MONTHYEARML20248B2371998-03-31031 March 1998 Revised Monthly Operating Rept for March 1998 for Indian Point Station Unit 2 ML20029C7801994-03-31031 March 1994 Monthly Operating Rept for Mar 1994 for Indian Point Unit 1. W/940415 Ltr ML20247G5171989-04-30030 April 1989 Monthly Maint Category I Rept Pages from Monthly Operating Rept for Apr 1989 for Indian Point ML20154M5661988-08-31031 August 1988 Monthly Operating Rept for Aug 1988 for Indian Point Station Unit 2 ML20154M5691988-07-31031 July 1988 Revised Page to Monthly Operating Rept for Jul 1988 for Indian Point Station Unit 2 ML20236P9861987-10-31031 October 1987 Monthly Operating Rept for Oct 1987 ML20235Y9681987-09-30030 September 1987 Monthly Operating Rept for Sept 1987 ML20236A5811987-09-30030 September 1987 Monthly Operating Rept for Sept 1987 ML20234D7771987-08-31031 August 1987 Monthly Operating Rept for Aug 1987 ML20237J6511987-07-31031 July 1987 Monthly Operating Rept for Jul 1987 ML20235U7571987-06-30030 June 1987 Monthly Operating Rept for June 1987 ML20215F3711987-05-31031 May 1987 Monthly Operating Rept for May 1987 ML20214H5111987-04-30030 April 1987 Monthly Operating Rept for Apr 1987 ML20214E9541987-04-30030 April 1987 Monthly Operating Rept for Apr 1987 ML20206Q6951987-03-31031 March 1987 Monthly Operating Rept for Mar 1987 ML20206R6201987-03-31031 March 1987 Monthly Operating Rept for Mar 1987 ML20207T1321987-02-28028 February 1987 Monthly Operating Rept for Feb 1987 ML20207R6861987-02-28028 February 1987 Monthly Operating Rept for Feb 1987 ML20206R6451987-02-28028 February 1987 Revised Monthly Operating Rept for Feb 1987 ML20211E1381987-01-31031 January 1987 Monthly Operating Rept for Jan 1987 ML20211J1481987-01-31031 January 1987 Monthly Operating Rept for Jan 1987 ML20212P8891986-12-31031 December 1986 Monthly Operating Rept for Dec 1986 ML20207P9801986-12-31031 December 1986 Monthly Operating Rept for Dec 1986 ML20215E8501986-11-30030 November 1986 Monthly Operating Rept for Nov 1986 ML20211Q0501986-11-30030 November 1986 Monthly Operating Rept for Nov 1986 ML20212L9131986-10-31031 October 1986 Monthly Operating Rept for Oct 1986 ML20214D0211986-10-31031 October 1986 Monthly Operating Rept for Oct 1986 ML20203P1081986-09-30030 September 1986 Monthly Operating Rept for Sept 1986 ML20209J0801986-08-31031 August 1986 Monthly Operating Rept for Aug 1986 ML20214K4281986-07-31031 July 1986 Monthly Operating Rept for Jul 1986 ML20207C3021986-06-30030 June 1986 Monthly Operating Rept for June 1986 ML20207C3171986-06-30030 June 1986 Monthly Operating Rept for June 1986 ML20211F7351986-05-31031 May 1986 Monthly Operating Rept for May 1986 ML20198A2731986-04-30030 April 1986 Monthly Operating Rept for Apr 1986 ML20205P6911986-04-30030 April 1986 Monthly Operating Rept for Apr 1986 ML20141E6071986-03-31031 March 1986 Monthly Operating Rept for Mar 1986 ML20141E6121986-03-31031 March 1986 Monthly Operating Rept for Mar 1986 ML20140B8481986-02-28028 February 1986 Monthly Operating Rept for Feb 1986 ML20154P0171986-02-28028 February 1986 Monthly Operating Rept for Feb 1986 ML20141D2331986-01-31031 January 1986 Monthly Operating Rept for Jan 1986 ML20153E3491986-01-31031 January 1986 Monthly Operating Rept for Jan 1986 ML20140B8541986-01-31031 January 1986 Rev I to Monthly Operating Rept for Jan 1986 ML20140A8211985-12-31031 December 1985 Monthly Operating Rept for Dec 1985 ML20141J1861985-12-31031 December 1985 Monthly Operating Rept for Dec 1985 ML20138P4981985-11-30030 November 1985 Monthly Operating Rept for Nov 1985 ML20138M5941985-11-30030 November 1985 Monthly Operating Rept for Nov 1985 ML20136E8811985-10-31031 October 1985 Monthly Operating Rept for Oct 1985 ML20138J7921985-09-30030 September 1985 Monthly Operating Rept for Sept 1985 ML20205C7241985-08-31031 August 1985 Monthly Operating Rept for Aug 1985 ML20134F6881985-07-31031 July 1985 Monthly Operating Rept for Jul 1985 1998-03-31
