',P f ",,
31; 4
-M 3 :.
s O OPERATING DATA REPORT
/
f.
~
Docket No.,50-286 Date 01-02-87
~
Completed By.
L.. Kelly-Telephone 914-739-8200~
1
!dPERATING STATUS U nit Name':.-Indian' Point No. 3 Nuclear Power Plant Notes 1.?
I 1 2.,
R: porting Period:
December 1986
.3.' Licensed Thermal Power-(MWt):
3025
- 4., Nameplate Rating;(Gross MWe):
1013 15c D3 sign Electrical Rating.(Net MWe):-
965-6.;=M ximum Dependable Capacity (Gross'MWe):- 965 f7, Mnximum Dependable ~ Capacity'(Net MWe): '
930
'8. : :If Ch$n~ges.decur. in Capacit[ Ratings (Items Numb'er 3 through 7) Since Last Report.
Give Reasons:
9.
- Power Level to Which Restricted, If Any (Net MWe):. 930 Net MWe 110..; Reasons for Restrictions, If Any:
- 33 Low pres ure turbine was modified by replacina
-two rows of blades with baffle assemblies.
1 This' Month Yr. to Date Cumulative-2.11.;.. Hours In Reporting Period 744 8,760 90,625
- 12.' ' Number of Hours Reactor Was Critical 744 6,581.78 53,849.16
- 13. : Reactor Reserve Shutdown Hours 0
O O
i.
.14~. ~ Hours Gene'rator on-Line:
744 6,432.62-52,065.59
~15.-; Unit Reserve' Shutdown Hours 0
0 0
.16.1 Gross Thermal Energy Generated (MWH) 2,247,782.02 17,755,086-138,532,861
- 17. Gross Electrical Energy Generated (MWH) 719,670 5,740,080 43,304,615
- 18. Net Electrical Generated ~(MWH) 694,635-5,525,641 41,540,280-19," ': Unit' Service Factor 100.0 73.4 57.5
.20.
Unit Availability Factor 100.0.
73.4 57.5 21.. Unit. Capacity Factor (Using MDC Net) 100.4 66.5*
49.19*
22.' : Unit Capacity Factor (Using DER Net) 96.8 65.4
-47.5
- 23. ~ Unit Forced Outage Rate 0.0 21.4 19.9
- 24.
Shutdowns Scheduled Over Next 6 Months (Type.Date and Duration of Each):
- Weighted Average Cycle 5/6 Refueling Outage Est. May, 1987
- 25 '.
If Shut'Down at End of Report Period. Estimated Date of Startup:
- 26.
Units IniTest Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 7h \\x y
8701200514 861231 PDR ADOCK 05000286 i
R,.
PDR 7
gj.
s?
4 AVERAGE DAILY-UNIT POWER LEVEL 4y DOCKET NO.
50-286 UNIT IP-3 l
DATE l-2-87 COMPLETED BY L. Kelly i
TELEPHONE (914) 739-8200-MONTH' December 1986
'. DAY', AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1 934 17 933 2
935-18 934 3
934 19 933 4
935 20 933 5
935 21 935 6
934 22 933
.7 933 23 932 8
935-24 933 9
934 25 935 10 933 26 934 11 935 27 934 12 934 28 933 13 934 29 933 14 935 30 931 15 933 31 933 16 933 INSTRUCTIONS:
On this format, list the average daily unit power level in MWe-Net for each day.
in the reporting month. Compute to the nearest whole megawatt.
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
'50-286 UNIT NAME Indirn Pri c 3 DATE 01-02-87 REPORT MONTH nn,-omwo,-
1986 TELEPHONE 914-739-8200 m
O Et to
=Om E
vUE Licensee a
Eo Cause & Corrective e
N E
.E $ "
Event E.3 Action to j :E sE jN Report #
]x 0 E"
Prevent Recurrence No.
Date NONE I
2 3
4-F: Forced Reason:
Method:
. Exhibit F - Instructions-S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance of Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER) File (NUREG D-Regulatory Restriction 4-Other (Explain) 0161)
E-Operator Training & License Examination F-Administrative
~
G-Operational Error (Explain) 5 H-Other (Explain)
Exhibit H - Same Source
y
. a MONTHLY I & C CATEGORY I REPORT'
-December-1986
MONTH WRf DATE EQUIPMENT MALFUNCTION CORRECTIVE ACTION-6324' 12/1/86
Rod bottom' bistable alarm Replaced conditioning card'
~
Rod. Bottom Bistable C-3
.and light annunciates without-rod drop 6310 12/9/86 Radiation Monitoring High background reading Replaced detector?
System, Vapor Containment Noble Gas Monitor R-12..
