ML20217H85014 October 1999Safety Evaluation Supporting Amend 197 to License DPR-64
ML20206U2559 February 1999Safety Evaluation Supporting Amend 187 to License DPR-64
ML20236Y1573 August 1998Part 21 Rept Re ASTM A351,GR. CF8 Matl at Indian Point Being Out of Specifications in Molybdenum & Chromium.Cause & Corrective Actions Are Not Stated
ML20236V42813 July 1998Safety Evaluation of TRs WCAP-14333P & WCAP-14334NP, PRA of RPS & ESFAS Test Times & Completion Times. Repts AcceptableLarge early release frequency
Earthquake
ML20236T55124 June 1998Consolidated Edison Co of Ny,Indian Point Unit 2,Drill Scenario Number 1998CSafe Shutdown
ML20248B23731 March 1998Revised Monthly Operating Rept for March 1998 for Indian Point Station Unit 2
ML17264A93810 July 1997Deficiency Rept Re Potential Safety Hazard Associated w/FM-Alco 251 Engin,High Pressure Fuel tube-catalog: 4401031-2 in Which Dual Failure Mode Exists.Caused by Incorrect Forming Process
ML18153A14310 June 1997Part 21 Rept Re Possible Machining Defect in Certain Stainless Steel Swagelok Tube Fitting Bodies.Facilities Have Been Notified About Possible Problem
ML20210E35927 March 1997Part 21 Rept Re Sorrento Electronics Inc Has Determined Operation & Maint Manual May Not Adequately Define Requirements for Performing Periodic Surveillance of SR Applications.Caused by Hardware Failures.Revised RM-23A
ML10050080028 February 1997Conditional Extension of Rod Misalignment TS for Indian Point 3.Shutdown Margin
ML20115J39822 July 1996Interim Part 21 Rept Re 3/4 Schedule 80 Pipe Furnished to Consolidated Power Supply.Investigation Revealed Only One Nuclear Customer Involved in Sale of Matl
ML20096E51031 December 1995Resubmitted Rev 13 to QA ProgramSafe Shutdown
Boric Acid
Fitness for Duty
Non-Destructive Examination
Offsite Dose Calculation Manual
Coatings
Nondestructive Examination
Process Control Program
Fire Protection Program
ML17059A3616 July 1994Emergency Action Level Verification & Validation Rept.Earthquake
ML17311A01813 May 1994New York State EAL Upgrade Project Verification & Validation Rept.Safe Shutdown
Shutdown Margin
Reactor Vessel Water Level
Ultimate heat sink
Offsite Dose Calculation Manual
Safeguards Contingency Plan
Battery sizing
Earthquake
Fuel cladding
Pressure Boundary Leakage
Offsite Circuit
Power change
Unidentified leakage
ML20029C78031 March 1994Monthly Operating Rept for Mar 1994 for Indian Point Unit 1. W/940415 Ltr
ML20056E51731 August 1993Technical Review Rept, Tardy Licensee Actions
ML20062J22823 July 1993Consolidated Edison Co of Ny Indian Point Unit 2,Drill Scenario 1993
ML20118A26831 December 1992Consolidated Edison Co of Ny Indian Point,Unit 2 Exercise Scenario,1992Earthquake
ML20125C7167 December 1992Part 21 Rept Re Possibility for Malfunction of Declutching Mechanisms in SMB/SB-000 & SMB/SB/SBD-00 Actuators. Malfunction Only Occurs During Seismic Event.Balanced Levers May Be Purchased from Vendor.List of Affected Utils EnclStroke time
Anchor Darling
ML20127P58623 November 1992Followup to 921005 Part 21 Rept Re Potential Defect in SB/SBD-1 Housing Cover Screws.Procedure Re Replacement of SBD-1 Spring Cover Bolts Encl.All Fasteners Should Be Loosened & Removed.List of Affected Utils Encl
ML20096H23021 May 1992Special Rept:On 920504,south Side Lower Electrical Tunnel Detection Sys 8 Taken Out of Svc for Mod to Reposition Detection Sys Run of Conduit.Detection Sys Declared Operable on 920520 After Mod Completed & Sys Retested
ML20079F91831 May 1991Structural Evaluation of Indian Point,Units 2 & 3 Pressurizer Surge Lines,Considering Effects of Thermal StratificationFinite Element Analysis
ML20059E94631 August 1990Nonproprietary Rev 2 to Indian Point 2 Tube Fatigue Reevaluation
ML20059G20131 July 1990Final Rept on Steam Generator Insp, Repair & Restoration Efforts During 1990 Midcycle Insp
ML20058K41530 June 1990Steam Generator Insp,Repair & Restoration Program Presentation to NrcLiquid penetrant
ML20058K41230 June 1990Status Rept,Indian Point Unit 2 Mid-Cycle Steam Generator Insp Presentation to NrcLiquid penetrant
ML20043A48930 May 1990Nonproprietary Indian Point Unit 2 Steam Generator Insp, Repair & Restoration Program.Liquid penetrant
ML20042F14431 December 1989New York Power Authority Annual Rept for 1989. W/900430 Ltr
ML19332B93730 November 1989Nonproprietary Info Presented to NRC Re Indian Point Unit 2 Steam Generator Secondary Side Loose Objects.
