Monthly Operating Rept for Dec 1985
ML20141J186
Person / Time
Site: Indian Point Entergy icon.png
Issue date: 12/31/1985
From: Josiger W, Kelly L
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
To:
NRC OFFICE OF ADMINISTRATION (ADM), NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
References
IP-LK-003H, IP-LK-34, IP-LK-3H, IP-WAJ-0072, IP-WAJ-72, NUDOCS 8601210157
Download: ML20141J186 (7)


Text

_. .- - - . . - . - . .- ..

l OPERATING DATA REPORT 1

~

DOCKET NO. 50-286 l

' DATE 1/2/86 COMPLETED BY L- Kn11v TELEPHONE f914) 739-8200 OPERATING STATUS Notes

1. Unit Name: Indian Point No. 3 Nuclear Power Plant
2. Reporting Period: December 1985
3. Licensed Thermal Power (MWti: 3025
4. Nameplate Rating (Gross MWe): 1013 .
5. Desagn Electrical Rating (Net MWe): 965
6. Maximum Dependable Capacity (Gross MWe): 1000
7. Maximum Dependable Capacity (Net MWe): 965
8. If Changes Occur in Capacity Ratingi(Items Number 3 Through 7) Since Last Report. Give Reasons:

i

9. Power Level To which Restricted,if Any (Net MWe):
10. Reasons For Restrictions.If Any:

)

This Month Yr..to-Date Cumulative 744 8,760 81,865

11. Hours in Reporting Period 744 5,901.15 47,26'.38
12. Number Of Hours Reactor Was Critical 0
  • O O I
13. Reactor Reserve Shutdown Hours 744 5,785.36 45,633.30
14. Hours Generator On.Line 0 0 0 l 15. Unit Reserve Shutdown Hours

' 2,002,904.06 15,072,827.93 120,777,775.1

16. Gross Thermal Energv Generated (MWH) 657,210 4,922,220 37,564,535
17. Gross Electrical Energy Generated (MWH) 633,238 4,728,523 36,014,639
18. Net Electrical Energy Generated (MWH1 100.0 66.0 55.7
19. Unit Semce Factor i
20. Unit Availability Factor 100.0 66.0 55.7 '

88.2 55.9 47.64*

21, Unit Capacity Factor (Us.ng MDC Nett 88.2 55.9 45.6 l 22. Unit Capacity Factor (Using DER Net) 0.0 2.1 19.7 l 23. Unit Forced Outage Rate

24. Shutdowns Scheduled Over Next 6 Months (Type. Date,and Duration of Each t:

25 If Shut Down At End Of Report Period. Estimated Date of Startup:

26 Units In Test Status iPrior to Commercial Operationi: Forecast Achieved INITIAL CRITICALITY INITIA L ELECTRICITY.

l COMMERCIAL OPERATION 8601210157 851231 g

PDR ADOCK 05000286 R PDR g_f

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-286 Indian Point UNIT No. 3 DATE January 2, 1986 COMPLETED BY L- Kelly TELEPHONE (914) 739-8200 ggg December 1985 DAY AVERAGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL (MWe Net) t MWe-Neti 1 200 17 974 2 208 33 971 3 215 g9 972 4 216 20 973 5 302 21 974 6 949 2 973 7 970 33 974 8 966 24 471 9 971 25- 972 10 972 26 972 __

g3 973 37 974 is 973 sg 973 13 972 39 979 34 972 30 968 973 3, 971 15 16 972

(

INSTRUCTIONS On shis formst, list the average daily unit power levelin MWe Net for each day in the reporting month. Compute to i

the nearest whole megawatt.

(9/77) l l

6u m. . m.

. 7

~ ^

WT gz C. k kc. '- z o

5 II

e. .

Ed

=. O m. m p o. w. >.az .

yg t 9 D r5a'

-EsE =FIEEE 3g E E 5'hgrs.s n Duration

{ ij, C, -44 " gE (Hours)

=

eum u

s-

R 5. r. a

t?". ..

a A.

p. E.

E

  • Reason, m z ~

m 1

w g . .a. =

E. E 1 Method of  !

O E

$ Shutting j l Down Resetor3 A E w E. m =

E m C r- -

m 3 d 5 5 9mr x3S n

-4 -s  !

-=K n g 2 v

=

w .C 3

  • W-E Sysism g a hie Code' o $

![s =aE

k. -

fI. *

=

m f". E @ O 5 E p: -

Component C m ~ O I". Q 5" Code $ g d r

~.- k ' w C

= 2 v.

'.n se O

., , C

- . .g -

~

=~m=~ ~ 3 E yn c i

=.

Z4E -3:

E S K mP m 2 ~

- .=-M
  • 7' = f. Re m

9 H "y

i X !OS E j' 9

- .2 g h w; e. -: = 5 0 >2 3' s.*

52h' O

  • T' ".*

3T 7"N C->E ZE m "< Hl'P. f!" .5

f.:

E d O. ~% -

K e. < A n n t4 -

e. - i X  !
m e, ". Cf. *

%. w lu 3

y 1

- $ 5

. ~

2 CO N)  %

C M 3 D E

O y l O N h 5 m -

w.

r:

W MONTHLY I6C CATEGORY I REPORT .