6338 12/11/86
- 31 Fan Cooler Unit High Alarm Bistable set.Iow Reset Alarm Bistable Level Alarm 6221 12/15/86 Nitrogen Supply Primary Brok'en face plate-on pressure Replaced face' plate-Auxiliary Building, Pressure indicator Indicator-PI-17 5931 12/18/86 Service Water Pump Unable to vent flow gauges.on' Replaced Vent Valves.on #31,.
Flow Instrumentation
- 31 f32 and #35 Service Water
- 32, and #35 Service Water.
Pump Pump Flow Meters 9
e I
s
MONTHLY MAINTENANCE CATEGORY I REPORT December-1986-MONTH WR#
DATE EQUIPMENT MALFUNCTION CORRECTIVE ACTION 9280 12/1/86
- 33 Service Water Pump
' Packing leak Replaced packing 9069 12/2/86
- 31 Primary Water Pump Valve' leaks by
_ Replaced compression 4
Discharge Isolation Valve assembly PW-16 9071 12/3/86
- 32 Primary Water Pump Valve leaks by
- Replaced compression Discharge Isolation Valve assembly--
?W-35 9261 12/3/86 Hydrogen Sampling System, Valve has dual indication.
Repaired limit. switch Containment Isolation Valve-SOV-514 9386 12/3/86 Radiation Monitoring System, During P.M. found blower Replaced. vanes, bearings-RE-101 4th Floor Adminis-internals worn and drive ~ belt tration Building 9388 12/4/86 Radiation Monitoring System, During P.M. found blower Replaced vanes and bearings.-
Plant Vent Stack Radiation internals worn Monitors R-13/14 9389 12/4/86 Radiation Monitoring System, During P.M.-found blower Replaced vanes, bearings, Containment Plant Vent internals worn and drive helt Radiation Monitors R-11/12 9400 12/5/86 Emergency Diesel Generator Open thermostat' wire Repaired wiring Ventilation Fan #319 t
l MONTHLY MAINTENANCE CATEGORY I REPORT December
- 1986 MONTH.
WR#
DATE EQUIPMENT MALFUNCTION CORRECTIVE ACTION 9455 12/8/86 Chemical and Volume Control Seal tank overflowing Repacked pump System, #31 Charging Pump 9374 12/8/86
- 31 Waste Gas Compressor During P.M. found compressor Replaced grease seals and grease seals.and bearings worn bearings.
9456 12/11/86 Chemical and Volume Control Weld leak on. vent line' Replaced vent line System, #33 Charging Pump Suction Sr:Lilizer Heating Tank 9417 12/12/86 Chemical a'nd Volume Control Open thermocouple wire Replaced thermocouple wire-System, Boric Acid Heat Trace, Circuit #39 9473 12/16/86 Chemical and Volume Control Seal tank overflows Repacked pump System, #33 Charging Pump 7952 12/19/86 Fuel Storage Building.
Solenoid valve on exhaust Replaced solenoid valve Exhaust Damper damper inoperative 9524 12/23/86 Chemical and Volume Control Loose wire connection Repaired wiring connection System, Boric Acid Heat Trace, Redundant Circuit #32 9032 12/30/06 Waste Gas Analyzer Valves leak by Replaced valves Sample Valves 1600F, 1600G, 1600H and 160GJ 9
j
+
.' s
SUMMARY
OF OPERATING EXPERIENCE DECEMBER.1986
- Indian Point Unit #3 was synchronized to the bus for a total of 744 hours0.00861 days <br />0.207 hours <br />0.00123 weeks <br />2.83092e-4 months <br />, producing:a gross. generation of 719,670'MWe for this reporting period.
il The Unit. remained on line for the entire reporting period without experiencing any, trips or reportable load reductions.
9 k
-y-
.a.
4 Inden Point 3 y
Nuclear Power Plant P.O. Box 215 Buchanan, New York 10511 914 739 8200
- > NewWrkPbwer 4# Authority January 5, 1987 IP3-WAJ-001Z IP3-LMK-001H Docket No.
50-286 License No. DPR-64 Director, Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, D.C.
20555 Attention: Document Control Desk
Dear Sir:
Enclosed you will find twelve copies of the monthly operating report relating to Indian Point 3 Nuclear Power Plant for the month of December, 1986.
Very y yo rs,
[L+
W iam A. Josiger esident Manager LK/sn:3:06 Enclosures (12 copies) cc:
Dr. Thomas E. Murley, Regional Administrator Region 1 U.S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, Pennsylvania 19406 IP3 Resident Inspectors' Office George Wilverding (SRC), WP0 J.C. Brons, WPO
[bN S.V. Fuller, NYO W.R. Yario, NYO
/(
INPO Records Center Suite 1500 1100 Circle 75 Parkway Atlanta, Georgia 30339 L