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217H8501999-10-14014 October 1999 Safety Evaluation Supporting Amend 197 to License DPR-64 ML20206U2551999-02-0909 February 1999 Safety Evaluation Supporting Amend 187 to License DPR-64 ML20236Y1571998-08-0303 August 1998 Part 21 Rept Re ASTM A351,GR. CF8 Matl at Indian Point Being Out of Specifications in Molybdenum & Chromium.Cause & Corrective Actions Are Not Stated ML20236V4281998-07-13013 July 1998 Safety Evaluation of TRs WCAP-14333P & WCAP-14334NP, PRA of RPS & ESFAS Test Times & Completion Times. Repts Acceptable ML20236T5511998-06-24024 June 1998 Consolidated Edison Co of Ny,Indian Point Unit 2,Drill Scenario Number 1998C ML20248B2371998-03-31031 March 1998 Revised Monthly Operating Rept for March 1998 for Indian Point Station Unit 2 ML17264A9381997-07-10010 July 1997 Deficiency Rept Re Potential Safety Hazard Associated w/FM-Alco 251 Engin,High Pressure Fuel tube-catalog: 4401031-2 in Which Dual Failure Mode Exists.Caused by Incorrect Forming Process ML18153A1431997-06-10010 June 1997 Part 21 Rept Re Possible Machining Defect in Certain Stainless Steel Swagelok Tube Fitting Bodies.Facilities Have Been Notified About Possible Problem ML20210E3591997-03-27027 March 1997 Part 21 Rept Re Sorrento Electronics Inc Has Determined Operation & Maint Manual May Not Adequately Define Requirements for Performing Periodic Surveillance of SR Applications.Caused by Hardware Failures.Revised RM-23A ML1005008001997-02-28028 February 1997 Conditional Extension of Rod Misalignment TS for Indian Point 3. ML20115J3981996-07-22022 July 1996 Interim Part 21 Rept Re 3/4 Schedule 80 Pipe Furnished to Consolidated Power Supply.Investigation Revealed Only One Nuclear Customer Involved in Sale of Matl ML20096E5101995-12-31031 December 1995 Resubmitted Rev 13 to QA Program ML17059A3611994-07-0606 July 1994 Emergency Action Level Verification & Validation Rept. ML17311A0181994-05-13013 May 1994 New York State EAL Upgrade Project Verification & Validation Rept. ML20029C7801994-03-31031 March 1994 Monthly Operating Rept for Mar 1994 for Indian Point Unit 1. W/940415 Ltr ML20056E5171993-08-31031 August 1993 Technical Review Rept, Tardy Licensee Actions ML20062J2281993-07-23023 July 1993 Consolidated Edison Co of Ny Indian Point Unit 2,Drill Scenario 1993 ML20118A2681992-12-31031 December 1992 Consolidated Edison Co of Ny Indian Point,Unit 2 Exercise Scenario,1992 ML20125C7161992-12-0707 December 1992 Part 21 Rept Re Possibility for Malfunction of Declutching Mechanisms in SMB/SB-000 & SMB/SB/SBD-00 Actuators. Malfunction Only Occurs During Seismic Event.Balanced Levers May Be Purchased from Vendor.List of Affected Utils Encl ML20127P5861992-11-23023 November 1992 Followup to 921005 Part 21 Rept Re Potential Defect in SB/SBD-1 Housing Cover Screws.Procedure Re Replacement of SBD-1 Spring Cover Bolts Encl.All Fasteners Should Be Loosened & Removed.List of Affected Utils Encl ML20096H2301992-05-21021 May 1992 Special Rept:On 920504,south Side Lower Electrical Tunnel Detection Sys 8 Taken Out of Svc for Mod to Reposition Detection Sys Run of Conduit.Detection Sys Declared Operable on 920520 After Mod Completed & Sys Retested ML20079F9181991-05-31031 May 1991 Structural Evaluation of Indian Point,Units 2 & 3 Pressurizer Surge Lines,Considering Effects of Thermal