ML20209J080
| ML20209J080 | |
| Person / Time | |
|---|---|
| Site: | Indian Point |
| Issue date: | 08/31/1986 |
| From: | Josiger W, Kelly L POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK |
| To: | NRC OFFICE OF ADMINISTRATION (ADM), NRC OFFICE OF INSPECTION & ENFORCEMENT (IE) |
| References | |
| IP3-LMK-201H, IP3-WAJ-0447Z, IP3-WAJ-447Z, NUDOCS 8609160146 | |
| Download: ML20209J080 (13) | |
Text
.
OPERATING DATA REPORT Docket No.
50-286 j
Date 09-02-86 Completed By L. Kelly Telephone 914-739-8200 i
OPERATING STATUS 1.
Unit Name:
Indian Point No. 3 Nuclear Power Plant Notes
- 2. - Raporting Period:
August 1986 3.
Licensed Thermal Power (MWt):
3025 4
4.
Nameplate Rating (Gross MWe):
1013 5.
Dasign Electrical Rating (Net MWe):
965 6.
Mxximum Dependable Capacity (Gross MWe):
1000 7.- Maximum Dependable Capacity (Net MWe):
965 8.
If Changes Occur in Capacity Ratings (Items Number 3 through 7) Since Last Report.
Give Reasons:
l 9.
Power Level to Which Restricted, If Any (Net MWe): 930 Net'MWe i
10.
Reasons for Restrictions, If Any:
- 31 Low pressure turbine was modified by replacing
{ two rows of blades with baffle assemblies.
This Month Yr. to Date Cumulative 11.
Hours In Reporting Period 744 5,831 87,696 12.-
Number of Hours Reactor Was Critical 0
3,788.64 51,056.02
- 13. Reactor Reserve Shutdown Hours 0
0 0
.14. Hours Generator On-Line 0
3,696.59 49,329.56 15.
Unit Reserve Shutdown Hours 0
0 0
- 16. Gross Thermal Energy Generated (MWH).
0 9,823,106.24 130,600,881.4 17.
Gross Electrical Energy Generated (MWH) 0 3,212,310 40,776,845 1
18.
Net Electrical Generated (MWH) 0 37091,533 **
39,106,172**
i 19.
Unit Service Factor 0
63.4 56.3
(
20.
Unit Availability Factor 0
63.4 56.3 21.
Unit Capacity Factor (Using MDC Net) 0 54.9 48.1*
- 22. Unit Capacity Factor (Using DER Net) 0 54.9 46.2
- 23. Unit Forced Outage Rate 100 29.6 20.5 24.
Shutdowns Scheduled Over Next 6 Months (Type,Date,and Duration of Each):
I I
25.
If Shut Down at End of Report Period. Estimated Date of Startup: Est. September 1986
- 26. Units In Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION Weighted Average Corrected 60 MWe May '86 reporting error.
r]$
[
k 8609160146 860831 l
je AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-286 UNIT IP-3 DATE 9-2-86 COMPLETED BY L. Kelly TELEPHONE (914) 739-8200 MONTH August 1986 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER iEVEL (MWe-Net)
(MWe-Net) 1 0
17 0
2 0
18 0
3 0
19 0
4 0
20 0
5 0
21 0
6 0
22 0
7 0
23 0
8 0
24 0
9 0
25 0
10 0
26 0
11 0
27 0
12 0
28 0
13 0
29 0
14 0
30 0
l 15 0
31 0
16 0
INSTRUCTIONS:
k On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
' " ~ " ' '
IMM'KEI '30-LINI X Silull> OWNS /.ND POWER REDlMTIONS ilNil' N AME t i"li an tnin' "1
1 DAIE 9-3-86
~
COMPLE I ED itY L-Kellv REPOR l' MON Ill
^ " g " e i-1986 I El.ErilONL 's I.1-l 't )-H20ta
' i "i
E
=.
re
'5 u, =
g *,,
rauw & Ceniective E '4 Licensee c
2e E
y N. e D.d e Q
3g g
jg5 Event
??
Q Atenen to I?stmei *
- E 0 Picscus Recnisence
$3 5
jdg 6
09 860705 F
744 A
1 NA NA NA Turbine Maintenance Outage.
i i
J s
i 2
3 4
I hused Re.ison:
Meiliod:
1 xlului 1.
Instinctions S S61ied uled A-l'iguipment I;.iiluse ilmpl.iin) i Manual I.o l* cpas.esion os 1). iia It Maintenance oi Test 2 Minual Sesam.