ML19332D66631 October 1989Nonproprietary Rev 2 to Indian Point Unit 2 Steam Generator Girth Weld/Feedwater Nozzles Rept Spring,1989 Outage.Liquid penetrant
Pressure Boundary Leakage
ML20247J81631 July 1989Safety Evaluation for UHS Temp Increase to 95 F at Indian Point Unit 3
ML20248B31730 June 1989Rev 1 to Nonproprietary WCAP-12294, Indian Point Unit 2 Steam Generator Girth Weld/Feedwater Nozzles Rept,Spring 1989 OutageLiquid penetrant
Pressure Boundary Leakage
ML20248D36330 June 1989Rev 1,to Indian Point Unit 3 Reactor Vessel Fluence & Ref Temp PTS Evaluations
ML20247N53331 May 1989Nonproprietary Indian Point Unit 2 Steam Generator Girth Weld/Feedwater Nozzles Rept Spring,1989 Outage
ML20247J80731 May 1989Containment Margin Improvement Analysis for Indian Point Unit 3Shutdown Margin
Stroke time
ML20247G51730 April 1989Monthly Maint Category I Rept Pages from Monthly Operating Rept for Apr 1989 for Indian Point
ML20244C33110 April 1989Safety Evaluation Supporting Amend 137 to License DPR-26
ML20248F42131 March 1989NSSS Stretch Rating-3,083.4 Mwt Licensing ReptBoric Acid
Shutdown Margin
Ultimate heat sink
Fuel cladding
Coast down
ML20235V5932 March 1989Special Rept:During Cycle 6/7 Refueling Outage Scheduled from Feb-May 1989,openings Will Be Made in Plant Penetration Fire Barriers in Order to Install Various Mods. Fire Watches Posted & Fire Detection Tests CompletedFire Barrier
ML20248F30031 December 198810CFR50.59(b) Rept of Changes,Tests & Experiments Completed in 1988Boric Acid
Safe Shutdown Earthquake
Temporary Modification
ML20246E27131 December 1988Con Edison 1988 Annual Rept
ML20196D30131 October 1988Reactor Vessel Matl Surveillance Program for Indian Point Unit 2 Analysis of Capsule V
ML20155H25430 September 1988Rev 2 to Indian Point Unit 2 (NRC Bulletin 88-008 Thermal Stresses in Piping Connected to RCS) Indentification of Unisolable Piping & Determination of Insp LocationsNondestructive Examination
ML20154M56631 August 1988Monthly Operating Rept for Aug 1988 for Indian Point Station Unit 2
ML20154M56931 July 1988Revised Page to Monthly Operating Rept for Jul 1988 for Indian Point Station Unit 2
ML20151N78831 July 1988Rev 1 to Charpy Toughness & Brittle Transition Temp Characterization of HAZ High Hardness Zone of Indian Point Unit 2 Steam Generator Girth Weld by Gleeble Weld Thermal Cycle Simulation
ML20006B47431 May 1988Nonproprietary Indian Point Unit 2 Evaluation for Tube Vibration Induced Fatigue.
ML20151N78231 May 1988Fracture Sensitivity Study of Girth Weld 6 Repaired Configuration,Indian Point Unit 2Hydrostatic
ML20153F91628 April 1988Changes,Tests & Experiments - 1986High Radiation Area
Safe Shutdown Earthquake
Temporary Modification
Fire Protection Program
ML20151T46831 January 1988Experimental & Finite Element Evaluation of Spent Fuel Rack Damping & Stiffness