Monthly Operating Rept for Aug 1985
ML20205C724
Person / Time
Site: Indian Point Entergy icon.png
Issue date: 08/31/1985
From: Josiger W, Kelly L
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
To:
NRC OFFICE OF ADMINISTRATION (ADM), NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
References
IP-LK-2252, NUDOCS 8509230172
Download: ML20205C724 (7)


Text

____

s .

I i

OPERATING DATA REPORT DOCKET NO. 50-286 DATE 9-1-8s COMPLETED BY ' vn 1 1. - .

TELEPHONE '914) 739-8200 OPERATING STATUS b8I'S g, ggjg 3,,,; Indian Point No. 3 Nuclear Power Plant

2. Reporting Period: Aunust 1985 3025
3. Licensed Thermal Power (MWt):

1013

4. Nameplate Rating (Gross MWe):

965

5. Design Electrical Rating (Net MWe):

1000

6. Maximum Dependable Capacity (Gross MWe):

965

7. Maximum Dependable Capacity (Net MWe):
8. If Changes Oc ur in Capacity Ratingt (Items Number 3 Through 7) Since Last Report. Give Reasons:
9. Power Level To which Restricted.lf Any (Net MWe):
10. Reasons For Restrictions.If Any:

This Month Yr..to.Date Cumulative 744  ;"7' 7a 07c

11. Hours in Reporting Period 0 3729 10 4s 094 13
12. Number Of Hours Reactor was Critical n a o
13. Reactor Reserve Shutdown Hours n 17na on 41.sso 9, -
14. Hours Generator On Line n n n l
15. Unit Reserve Shutdown Hours i n in *,n cc, i1m nan enn
16. Gross Thermal Energy Generated (MWH) n 1 1;9.4in 16 nnn.7's
17. Gross Electrical Energy Generated (MWH) 0 1.229.876 14.51s.992
18. Net Electrical Energy Generated (MWHi 0 63.5 55.2
19. Unit Service Factor 55.2 0 63.5
20. Unit Availability Factor 0 57.4 47.49*
21. Unit Capacity Factor (Using MDC Net) 45.3 0 57.4
22. Unit Capacity Factor (Using DER Net) 20.4 0 2.3
23. Unit Forced Outage Rate I 24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Eacht:
  • Weighted Avg.

l l

25 If Shut Down At End Of Report Period. Estimated Date of Startup: fest. sent. 1995) 26 Units in Test Status iPrior to Commercial Operation): Foreces: Achieved ,

I INITIAL CRITICALITY INITIAL ELECTRICITY #

COMMERCI AL OPERATION 8509230172 850831 PDR ADOCK 05000286 h( \

R PDR ,

DOCKE1PlO. 50-2Hr.

UNIT SiluTDOWNS /.ND POWER REDUCTIONS NO- 3 UNIT NAME DATE 4 1-ns COMPLETEI) HY 7-- Yellv .

REPORT MONill August

.TELEPilONE 914-739-8200 c

, ,$E 3 jY5 1.icensee E.

' , l". Cause & Correceive .

No. Date Q 3g d 2s5 Event g 93 Action to H yE 5 j ;f3 g 11oort # mO j' Preveni Itecurrence d

06 850608 S 744 C 2 N/A ZZ ZZZZZZ Unit in a scheduled cycle IV-V refueling outage I 2 3 4 F: Forced Reason: Metimd: 1:slubit F - Instintiions S: Scheduled A l'aluipment Failure (Explain) I-Manual for Piepasation of Data B. Maintenance of Test 2-Manual Scram. I niiy Sheets for I.itemee C Refueling 3 Automatic Scram. livent Itepois ll.l RI File (NilRI:G-D Regulatory Rest iction 4 Othes (Explain) 0161) li-Ope:ator Tsaining & Lice sw Eumination F Administrative 5 G Operational Leros (F.xplain) 1%Inha11 Same Souice 19/77) Il Other (Explain)

m. . . _ _ . . _ . . _ _ _ _ _

AVERAGE D ALLY UNIT POWER LEVEL

DOCKET NO. 50-286 Indian Point
UNIT No. 3 i D ATE 9-1-85 COMPLETED BY I- Kellv TELEPHONE (914) 739-8200 t f

l l MO.VIH August 1985 DAY AVERAGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL (MWe-Net) (MWe-Neti 3 0 g; o 2 0 IS 0 3 0 19 0 4 0 20 0 ,

5 0 3g o j 6 0 33 0 lI 7 0 23 0

}

8 0 34 o 0

) 9 25 0 10 0 26 0 0 0

) 11 37 _

j 12 0 28 0 0 0

) 13 29 i

14 0 30 0 l

15 0 31 0 i

16 0 4

i INSTRUCTIONS On this format. list the average daily unit power leselin MWe Net for each day in the reporting inonth. Compute to the nearest whole megawatt.

