Text
,.
4.
-. s
,,j ^
~
. OPERATING DATA REPORT
. Docket No. '50-286 Date UE:UT:IK Completed By.
L. Kelly Telephone 914-739-8200 OPERATING STATUS
- 1.. Unit Name:L Indian Point No. 3 Nuclear Power Plant
. Notes.
2..:R: porting Period:
July 1986
- 3. ' Licensed Thermal Power (MWt):
3025
- 4..Namepiste Rating (Gross MWe):
1013
- 15. D3 sign 21ectrical Rating (Net MWe):
965
- 6. -M ximum Dependable Capacity-(Gross MWe):
1000-7.
Miximum Dependable Capacity (Net MWe):-
965 8.
If Changes 0ccur in Capacity Ratings (Items Number 3 through 7) Since Last Report.
Give Reasons:
9.
. Power Level to Which Restricted. If Any (Net MWe): -515 Net MWe 10..~ Reasons for Restrictions, If Any: ~
- 32 Main Transformer is out of service for intpictions and replacement, and is unavailable until August 1986.
This Month Yr. to Date Cumulative
- 11. Hours In Reporting Period 744 5,087 86,952
- 12. Number of Hours Reactor Was Critical 135.33 3,788.64 51,056.02
- 13. - Reactor ' Reserve Shutdown Hours 0
0 0
14..
Hours Generator On-Line 110.03
-3,696.59 49,329.56
- 15. Unit Reserve Shutdown. Hours 0
0 0-
- 16. Gross Thermal Energy Generated (MWH) 181,463.28-9,823,106.24-130,600,881.4-
- 17. Cross Electrical Energy Generated (MWH) 52,400 3,212,310 40,776,845 18.- Net Electrical Generated (MWH) 48,957 3,091,475 39,106,112,
- 19. Unit Service Factor 14.8 72.7 56.7
- 20. Unit Availability Factor 14.8 72.7 56.7
- 21. Unit Capacity Factor (Using MDC Net) 6.8 63.0 48.5*
- 22. Unit Capacity Factor (Using DER Net) 6.8 63.0 46.6
- 23. Unit Forced Outage Rate 85.2 18.0 19.0
- 24. Shutdowns Scheduled Over Next 6 Months (Type,Date,and Duration of Each):* Weighted Average
- 25. If Shut Down at End of Report Period. Estimated Date of Startup Est. September 1986
- 26. Units In Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION Y
G608210076 060731 hhIb PDR ADOCK 09000 86 g
(
R l
- s
.}
.t l
l AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-286 UNIT IP-3 DATE 8-1-86 COMPLETED BY L. Kelly TELEPHONE (914) 739-8200 MONTH July 1986 DAY AVERAGE DAILY POWER LEVEL DAY ' AVERAGE DAILY POWER LEVEL-(MWe-Net)
.(MWe-Net) 1 515 17 0
2 514 18 0
3 510 19-0 4
394 20 0
5 90 21 0
6 0
22 0
7 0
23 0
8 0
24 0
9 0
25 0-10 0
26 0
11 0
27' O
12 0
28 0
13 0
29 0
14 0
30 0-15 0
31 0
16 0
i e
{
INSTRUCTIONS:
On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
l' i
i 4
a--,,w.,n-.-m
--w,
,.n,,nm,-,w-ee,--,-,..nw.-n---,e
,,,..,4.,~....-g,.,
,n
,.--n.-.w.<,,-ne,-,,y,4,-,v.w.y n~,-
pw---9mm m.---,.
- " ~ 2 #'
IMKKE'l 'l0.
UNII SilullM)WNS /.ND POWER CEDUCTIONS UNil' N AME r,ai m t.nine n, 3
I DALE 8-1-86 COMi*l.ETER) HY L. Kelly KEPORT MONDI Julv 1986
~IEI.EPilONE 's14-7 3')-8200 n.
E c
53
)
h EE Li ensee E,
%q C.ause & Cuiseceive N..
Hase g
3g g
jgy Evesis gg Assins, go 2 ;5 c lin.w *
<E O Picsen Reconence
$E 5
g v
6 09 860705 F
633.97 A
1 NA HC XXXXXX The plant was removed from service because of decreasing condenser vacuum.
The decreasing condenser vacuum was caused by a leaking flexible expansion joint between low pressure turbine 33 and its associated main condenser 31.
i l
1 I
2 3
4 12 - F.u sed Re.n.m :
Method:
I sinhat l*- Insanictions S Scheduled A Equq> mens F.ntuaclExplam)
I-Manual hu Picp. nation of Data It-Maintenance ni Test 2-Manual Sesam.
1.ntiy Sheets sin I.scensee C Refueling 3-Automatic Ses.am.
twens Rep.nl (I l'R t l'ile INURI'G-
- 1) Regulas.ny Resisission 4-Other I Emplaml allioll j
I-Opeuton Tiannog a Litense 1:ununainm F-Admissists.iiive i
G Oswaalitmal Lisue IF mplain)
I shihiill-S.ime Nunce r8/77)
II Other iliupl. sin)
A MONTHLY I & C CATEGORY I REPORT July 1986 MONTH WRf DATE EOUIPMENT MALFUNCTION CORRECTIVE ACTION 5686 7/2/86 Radiation Monitoring System, Filter paper drive inoperative.