, DECEMBER 1985 MONTH MWR'# DATE EQUIPMENT MALFUNCTION CORRECTIVE ACTION 3223 12/04/85- ' Wide Range Gas Monitor, Detectors were faulty. Replaced detectors.

Radiation Monitor, R-27, Mid and High Range Detectors 4769 12/04/85 Plant. Vent Plant Vent Computer read-out is not Replaced. keyboard and.

Total Flow / Computer accurate. calibrated.

readout.

4912- 12/11/85 Rod' Position Indication, Light not up with rod on bottom. Replaced fuse.

Rod Bottom Light, F 4915- 12/12/85 Auxiliary Feedwater Pump RPM meter indicates low. Calibrated meter.

32..CCR RPM Meter

~4887. 12/12/85 ' Main Feedwater. Thermocouple,_ Thermocouple had open circuit. Replaced thermocouple and TE-438 calibrated.

4924 12/12/85- Nuclear' Instrumentation.44 Detector current.out-of-adjustment. Calibrated detector current.~ .

Delta Flux Meter 4898 12/13/85 . Battery Charger 31, Voltmeter out-of-adjustment. Calibrated voltmeter.

Voltmeter 4917 12/13/85 . Reactor Coolant' System,-  : Indicates high.. Calibrate R/I converter-and Loop.34, Wide Range. adjusted zero.

Temperature 3691' 12/17/85 ' Chemical and Volume control out of calibration.

Calibrated and checked-System, Reactor. Coolant alarm set-points..

Pump Seal Injection D/P,

.PIC-189. .

MONTHLY MAINTENANCE CATEGORY I REPORT ,

DECEMBER 1985 9 MONTH -

MWR # DATE EQUIPMENT MALFUNCTION CORRECTIVE ACTION .

7307 12/02/85 Service Water Flow Control Closed indicating light socket Repaired existing lamp fixture.

Valve FCV-1276 is missing.

6650 12/02/85 Auxiliary Coolant Limit switch does not function Adjusted limit switch.

valve 793 properly.

6566 12/05/85 Fuel Storage Building Dampers do not open. Ajusted linkage.

Supply Fan Dampers 7189 12/05/85 Safety Injection System, Limit switch does not function Adjusted limit switch.

MOV-899B properly.

7448 12/11/85 31 Charging Pump Seals leak. Repacked pump.

7452 12/11/85 32 Charging Pump Crank is noisy. Performed inspection and overhaul of pump.

7500 12/12/85 Fuel Storage Building, Wire rope is worn. Lubricated sleeve bearings Manipulator Crane and installed new wire rope.

7306 12/13/85 32 Instrument Air Closed Pump develops low head. Rebuilt pump.

Coolirg Water pump 7532 12/23/85 32 Charging Pump Packing leaks. Repacked pump.

7483 12/24/85 31 Waste Gas Compressor Compressor malfunctions. Rebuilt compressor.

7588 12/31/85 31 Service Water, Pump Strainer does not rotate. Removed debris in Zurn Strainer strainer.

F a

s'

SUMMARY

OF OPERATING EXPERIENCE DECEMBER 1985 Indian Point Unit 3 was synchronized to the bus for a total of 744 hours0.00861 days <br />0.207 hours <br />0.00123 weeks <br />2.83092e-4 months <br /> producing a gross generation of 657,210 MWe for this reporting period.

Indian Point Unit 3 was at a reduced average daily power level from December let until December 6th in order to address that Condensate /Feedwater Chemistry ,

guidelines during the plant's return to full power operation following the' \

November 30th unit trip.

The unitsremained on line for the en ire repo'rt'ing period without experiencing any trips or reportable load reductions. .

. , i s

\

t k \%

1

' sn k

b.

% he .

\.

, t A

'4 I

s

& W T

. ss t

i as.

4

[

l

  • I l . s S-

/ a .%

_ .- , f~__ ,

\j

' Indian Ibint 3 Nuclear Ibwer Plant

  • PQ Box 215 Buchanan, New Wrk 10511 914 739.8200
  1. > NewYorkPower  ;" :"',0A*;2" 4# Authority s

January 10, 1986 IP-LK-003H IP-WAJ-007Z V Docket No. 50-286 License No. DPR-64 Director, Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Attention: Document Control Desk

Dear Sir:

Enclosed you will find twelve copies of the Monthly Operating Report relating to indian Point 3 Nuclear Power Plant for the month of December, 1985.

Very truly yours, 1

d N W 1am A Jo r esident an er LKQm Enclosures (12 Copies) cc: Dr. Thomas E. Murley, Regional Administrator Region 1 U. S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, Pennsylvania 19406 IP3 Resident Inspectors' Office George Wilverding (SRC), WP0 J. P. Bayne, WP0 J. C. Brons, WPO S. V. Fuller, NYO W. R. Yario, NYO INPO Records Center Suite 1500 1100 Circle 75 Parkway Atlanta, Georgia 30339 $j 7 I