ML20096H230

From kanterella
Jump to navigation Jump to search
Special Rept:On 920504,south Side Lower Electrical Tunnel Detection Sys 8 Taken Out of Svc for Mod to Reposition Detection Sys Run of Conduit.Detection Sys Declared Operable on 920520 After Mod Completed & Sys Retested
ML20096H230
Person / Time
Site: Indian Point Entergy icon.png
Issue date: 05/21/1992
From: Russell J
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
To: Martin T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
IP-NRC-92-034, IP-NRC-92-34, NUDOCS 9205270143
Download: ML20096H230 (2)


Text

~ - .-- . - . . ~. -,. . - - - -.

e-fa! #--

Inclin Point 3 Nuciatt Powsr Plant i'O Box 215

-9uchanart New York 10511 014 736 8N1

  1. > :NewYorkPbwer u. ,s 1. n ......

4# Authority ""*"'"a==

May 21, 1992

--IP-NRC-92-034 License No. 50-286 Docket ho. DPR-64 Mr. Thomas T. Martin Regional Administrator Region I _ _

U.S.-Nuclear Regulatory Commission 475 Allendale Road King of Prussia, Pennsylvania 19406

Dear Sir:

The purpose of this letter is to provide information as required'by the Special Reports section (6.9.2) of the Indian Point' Unit Three (IP3) Technical Spacifications..

Technical Specifications Section 3.14, " Fire Protection and Detection Systems" section D.2.b states that: "The minimum operable instrumentation required in Table 3.14-1 shall be restored-within-14 days or a Special Report shall be prepared and submitted to tho' Commission. pursuant to specifi~ationc 6.9.2.f within the next 30 days outlining the cause_of the malfunction and the plans for restoring the

instrumentation.to operable status."

L- On May 4,-.1992 the south side lower electrical _ tunnel c (elevation 34') detection system #8 was:taken out of service-l -for scheduled modification work that required repositioning L of the detection systems' run of conduit. A fire-watch was L . established in the area. Manual preaction suppression was L available,:if_-needed, for the south side suppression system-via the_ systems deluge valve manual pull station. A-14 day administrative LCO with'special 30 day reporting requirement wasLentered'at-that time expiring on May 18, 1992.

On May 20,'1992' the sauth side lower electrical tunnel (elevation 34') detection system #8 was declared operable, i after modification completion and system retest, and the

! cystem was' returned to service.

1 9205270143 920521 PDR S

ADOCK 05000286 ((IS 2.;L PDR.

// p

)

. o 2

Should you o your staff have any questions regarding this issue pleg e ontact Mr._B. Ray of my staff.

/

inceeh, -

Jos ph E. Russell Resident Manager Indian Point Three Nuclear Power Plant JER/RAL cc: Document Control Desk (original)

U.S. Nuclear Regulatory Commission Mail Station P1-137 Washington, D.C. 20555 Resident Inspector's Office Indian Point 3 U.S. Nuclear Regulatory Commission P.O. Box'337 Euchanan, NY 10511 2

.