19177) i s

.-., . ,- . - - . , ,.-- , - . . - - - - - - . . - ~ . .

. - - . . - - , , - =

MONTHLY MAINTENANCE CATEGORY l REPORT August 1985 MONTH WR# DATE EQUIPMENT MALFUNCTION CORRECTIVE ACTION 6262 8/1/85 Fuel Storage Building SOV will not vent off Replaced SOV Door Seal SOV 6887 8/1/85 CCR Compressor will not reset Repaired jackets to Air Conditioner 31A condensing unit heads 6902 8/1/85 Diesel Generator 31, Prelube pump motor Rewired motor Prelube Pump Motor shorted out 6881 8/2/85 CCR Air Conditioner A/C does not keep CCR cool Repaired condensing unit heads 6890 8/8/85 CCR Air Conditioner 32A Compressor trips Repaired condensing unit within short time heads 6777 8/8/85 Containment Spray High vibrations on pump Rebuilt motor and performed Pump 32 shaft motor alignment 6784 8/9/85 Diesel Generator 32, Lube oil heaters grounded Replaced #3 lube oil Lube Oil Heaters heater 6737 8/9/85 Containment Recirc. Fans #31 motor cooler hose leaks Replaced Hose

  1. 31 Motor Cooler 5584 8/20/85 Diesel Air Receiver Stems stripped and hand wheels Replaced all (3) valves.

Blowdown Valves, DA-8-1, missing DA-8-2 and DA-8-3 6882 8/22/85 Admin. Bldg. Exhaust Pump vibrates excessively Repaired RE-101 (R-46)

Radiation Monitor, when operating R-46 6926 8/26/85 # 32 Aux. Boiler Feed Pump Valves do not meet Replaced 0-rings, diaphragm Main Steam Valves 1310 A & B stroke time limits seals, and packing on 1310B Replaced packing on 1310A.

7010 8/28/85 #32 Aux. Boiler Feed Pump Valves do not meet new Removed root stop valve Main Steam Valves 1310 A & B stroke time limits. and air regulators 6980 8/31/85 Containment Recire. Fans, Outboard and inboard Realigned motor

  1. 33 Fan Cooler Unit Motor bearings had excessive vibration

MONTHLY I & C CATEGORY I REPORT AUGUST 1985 MONTH WR# DATE EQUIPMENT MALFUNCTION CORRECTIVE ACTION 4397 8/5/85 Residual licat TM-636 Re-calibrated TM-6J6 Removal System Out of calibration Temperature Recorder TR-636 4453 8/10/85 Nuclear Instrumentation Unable to obtain an Replaced Detector System, #32 Source acceptable plateau Range Detector 4445 8/15/85 Containment Temperature Found voltage to current Re-calibrated voltage to T1-1203 converter out of calibration current converter 4385 8/17/85 Nuclear Instrumentation Unable to obtain an Replaced detector System, 31 Spare acceptable plateau Source Range Detector 4480 8/21/85 Isolation Valve LI-1078 reads high. Recalibrated LT-1078 Seal Water System, Tank Level Gauge, LT-1078.

O

Sunnary of Opeating Experience August 1985 Indian Point Unit 3 remained shutdown for the Cycle 4/5 refueling outage for the entire reporting period.

I

, Indian Point 3 Nuclear Power Plant P.O. Box 215 Buchanan, New wwk 10511 914 739.8200

  1. > NewWrkPbwer

& Authority September 13, 1985 IP-LK-2252 Docket No. 50-286 License No. DPR-64 Director, Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Attention: Document Control Desk

Dear Sir:

Enclosed you will find twelve copies of the monthly operating report relating to Indian Point 3 Nuclear Power Plant for the month of August, 1985.

Very truly yours, f$Y/4 u W am Jo iger esident a ger I,.K/j Enc osures (12 Copies) cc: Dr. Thomas E. Murley, Regional Administrator Region 1 U. S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, Pennsylvania 19406 IP3 Resident inspectors' Office George Wilverding (SRC), WP0 J. P. Bayne, WP0 J. C. Brons, WPO S. V. Fuller, NYO W. R. Yario, NYO INFO Records Center Suite 1500 1100 Circle 75 Parkway Atlanta, Georgia 30339 A

e?

I

\

L.