I nisy Slieces sin 1.nemce C Refueling
.l-Autannalic Sci.im.
tweni Rep nl il i RIl~ile INiiRI G-D Regulatiny Restancison 4-Othes I Explain) ogni) l-Opes.eson ~lsaining & Latense l uminais<m 1 AJminisses.asive i
G Open.inional I isen ll!aplain)
I sinina ll-S.ime Sunce l's/H) ll Ollien (lisplaisi)
---.--...u MONTHLY I & C CATEGORY I REPORT August 1986 MONTH WR#
DATE EQUIPMENT MALFUNCTION CORRECTIVE ACTION 5862 8/1/86 Plant Vent Particulate Filter drive not operating.
Tightened gears in filter Radiation Monitor R-13 drive.
5873 8/1/86 Auxiliary Boiler Feedpump Circuit breaker does not isolate.
Rewired circuitry.
No. 33 Recirculation Valve 5842 8/2/86 Steam Generator Low Level Bistable drifting.
Replaced bistable.
Mismatch Channel No. 4 LC-447G ~
5897 8/8/86 Administration Building Mylar on detector torn.
Replaced detector.
Radiation Gas Monitor R-46 5939 8/20/86 Charging Valve HCV-142 Valve stroke modified.
Calibrated valve positioner.
5854 8/23/86 Isolation Amplifiers Electronic degradation.
Rebuilt and calibrated.
3PM-421A, 3LM-427C, 3LM-437C, 3FM-414, 3FM-424, 3FM-434, 3FM-444 5855 8/23/86 Isolation Amplifiers Electronic degradation.
Rebuilt and calibrated.
3FM-438C, 3FM-438D, 3FM-448C, 3FM-448D, 3FM-439F, 3FM-439G, 3FM-439K, 3PM-439A, 3PM-449A, 3PM-449F, 3PM-449G, 3PM-449K
MONTHLY I & C CATEGORY I REPORT August 1986 MONTH WRi DATE EQUIPMENT MALFUNCTION CORRECTIVE ACTION l
5885 8/25/86 Isolation Amplifiers Electronic degradation.
Rebuilt and calibrated.
3LM-417B, 3LM-427B, 3LM-437B, 3LM-447B, 3PM-429C, 3PM-439C 5886 8/25/86 Isolation Amplifiers Electronic degradation.
Rebuilt and calibrated.
3TM-432C, 3TM-432F, 3TM-432G, 3PM-457A, 3LM-461A
~
MONTHLY MAINTENANCE CATEGORY I REPORT August 1986 MONTH WR#
DATE EQUIPMENT MALFUNCTION CORRECTIVE ACTION 8663 8/28/86 Auxiliary Feedwater Terminal block and conduit Replaced terminal block 8674 Pressure Transmitters, needs replacing.
and conduit.
8675 PT-1260 thru 1266, PT-1126 8663 8/28/86 Auxiliary Feedwater Terminal block and conduit Replaced terminal block thru Flow Transmitters, needs replacing.
and conduit.
8666 FT-1200 thru 1203, 8671 1205 8664 8/28/86 Auxiliary Feedwater Terminal block and conduit Replaced terminal block thru Pressure Transmitter, needs replacing, and conduit.
8666 PT-1181 - 1184 8671 8840-8/28/86 Safety Injection Pump Junction box gasket needs Replaced junction box 8841 Pressure Transmitters replacing, gasket.
PT-922 and PT-923 8896 8/28/86 Safety Injection System, Motor leads need repair.
Respliced motor leads.
Valve MOV-1802B 8854 8/28/86 Auxiliary Feedwater System, Splice needs repair.
Installed Raychem splice.
Solenoid Valve S0V-1258 8906 8/29/86 Post Accident Sampling Wires need repair.
Repaired wires.
System, Solenoid Valve SOV-510 8845 8/29/86 Nitrogen Valve PCV-550 Splice needs repair.
Repaired splice.
8872 8/29/86 Auxiliary Feedwater Terminal block needs replacing.
Replaced terminal block.
8873 Flow Transmitters, FT-418A thru 448A, FT-418B thru448B
MONTHLY MAINTENANCE CATEGORY I REPORT August 1986 MONTH WR#
DATE EQUIPMENT MALFUNCTION CORRECTIVE ACTION 8870 8/30/86 Pipe Trench Area Wires need replacing.
Replaced wires.
8871 Temperature Controller, 8869 TC-1163S, 1164S, 1165S 8894 8/30/86 Auxiliary Feedwater Needs new temperature Replaced temperature switch.
Temperature Controller switch.
