OPERATING DATA REPORT DOCKET NO. 50-2 4 7 DATE 10-7-87 COMPLETED BY K.Krieger TELEPHONE ( 914 ) 5 2 6-515 5
' OPERATING STATUS
{
Indian Point Station Unit #2 Notes
- l. Unit Name:
1 September 1987-
- 2. Reporting Period:
-(
2758
- 3. Licensed Thermal Power (MWt):
1013
- 4. Nameplate Rating (Gross MWe):
873
. 5. Design Electrical Rating (Net MWe):
885
- 6. Maximum Dependable Capacity (Gross MWe): 849
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (items Number 3 Through 7) Since Last Report.Gise Reasons:
- 9. Power Level To which Restricted,if Any (Net MWe):
~
- 10. Reasons For Restrictions,if Any:
This Month Yr..to.Da te Cumulative 720-6551 116160
- 11. Hours !n Reporting Period 720 6251.10 80523.00
- 12. Number Of Hours Reactor Was Critical
- 13. Reactor Reserve Shutdown Hours 0
79.43 3768.50
- 14. Hours Generator On.Line 720 6236.82 78300.51 0
0 0
- 15. Unit Resene Shutdown Hours 1933270 16859460 204577036
- 16. Gross Thermal Energy Generated (MWH) 592840 5275540 63532306
- 17. Gross Electrical Energy Generated (MWH)
- 56936T, 5075006 60665588
- 18. Net Electrical Energy Generated (MWH) 100 95.2 67.4
.19. Unit Senice Factor 100 95.2 67.4
- 20. Unit Availability Factor 93.1 90.6 60.8
- 21. Unit Capacity Faefor (Using MDC Net) 90.6 88.7 59.8
- 22. Unit Capacity Factor (Using DER Net)
- 23. Unit Forced Outage Rate 0
1.9 8.6
- 24. Shutdowns Scheduled Over Next 6 Months (Type,Date,and Duration of Each):
unfunlina nutnan started October 5th, 1987.
Proiected to last 68 days.
[.
- 25. IIShut I)own At End Of Report Period. Estimated Date of Startup:
- 26. Units in Test Status (Prior to Commercial Operation):
Forecast Achiesed INITI A L CRITICALITY INITI A L ELECTRICITY N/A CO\\lMERCIA L OPER ATiON 8710220381 870930
%E%
PDR ADOCK 05000247 (9/77)
R PDR
-_-______a
- 1 1
l
}
c
- m. ~
AVERAGE DAfLY UNIT POWER LEVEL
}
- )
DOCKET NO. 50-247 UNIT IP' Unit #2 DATE 10/7/87 COMPLETED BY K i Krieaer
'i a
TELEPHONE ( 914 ) 526-5155
.?
]
MONT11 September 1987 N
, DAY:. AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Net)
(ywe. gen) 811 i;
n 779 808 813
- 2 33 3
809 818 39 669 826
,4 0
5 290 21 812 6
717 811 22 i
813 817-7 23 812 828 g
24 819 831
_9 5
819 832 10 26 816 832 807 826 12
, 73 13 806 29 827 j4 813 826 30 816 15 3,
16 l
-l INSTRUCTIONS l
On this format, list the average daily unit power levelin MWe Net for each day in the reporting rnonth. Compute to the nearest whole rnegawatt.
(9/771
---_____w
r U
e-t a
gM' p
N
(
i7 e
e e 7n8is o~
e l s
si a
t nt nF 4U - ri oa ec) 2 7K4 iDiR tc L
e
- P -
1 e'
e u
E f
0I0 _ 4 v
orL v
c r
o 1K(
i n
l3 ts nf
- 5. E E Y E t
c e
MTBN r tor Inoi te a3 t
e r
O s
ro u
- v. 4 ta N
r A A D O on c ep r
Gah e e
T N D E
E H Co nr pSR iR t
P e
K T T
&t oe ib r yt E
ct E
C N L L eAn
'- t ipr n1 I
e s
e h
tn kt x
r O U P E u
s o
r D
M T a
e ai Ef EE0 C
P em O-C l s 4
[
n ga
'nr it k
ce ar Pu 7
S 8
N 9
x m
O 1
e
.a I
r T
43' v
mc C
r lE aSl 5cS c
r U
e a
cix D
b V
St E
la a m l
m R
duu oe e
onnt h R
t J?0 h a aut E
p
_v eMMAO I
t I
W e
_= 3N S
M1 234 O
S P
l D
3 i
N T
A N
O S
e N
M e
t t
s n r W
T n eo e
v p O
R
.ic E e D
O L
R U
E T
P H
R S
T I
- w. 5 M5 g6 N
a_ E5d
)
U 4
in a
t,gj lp x
E
( t
.sgE s
c e e r
ruT liao f
F ec
_egE tnn 0
ea g e 2. 33 mn n c
el pt el a
- ninu o uif s qa e e aEMR og*
F e - - -
RABCD 2
f 4
te 0
9 i.
D 0
d 7
e 8
l d u ed rce h
A o
c F S o.
/
N N
FS 1
,=?
i,
i i
I h
4
SUMMARY
OF OPERATING EXPERIENCE
]
In general, the unit was operated at 100% reactor power throughout the month of September.
On September 4th at 1235, #22, 25 and 26 circulating water pumps all tripped due to 6.9KV breaker trip.
Rx power was reduced to 90% and 720 MWe.
All pumps were restarted and unit was returned to 100k reactor power by 1340.
On that same day, a leak was detected on an isolation valve tc PT-433.
Reactor power was reduced to 30% to repair leak.
The leak was repaired and power ascension began.at 0100 on'9/5/87.
Due to Xenon oscil-lation, 100% reactor power was not achieved until 0630 on 9/6/87 On 9/17/87 at 0500, reactor power was reduced to 94% to repair #22 HDTP casing. The pump was returned to service at 1605 and the unit was returned to full power.
l l
[.
.-______________j
['.
Murray Selman Vc3 President Consolidated Edison Company of New York. Inc.
)
indian Point Station l
Broadway & Bleakley Avenue j
Buchanan, NY 10511 r
Telephone (914) 737 8116 l
October 15, 1987 I
Re:
Indian Point Unit No. 2 l
Docket No. 50-247 i
l 4
1 Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555 Gentlemen:
3 Enclosed are. twelve copies of the Monthly Operating Report for Indian Point Unit No. 2 for the month of September,1987.
I Very truly yours, l
24.190.10.13.3 Enclosure cc: Director, Office of Management j
and Program Analysis U.S. Nuclear Regulatory Commission Washington, DC 20555 Mr. William Russell Regional Administrator - Region I U.S. Nuclear Regulatory Commission j
631 Park Avenue King of Prussia, PA 19406 Senior Resident Inspector U.S. Nuclear Regulatory Commission P.O. Box 38 Buchanan, NY 10511 i