. N

. S 5 4 I

s 01 I l I 1

4 n. s' ox: /

P ie v

C a

u I'

E

" U I

l 6ei l e ii i

i 1 1 nsy iP.i t h tnAwc l.

E- NM i

l i ei t E

Ri o R Sp PDl H N1 i

s eia l

e sn C )

i

- c pieu- -

c ut o

n O AA l' S u sn enl r oec n N a

n s e r e

~

EUT EM E .o g

t l

fmu i

n ou t n c

t i

v 1' i S

I I fi e e 1 n 1 . c <

o 4 in 0scea Dti o -

H n

c 1 nin '

1' 2 S e l e

e e s ais 3 ^

3

- n o .

(

e 9 -

- 2 N 8 8 m i

l R

2 6 i n N.

0 e I: 0 G- . m 3 .

I

7 MONTHLY MAINTFNANCE CATEGORY I REPORT January 1986 MONTH WR# DATE EQUIPMENT MALFUNCTION CORRECTIVE ACTION 7602 01/02/86 Waste Lisposal System, Component cooling water leaks Tightened gland bolts.

  1. 31 Waste Gas Compressor through shaft seal.

7195 01/07/86 Reactor Coolant System, Breaker inoperable. Repaired breaker.

  1. 31 Backup Pressurizer Heater Breaker 7591 01/09/86 Radiation Monitoring System, Pump trips out on thermal Repaired pump.

Channel I Iodine Monitor overload.

7603 01/15/86 Electrical Heat Trace, Open circuit. Repaired circuit.

R.W.S.T. Freeze Protection Panel 34, Section A, Circuit 3

! 7685 01/23/85 Chemical and Volume Control Seals leak. Repacked pump seals.

  1. 33 Charging Pump 7344 01/24/86 Steam Generator Blowdown Sample valve leaks. Repacked valve.

Sample Valve SGBD-8 6671 01/27/86 Chemical and Volume Control, Valve will not fully shut. Installed new valve assembly.

  1. 32 Deborating Demineralizer Valve - 316C 5458 01/27/86 Waste Disposal, Small Gas Valve inoperable. Installed new valve assembly.

Decay Tanh 32A, PIA-1052 Isolation Valve 7732 01/30/85 #32 Auxiliary Feedwater Pump Body to bonnet leak. Installed new body to bonnet Steam Supply Valve MS-54 gasket.

MONTHLY I & C CATEGORY I REPORT January 1986 MONTH WR# DATE EQUIPMENT MALFUNCTION CORRECTIVE ACTION 4981 01/08/86 Radiation Monitoring System, Filter paper drive motor seized. Replaced motor.

Plant Vent Particulate Detector R-13 4991 01/10/86 Auxiliary Boiler Feedwater, Controller out of calibration. Recalibrated controller.

Flow Control Valve FCV-405B Controller 4941 01/10/86 Diesel Generator Service No indication of valve position Readjusted roller to activate Water Limit Switch in Control Room. limit switch.

Valve 1276A 4952 01/10/86 Component Cooling Rad. Failed low. Installed new drawer.

Monitor R-17B 4822 01/10/86 Radiation Monitoring System, Test position reads too high. Calibrated unit.

Steam Generator Blowdown R-19 5009 01/13/86 Safety Injection System, Bistable out of calibration. Recalibrated bistable.

  1. 33 Accumulator Hi pressure Alarm 4394 01/13/86 Steam Line Pressure Current Magnetic amplifier not providing Replaced magnetic amplifier.

Repeater PM-449C isolation.

4620 01/13/86 Feedwater Flow Indicator Indicator sticking. Readjusted pointer.

428A 4820 01/13/86 Radiation Monitoring System Test position reads too high. Calibrated.

(Component Cooling Water)

Monitor R-17B 4882 01/13/86 Temperature Controller Controller inoperable. Replaced controller.

TC-130 (letdown temp.)

4921 01/13/86- 34 RCP Seal Injection Inlet Indicator failed high. PLplaced R/I converter.

Temperature Indicator TI-152

1 MONTHLY I & C CATEGORY I REPORT l

l January 1986 4

MONTH WRf -DATE EQUIPMENT MALFUNCTION CORRECTIVE ACTION 4

4939 01/13/86 33 Static Inverter Fuse A2F1 open and transformer . Replaced. fuse and. repaired T902 secondary side shorted. transformer.

i 4995: 01/14/86 Radiation Monitoring Systems, Broken relay contact. Replaced relay.

Rad. Waste Gas Monitor R-20 4547- 01/20/86 Relay 1/MT1-XB Relay sticking during Replaced relay.

(Manual trip in train B) post-modification retest.

l 4940 01/21/86' C.C.R. Air Conditioning Out of calibration due to Calibrated controller.

l Controller PC-1296 drift.

4938 01/24/86' Exhaust Fan Temperature Temperature indicates low. Reinstalled linkage.

Controller 319 for 33 q Diesel Generator 5095 '1/28/86- Radiation Monitoring System, . Filter paper drive motor . Replaced paper drive motor.

Vapor Containment' blows fuse.

Particulate and Gas Monitor C R-11 and R-12 i

)

l

- s s

d

+

~~ y n ~ m e mw , n J

T; - . . . -

SUMMARY

OF OPERATING EXPERIENCE JANUARY 1986 4

Indian Point Unit 3 was synchronized to the bus for a total of 744 hours0.00861 days <br />0.207 hours <br />0.00123 weeks <br />2.83092e-4 months <br /> producing a gross generation of 748,160 MWe for-this reporting period.

The unit remained on line for - the . entire reporting period .

without experiencing any trips or reportable load reductions.

Z U

d J

i a

e 4

- - _ _ _ _ _ _ _ - _ . ..-__._:_.___-______-:___-_______-__-_--_..--___L_-___-_n

Indian Point 3 Nuclear Powee Plant P.O. Boa 215 Buchanan, NewWrk 10511 914 739.8200

  1. > NewWrkPbwer 4F Authority February 14, 1986 WAJ-IP3-013Z LK-IP3-035H Docket No. 50-286 License No. DPR-64 Director, Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Attention: Document Control Desk

Dear Sir:

Enclosed you will find twelve copies of the monthly operating report relating to Indian Point 3 Nuclear Power Plant for the month of January 1986.

Very truly yours, h J' h/h Willi . Josi er Re,sident

(

1.K/aa analr En g es (12 copies) cc: Dr. Thomas E. Murley, Regional Administrator Region 1 U.S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, Pennsylvania 19406 IP3 Resident Inspectors' Office George Wilverding (SRC), WPO J.C. Brons, WPO S.V. Fuller, NYO W.R. Yario, NYO INPO Records Center Suite 1500 1100 Circle 75 Parkway Atlanta, Georgia 30339 5