TC-1112S 8833 8/29/86
- 31 Residual Heat Exchanger Splice needs repair.
Repaired splice.
Discharge Valve HCV-638 8860 8/29/86 Containment Isolation Wires need repair.
Replaced wires on limit switch, thru Valves for Post Accident 8866 Sampling System PCV-1235 8907 thru 1241 8821 8885 8/29/86 Auxiliary Coolant System, Wires to solenoid valve Replaced wires.
Valve MOV-791 need replacing.
8857 8/29/86 Steam Generator Blowdown, Solenoid valve needs replacing.
Replaced solenoid valve.
Isolation Valve PCV-1216 8843 8/29/86 Reactor Coolant System, Wires need replacing Replaced wires.
Primary Water Supply to Pressurizer Relief Tank, SOV-552 8824 8/30/86 Instrument Air Closed Seal leak and high vibrations.
Rebuilt pump.
Cooling Pump No. 32 8768 8/31/86 Component Cooling Water High vibrations.
Replaced bearings.
Pump No. 32 8008-8/31/86 Safety Injection Valves Motor connection requires Taped motor connection 8909 843 and 1835B taping.
with silicone tape.
MONTHLY MAINTENANCE CATEGORY I REPORT August 1986 MONTH WR#
DATE EQUIPMENT MALFUNCTION CORRECTIVE ACTION 8948-8/31/86 Recirculation Sump Pumps Motor connection requires Taped motor connection 8949 31 and 32 taping.
with silicone tape.
8816-8/31/86 Containment High Range Cable needs heat shrinking.
Heat shrink tubing i
8817 Radiation Monitors applied.
R-25 and and R-26 i
j 8913 8/31/86 Safety Injection Valve Motor connection requires Taped motor connection l
MOV-1810 taping.
with silicone tape.
8914 8/31/86 Auxiliary Coolant Valve Motor connection requires Taped motor connection MOV-222 taping.
with silicone tape.
I 8915 8/31/86 Safety Injection Valve Motor connection requires Taped motor connection MOV-887A taping.
with silicone tape.
8919 8/31/86 Safety Injection Valve Motor connection requires Taped motor connection MOV-851A taping.
with silicone tape.
8934 8/31/86 Component Cooling Valve Motor connection requires Taped motor connection MOV-822A taping.
with silicone tape.
8938 8/31/86 Fan Cooler Unit Dousing Motor connection requires Taped motor connection Valves 880D, 880F, 880H taping.
with silicone tape.
8944-8/31/86 Residual Heat Removal Motor connection requires Taped motor connection 8945 Pumps 31 and 32 taping.
with silicone tape.
I 8940-8/31/86 Auxiliary Feedwater Pumps Motor connection requires Taped motor connection 8941 31 and 33 taping.
with silicone tape.
8923-8/31/86 Fan Cooler Units 31 - 35 Motor connection requires Taped motor connection i
8927 taping.
with silicone tape.
J l
8928-8/31/86 Containment Level Motor connection requires Taped motor connection l
8933 Transmitters LT 1251 taping.
with silicone tape.
- 1256 I
MONTHLY MAINTENANCE CATEGORY I REPORT August 1986 MONTH WRP DATE EQUIPMENT MALFUNCTION CORRECTIVE ACTION 8655 8/6/86 Component Cooling Water Seal leaks.
Rebuilt pump.
Pump No. 32 8687 8/15/86 Charging Valve HCV-142 Valve needs stroke adjustment.
Rebuilt valve.
8430 8/23/86 Instrument Air Closed Packing leakage.
Rebuilt pump.
Cooling Pump No. 31 l
8471 8/26/86 Auxiliary Feedwater Valve Valve leaks through.
Replaced valve internals.
FCV-406A 8667-8/27/86 Main Steam Pressure Terminal block needs replacing.
Replaced terminal block 8670 Transmitters, PT-419A, and installed new butt thru 449A.PT-419B splice.
thru 449B,PT-419C thru 449C 8800-8/27/86 Steam Generator Blowdowm, Solenoid valves need replacing.
Replaced solenoid valves 8807 Solenoid Valves, SOV-1314 and sealed.
thru SOV-1317, SOV-1314A, thru SOV-1317A s
8825 8/27/86 Reactor Coolant System, Motor leads and Sealtight Replaced motor leads and MOV-536 needs replacing, and sealed.
8830 8/27/86 Reactor Coolant System, Motor leads and Sealtight Replaced motor leads and MOV-535 needs replacing.
sealed.
