o.

OPERATING DATA REPORT 50-247 DOCKET NO.

DATE l-6-86 COMPLETLD ilY K.

Kriecer l

TELEPilONE 01 A-s?^ 5155 4

OPERATING STATUS Notes Indian Point Unit #2

1. Unit Name:

December 1985

2. Reporting Period:

2758

3. Licensed Thermal Power (MW ):

1013

4. Nameplate Ratin;(Gross MWe):

873

5. Design Electrical Ratin (Net MWe):

onn

6. Maximum Dependable Capacity (Gross MWe):

964

7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report.Give Reasons:

NONE NovP

9. Power Letel To which Restricted.lf Any (Net MWe):
10. Reasons For Restrictions.If Any:

NONF r

2

' llds Month Yr to.Date '

dumulative

.T 1008491

~

744 R7AO

11. Hours In Reporting Period 716,78 8504.14 69169_86
12. Number Of Hours Reactor Was Critical 0

152.67 3398.37

13. Reactor Resene Shutdown Hours 708.87 8386.30 67136.68
14. Hours Generator On.Line 0

0 0

~

15. Unit Resene Shutdown Hours 1940952 22121952 174R76797
16. Gross Thermal Energy Generated (MWH)

~

54249476 609750 6931860

17. Gross Electrical Energy Generated (MWH) 587441

.6665079 s177nonA 4

18. Net Electrical Energy Generated (MWH) 95.3 os 7 AA A 1
19. Unit Senice Factor 95.3 95 7 66.6 J
20. Unit Availability Factor 41 A 88 8 so.8
21. Unit Capacity Factor (Using MDC Net) 90.4 87.7 SR R
22. Unit Capacity Faetor (Using DER Net) 4.7 3.s 8.9 j
23. Unit Forced Outage Rate
24. Shutdowns Seheduled Oser Next 6 Months (Type. Date.and Duration of Each):

Cycle 7/8 refueling and maintenance outace. schoditTod fn r T ts nA onA mr= 60 day

['

du ra tio n.

f-1-RA 5

25. If Shut Down At End Of Report Period. Estimated Date of Startup:
26. Units In Tnt Status (Prior o Commercial Operation):

Forecast Achiesed

^

\\

\\

INITIAL CRITICALITY

\\

/A

\\

i INITI \\l. El FC1RICITY

\\

\\

COM\\ll RCIAL Ort RATION

\\

\\

p1h 8601230380 851231

/

I,3/77) 1 PDR ADOCK 05000247

/l b,/

l l

R PDR l

0

l 1

AVERAGE D AILY UNII' POWER LEVEL l

50-247 DOCKET NO.

IP Unit #2 UNIT 1-6-86 DATE K. Krieger COMPLETED BY 914(526-5155 TELEPHONE December 1985 MONTH DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL

~~ '

(MWe. Net)

(MWe. Net) 842 829 g

. =

37 839 2

gg 828 C,<

3 835 836

__ g 9 4

846 839 20 848 5

.2 833 845 6

22 840 848 7

g33 8

840 24 839 9

~840 837 25 840 840 10 26 838 842 gg 27 12 208 841 28 f

329 842 13 29 820 l

14 30 841 824 15 31 480 16 824

?

INSTRUCTIONS On this format, list the average daily unit power leselin MWe Net for each day in the reporting mortth. dimpt.te to the nearest whole megawatt.

I l

(9/77)

,o SIMfARY OF OPERATING EXPERIENCE December 1985 Unit No. 2 operated at 100% reactor power throughout the month of December, with the exception of a reactor trip on December 12 and 31.

The details of these trips are reported in LER 85-16 and 85-17.

Several performance records were set by the station in 1985.

These Included:

Availability -

95.7%

Capacity Factor -

88.8%

Gross FM-llrs Generated -

6931860 Forced Outage Rate -

3.5%

Days of Continuous Operation -

156.19

[

o a

50-247 DOCKET NO.

UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT N AME TP Unit #7 DATE 1-6 06 REPORT MONT11 December 1985 COMPLETED BY K-Krieger TELEPHONE 914(576-stss jg 3

E Licensee

,E g fg Cause & Corrective No.

Date g

3g jg&

Event gg 9-3 Action to f=

5 Ege Report a mV E'

Prevent Recurrence

  • H 7

g o

6 12 851212 F

24.97 A

3 85-016 IA - NSTRUMENT No. 21 Reactor Coolant Loop Low Flow X

Bistable Failure 13 851231 F

10.16 A

3 85-017 U

VALVE Rapid rate of change of Pressurizer A

Pressure I

l i

2 3

4 F: Forced Reason:

Method:

Exhibit G - Instructions S: Scheduled A Equipment Failure (Explain) 1 Manual for Preparation of Data B-Maintenance of Test 2-Manual Scram.

Entry Sheets for Licensee

(

C-Refueling 3-Automatic Scram.

Event Report (LER) File (NUREG-D-Regulatory Restriction 4-Other (Explain) 0161)

E-Operator Training & License Examination F-Administrative 5

G-Operational E:ror (Explain)

Exhibit I - Same Source P)/77)

Ilf)ther (Explain)

  • See respective LER

John D. O'Toola v<e Presroent i

I conschdated Edison Company of New York, Inc 4 Irv:ng Piace. New York. NY 10003 Te:ephone (212) 460-2533 l

January 15, 1986 Re:

Indian Point Unit No. 2 Docket No. 50-247 4

1 Mr. James M. Taylor, Director Office of Inspection and Enforcement U. S. Nuclear Regulatcry Commission Washington, D. C. 20555 1

j ATTN:

Document Control Desk i'

Dear Sir:

I Enclosed are twelve copies of the Monthly Operating Report for Indian j

Point Unit No. 2 for the month of December 1985.

Very truly-yqurs, l

0 T. C'Tecer J

/

<j Encl.

cc:

Dr. Thonas E. Murley, Regional Administrator Region I U. S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, Pa. -19406 Senior Resident Inspector U. S. Nuclear Regulatory' Commission P. O. Box'38 Buchanan, New York 10511 i

i

/

]y 8 1 4

6 4

}

., ~,,,,

.,~c-

.--~.---,.----w.

- - - - -, - -,,