Stratification ML20059E9461990-08-31031 August 1990 Nonproprietary Rev 2 to Indian Point 2 Tube Fatigue Reevaluation ML20059G2011990-07-31031 July 1990 Final Rept on Steam Generator Insp, Repair & Restoration Efforts During 1990 Midcycle Insp ML20058K4151990-06-30030 June 1990 Steam Generator Insp,Repair & Restoration Program Presentation to Nrc ML20058K4121990-06-30030 June 1990 Status Rept,Indian Point Unit 2 Mid-Cycle Steam Generator Insp Presentation to Nrc ML20043A4891990-05-30030 May 1990 Nonproprietary Indian Point Unit 2 Steam Generator Insp, Repair & Restoration Program. ML20042F1441989-12-31031 December 1989 New York Power Authority Annual Rept for 1989. W/900430 Ltr ML19332B9371989-11-30030 November 1989 Nonproprietary Info Presented to NRC Re Indian Point Unit 2 Steam Generator Secondary Side Loose Objects. ML19332D6661989-10-31031 October 1989 Nonproprietary Rev 2 to Indian Point Unit 2 Steam Generator Girth Weld/Feedwater Nozzles Rept Spring,1989 Outage. ML20247J8161989-07-31031 July 1989 Safety Evaluation for UHS Temp Increase to 95 F at Indian Point Unit 3 ML20248B3171989-06-30030 June 1989 Rev 1 to Nonproprietary WCAP-12294, Indian Point Unit 2 Steam Generator Girth Weld/Feedwater Nozzles Rept,Spring 1989 Outage ML20248D3631989-06-30030 June 1989 Rev 1,to Indian Point Unit 3 Reactor Vessel Fluence & Ref Temp PTS Evaluations ML20247N5331989-05-31031 May 1989 Nonproprietary Indian Point Unit 2 Steam Generator Girth Weld/Feedwater Nozzles Rept Spring,1989 Outage ML20247J8071989-05-31031 May 1989 Containment Margin Improvement Analysis for Indian Point Unit 3 ML20247G5171989-04-30030 April 1989 Monthly Maint Category I Rept Pages from Monthly Operating Rept for Apr 1989 for Indian Point ML20244C3311989-04-10010 April 1989 Safety Evaluation Supporting Amend 137 to License DPR-26 ML20248F4211989-03-31031 March 1989 NSSS Stretch Rating-3,083.4 Mwt Licensing Rept ML20235V5931989-03-0202 March 1989 Special Rept:During Cycle 6/7 Refueling Outage Scheduled from Feb-May 1989,openings Will Be Made in Plant Penetration Fire Barriers in Order to Install Various Mods. Fire Watches Posted & Fire Detection Tests Completed ML20248F3001988-12-31031 December 1988 10CFR50.59(b) Rept of Changes,Tests & Experiments Completed in 1988 ML20246E2711988-12-31031 December 1988 Con Edison 1988 Annual Rept ML20196D3011988-10-31031 October 1988 Reactor Vessel Matl Surveillance Program for Indian Point Unit 2 Analysis of Capsule V ML20155H2541988-09-30030 September 1988 Rev 2 to Indian Point Unit 2 (NRC Bulletin 88-008 Thermal Stresses in Piping Connected to RCS) Indentification of Unisolable Piping & Determination of Insp Locations ML20154M5661988-08-31031 August 1988 Monthly Operating Rept for Aug 1988 for Indian Point Station Unit 2 ML20154M5691988-07-31031 July 1988 Revised Page to Monthly Operating Rept for Jul 1988 for Indian Point Station Unit 2 ML20151N7881988-07-31031 July 1988 Rev 1 to Charpy Toughness & Brittle Transition Temp Characterization of HAZ High Hardness Zone of Indian Point Unit 2 Steam Generator Girth Weld by Gleeble Weld Thermal Cycle Simulation ML20006B4741988-05-31031 May 1988 Nonproprietary Indian Point Unit 2 Evaluation for Tube Vibration Induced Fatigue. ML20151N7821988-05-31031 May 1988 Fracture Sensitivity Study of Girth Weld 6 Repaired Configuration,Indian Point Unit 2 ML20153F9161988-04-28028 April 1988 Changes,Tests & Experiments - 1986 ML20151T4681988-01-31031 January 1988 Experimental & Finite Element Evaluation of Spent Fuel Rack Damping & Stiffness 1999-02-09
[Table view] |
Text
-- - - - . . - _ - . - . . _ - . . - - - - - . . - - - -
. ~
.,.,y .