8847-8/28/86 Auxiliary Feedwater Needs new splice.
Installed Raychem splice.
8848 Pressure Transmitters PT-406A, PT-406B 8662 8/28/86 Auxiliary Feedwater Terminal block and conduit Replaced terminal block 8663 Pressure Transmitters, needs replacing.
and conduit.
8674 PT-1163 thru 1166 8675 1
j MONTHLY MAINTENANCE CATECORY I REPORT l4 August '1986 MONTH i
WR#
DATE EQUIPMENT MALFUNCTION CORRECTIVE ACTION 8942-8/31/86 Hydrogen Recombiners Motor connection requires Taped motor connection 8943 31 and 32 taping.
with silicone tape, i
8910-8/31/86 Auxiliary Coolant Valves Motor connection requires Taped motor connection 8912 784, 786, 789 taping.
with silicone tape.
l 8916 8/31/86 Safety Injection Pumps Motor connection requires Installed appropriate 1
31, 32 and 33 covering.
covers for pumps motor 1
connections.
1 j
8905 8/31/86 Acoustic Monitor W30 Junction box requires relocating.
Relocated junction box.
8812 8/31/86 Acoustic Monitor W31 Cable heat shrink needs repair.
Reshrunk cable heat shrink.
j 8822 8/31/86 Solenoid Operator 1428 Requires Raychem splice.
Installed Raychem splice.
j for Instrument Air i
Valve PCV-1228 1
8918 8/31/86 Containment Pressure Requires wire changeout from Wiring changeout, i
i Transmitters 948A, B, C transmitters to junction box.
and 949 A, B, C l
8965 8/31/86 Hydrogen Recombiner 31 Requires Raychem splice.
Raychem splice installed.
and 32 1
8826 8/31/86 Residual Heat Removal Damaged motor leads need repair.
Repaired leads.
i Motor Operated Valve MOV-899A 8737 8/31/86 Service Water Temperature Operator requires repositioning.
Repositioned operator.
Control Valve TCV-1193 8893 8/31/86 Safety Injection Motor Motor leads require repair.
Repaired leads.
Operated Valve MOV-1835A 8917 8/31/86 Containment Purge Valve Junction box requires new gasket.
~ Installed new gasket to FCV-1170 junction box.
l i
MONTHLY MAINTENANCE CATEGORY I REPORT August 1986 M0hTH WRi DATE EQUIPMENT MALFUNCTION CORRECTIVE ACTION 8868 8/31/86 Sampling Valve 958 Requires new splice on leads.
Installed new Raychem splice on leads.
8939 8/31/86 Auxiliary Coolant Valve Motor connection requires taping.
Motor connection taped with FCV-625 silicone tape.
8946 8/31/86 Residual Heat Removal Transmitter connection requires Repaired connection.
Recirculation Flow repair.
Transmitter FT-946B 8895 8/31/86 Component Cooling Reactor Crushed wire needs repair.
Replaced crushed wire.
Coolant Pump Supply Isolation Valve 769 8961 8/31/86 Safety Injection Valve Motor connection requires taping.
Motor connection taped with MOV-851B silicone tape.
8836 8/31/86 Containment Pressure Relief Wiring requires replacement.
Replaced wiring.
Valve PCV-1191 8853 8/31/86 Containment Pressure Relief Wiring requires replacement.
Replaced wiring.
Valve PCV-1192 i
t I
J
e
SUMMARY
OF OPERATING EXPERIENCE AUGUST 1986 Indian Point Unit 3 remained shutdown for an unscheduled turbine maintenance outage for the entire reporting period.
r-Indian Point 3 Nuclear Power Plant P.O. Box 215 E
Buchanan, New York 10511 914 739.8200
- > NewWrkPbwer 1# Authority September 9, 1986 IP3-WAJ-0447Z IP3-LMK-20lH Docket No.
50-286 License No. DPR-64 Director, Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, D.C.
20555 Attention: Document Control Desk
Dear Sir:
Enclosed you will find twelve copies of the monthly operating report relating to Indian Point 3 Nuclear Power Plcnt for the month of August, 1986.
Very truly yours, M o.
Will osi r ident M na r LK/aa:3:
es (12 copies) cc:
Dr. Thomas E. Murley, Regional Administrator Region 1 U.S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, Pennsylvania 19406 IP3 Resident Inspectors' Office George Wilverding (SRC), WPO J.C. Brons, WPO S.V. Fuller, NYO W.R. Yario, NYO d
INPO Records Center Suite 1500
\\g 1100 Circle 75 Parkway Atlanta, Georgia 30339