Replaced paper' drive Administrative Building motor gear box.
Effluent Gas Monitor R-46 5760 7/7/86 Reactor Coolant System.
Recorders noc showing Calibrated recorders.
- RCS Loop Temperature proper indication.
Recorders 413-443A &
413-443B 5796 7/9/86 Reactor Protection Intermittent relay chatter.
Replaced bi-stable.
4 Pressurizer Pressure Bi-stable PC-474A l
5797 7/10/86, Radiation Monitoring System, Filter drive motor shorted.
Replaced motor.
l Plant Vent Air Particulate f
Monitor R-13 5765 7/12/86 Radiation Monitoring System, Remote indicator sticks.
Removed, repaired and i
Waste Disposal Liquid calibrated.
Effluent R-18.
5793 7/16/86 Reactor Coolant System, Lo flow alarm inoperative.
Calibrated indicator.
f34 RCP Flow Indication
)
FI-446 5737 7/17/86 Radiation Monitoring System, Recorder inoperative.
Replaced print head, CP4 Panel Script Chart drive cord, florescent Recorder lamp and calibrated.
4
MONTHLY MAINTENANCE. CATEGORY I REPORT July'1986 M
MONTH N
WRf DATE EQUIPh.nl MALFUNCTION CORRECTIVE ACTION-8545 7/1/86 Boric Acid Heat Trace, Open circuit.
Repaired damaged' circuit.
Redundant Circuit #35 8483 7/3/86
, Service Water Pumps Packing' leaks.
Repacked pumps.
- 33 and #34 8538
.7/5/86 Reactor Coolant System, Packing leak.
Repaired valve.
Letdown Isolation Manual Stop Valve 342 8534 7/7/86 Heating and ventilation, Unit will not reset.
Cleaned service water.
Control Room Air Conditioner strainer.
f32A 8637 7/15/86 Residual Heat Removal Seal leak.
Replaced seal gland plate Pump #32~
8556 7/16/86 Chemical and Volume Control Seal leak.
Installed spare pump.
System, Boric Acid Transfer Pump #32 8595 7/16/86 Primary Sampling System, Valve inoperative.-
Replaced fuse.
Pressurizer Steam Sample Valve 951 7593 7/16/86 Service Water System.
Strainer trips.on thermal Replaced (3) thermal overloads.
- 35 Zurn Strainer overload.
8532 7/16/86 Instrument Air Compressor Pump inoperative.
Replaced piston and rider
- 32 rings.
8517 7/18/86 Service Water System, Will not turn or reset.
Cleaned' replaced "0"-ring
- 31 Zurn Strainer and thermal heater.
7990 7/22/86 Steam Generator Blowdown, Body to bonnet leak.
Replaced' valve.
- 32 S/G Blowdown Isolation Valve BD-3
MONTHLY MAINTENANCE CATEGORY I REPORT
.1
' July 1986 MONTH-WRf DATE EQUIPMENT MALFUNCTION CORRECTIVE ACTION 8653 7/23/86 Boric Acid Heat Trace,
.Open Circuit.
Repaired damaged circuit.
Circuit #33 7657-7/24/86 Steam Generator Blowdown, Valve leaks by.
Replaced valve.
- 33 S/G Blowdown Isolation Valve BD-3
..ea
SUMMARY
OF OPERATING EXPERIENCE JULY 1986 Indian Point Unit #3 was synchronized to the bus for a total of 110.3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br />, producing a gross generation of 52,400 MWe for this reporting period.
On July 5, 1986 at 0958 hours0.0111 days <br />0.266 hours <br />0.00158 weeks <br />3.64519e-4 months <br />, the unit was taken off line in response to decreasing condenser vacuum..The condenser vacuum leak was subsequently found in the flexible expansion joint between low pressure turbine #33 and its associated Main Condenser #31. A repair was made to 'the flexible joint and preparations were made for return to service.
While returning the unit to service with the turbine at synchronous speed and isolated from the bus the control room operators observed indications of turbine vibration and condenser leakage. Control room operators proceeded to secure the unit to a pre-startup condition for further investigation. These investigations determined that a low pressure turbine blade had failed. Because of these findings the plant proceeded to the cold shutdown ' condition and entered an unscheduled turbine maintenance outage in order to perform low pressure turbine repairs.
Insilen Point 3 Nuclear Power Plant P.O. Box 215 Buchanan, Newwrk 10511 914 739.8200
- D NewWrkPbwer 4# Authority August 12, 1986 IP3-WAJ-043Z IP3-LK-177H Docket No.
50-286 License No. DPR-64 Director, Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, D.C.
20555 Attention: Document Control Desk
Dear Sir:
Enclosed you will find twelve copies of the monthly operating report relating to Indian Point 3 Nuclear Power Plant for the month of July, 1986.
Very truly yours, fdp Wil A.
osi r ident M a r L aa:3:
Enc res (12 copies) cc:
Dr. Thomas E. Murley, Regional Administrator Region i U.S. Nucicar Regulatory Commission 631 Park Avenue King of Prussia, Pennsylvania 19406 IP3 Resident Inspectors' Office George Wilverding (SRC), WPO J.C. Brons. WP0 S.V. Fuller, NY0 W.R. Yario, NY0 INPO Records Center Suite 1500 1100 circle 75 Parkway 7