~
OPERATING DATA REPORT I DOCKET NO. 50-2 4 7
- DATE 10-7-87 COMPLETED BY K.Krieger TELEPHONE ( 914 ) 5 2 6-515 5
' OPERATING STATUS
{
Indian Point Station Unit #2 Notes ,
- l. Unit Name: 1
- 2. Reporting Period:
September 1987-2758 -(
- 3. Licensed Thermal Power (MWt):
- 4. Nameplate Rating (Gross MWe):
1013 ,,
. 5. Design Electrical Rating (Net MWe): 873
- 6. Maximum Dependable Capacity (Gross MWe):
885
- 7. Maximum Dependable Capacity (Net MWe): 849
- 8. If Changes Occur in Capacity Ratings (items Number 3 Through 7) Since Last Report.Gise Reasons: * ,.
~
- 9. Power Level To which Restricted,if Any (Net MWe):
- 10. Reasons For Restrictions,if Any: -
This Month Yr..to.Da te Cumulative
- 11. Hours !n Reporting Period 720- 6551 116160
- 12. Number Of Hours Reactor Was Critical 720 6251.10 80523.00
- 13. Reactor Reserve Shutdown Hours 0 79.43 3768.50
- 14. Hours Generator On.Line 720 6236.82 78300.51 0 0 0
- 15. Unit Resene Shutdown Hours
- 16. Gross Thermal Energy Generated (MWH) 1933270 16859460 204577036 .
- 17. Gross Electrical Energy Generated (MWH) 592840 ,
5275540 63532306 56936T, 5075006 60665588
- 18. Net Electrical Energy Generated (MWH)
.19. Unit Senice Factor 100 95.2 67.4 '
- 20. Unit Availability Factor 100 95.2 67.4 93.1 90.6 60.8
- 21. Unit Capacity Faefor (Using MDC Net) 90.6 88.7 59.8
- 22. Unit Capacity Factor (Using DER Net)
- 23. Unit Forced Outage Rate 0 1.9 8.6
- 24. Shutdowns Scheduled Over Next 6 Months (Type,Date,and Duration of Each):
unfunlina nutnan started October 5th, 1987. Proiected to last 68 days.
[.
- 25. IIShut I)own At End Of Report Period. Estimated Date of Startup:
- 26. Units in Test Status (Prior to Commercial Operation): Forecast Achiesed INITI A L CRITICALITY INITI A L ELECTRICITY . N/A CO\lMERCIA L OPER ATiON 8710220381 870930 PDR ADOCK 05000247
%E% (9/77)
R PDR
_ -_-______a
- 1 < ,
1
}
l c ;
- m. ~ '
AVERAGE DAfLY UNIT POWER LEVEL
. , , }
- )
DOCKET NO. 50-247 UNIT IP' Unit #2 DATE 10/7/87
'i COMPLETED BY K i Krieaer -
a TELEPHONE ( 914 ) 526-5155
.?
]
MONT11 September 1987
, DAY: . AVERAGE DAILY POWER LEVEL * '
DAY "
N AVERAGE DAILY POWER LEVEL (MWe Net) (ywe. gen) .,
811 i;
n 779
- 2 808 813 33 3 809 818 39
,4 669 826 0
5 290 21 812 .
i 6 717 22 811 7
813 817-23 g 812 828 24
_9 819 831 5
10 819 832 26
,, 816 832 12 807 , 73 826 13 806 29 827 j4 813 30 826 15 816 3, 16 .
l
-l INSTRUCTIONS l On this format, list the average daily unit power levelin MWe Net for each day in the reporting rnonth. Compute to the nearest whole rnegawatt.
(9/771
---_____w
e- r U
-: p a N t ,
i7 gM' e
e e
(
7n8is - o~ s a e
si l
4U - ri t nt nF 2 7K4
' - oa e c)
- P - 1 e iDiR tc f L e' e E 0I0 _ 4 v c v . u r orL o 1K( i t
e n l3 ts nf(
5.O E E Y E c e r a3 s t r
N MTBN AA DO r tor r
on ce u v. 4 Inoi- ta te o r ep TNDEH CoiR nr Gah pSR e
E T P t
er yt KT E E
&t ct oe ib ipr n1 CN I
L L eAn e s
'- t h e O PE u kt x r tn DU s
a e Ef oEE0 ai MT C r P em
_ O- l s C
4 n
[
ga
'nr it
_ k ce ar
- Pu 7
S 8 O
N 9 x m
_ 1 ..
e .ar I
v T 43'
- mc C r 5cS lE aSl r c U e a cix D b V Sta E l m la a m R e duu onntoeh R t J?0 h a aut E p I eMMAO t
_v I W
O e _= 3N S M1 234 P S
_ D l i 3 T
N
_ ' A N O
S e #
N M e s n r t t T n W e eo v p O R .ic E e D O L R
_ T P
_ U E H R S
T N
I
- w. 5 M5 g6 )
U a_ E5d 4 in t,gj a lp x
E
( t
.sgE s r c e r e uT f
F liao e
_egE c tnn ea g 0
e 2. 33 c mnelel nai pt
- ninu o uif s qa e e og* F aEMR e - - -
RABCD 2
f 4
0 te 9 i.
_ D 0 d
7 e 8
l d u ed
. rce h A o c
/ F S
- o. N : :
N FS 1
- ,=?
i ,
i i
. I h 4 ,
SUMMARY
OF OPERATING EXPERIENCE ]
In general, the unit was operated at 100% reactor power throughout the month of September.
On September 4th at 1235, #22, 25 and 26 circulating water pumps all tripped due to 6.9KV breaker trip. Rx power was reduced to 90% and 720 MWe. All pumps were restarted and unit was returned to 100k reactor power by 1340. On that same day, a leak was detected on an isolation valve tc PT-433. Reactor power was reduced to 30% to repair leak. The leak was repaired and power ascension began.at 0100 on'9/5/87. Due to Xenon oscil-lation, 100% reactor power was not achieved until 0630 on 9/6/87 On 9/17/87 at 0500, reactor power was reduced to 94% to repair #22 HDTP casing. The pump was returned to service at 1605 and the unit was returned to full power.
l l
[. .-______________j
['.
Murray Selman
- . ,., , Vc3 President Consolidated Edison Company of New York. Inc. )
indian Point Station l Broadway & Bleakley Avenue !
Buchanan, NY 10511 r j Telephone (914) 737 8116 "'
l October 15, 1987 I
Re: Indian Point Unit No. 2 l Docket No. 50-247 i l
4 1
Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555 Gentlemen: 3 Enclosed are. twelve copies of the Monthly Operating Report for Indian Point Unit No. 2 for the month of September,1987.
I Very truly yours, l
24.190.10.13.3 Enclosure cc: Director, Office of Management j and Program Analysis U.S. Nuclear Regulatory Commission Washington, DC 20555 Mr. William Russell Regional Administrator - Region I U.S. Nuclear Regulatory Commission j 631 Park Avenue King of Prussia, PA 19406 Senior Resident Inspector U.S. Nuclear Regulatory Commission P.O. Box 38 Buchanan, NY 10511 i