ATTACHMENT I Revised Operating Data Report, Unit Shutdown and Power Reductions and Major Safety Related Correction Maintenance for the month of February 1987 Consolidated Edison Company of New York, Inc.
Indian Point Unit No. 2 Docket No. 50-247 April 1987 8704220202 870415 PDR ADOCK 05000247 R
p99
OPERATING DATA REPORT DOCKET NO.
50-247 DATE 3-6-87 COMPLETED BY K_ Krieaer TELEPHONE (914 )526-5155 OPERATING STATUS Indian Point Station Unit No. 2 Notes
- 1. Unit Name:
- 2. Reporting Period:
February 1987 2758
- 3. Licensed Thermal Power (MWt):
1013
- 4. Nameplate Rating (Gross MWe):
873
- 5. Design Electrical Rating (Net MWe):
900 6.. Masimum Depen. 'able Capacity (Gross MWe):
864
- 7. Masimum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
NONE
- 9. Power Level To Which Restricted,if Any (Net MWe):
- 10. Reasons For Restrictions,if Any:
This Month Yr. to.Date Cumulative 672 1416 111025 i1. Hours in Reporting Period 461.68 1179.75 75451.65
- 12. Number Of Hours Reactor Was Critical 53.50 79.43 3768.50
- 13. Reactor Resene Shutdown Hours 1',0.90 1168.97 73232.66
- 14. Hours Generator On-Line
- 15. Unit Resene Shutdown Hours 0
0 0
1160875 3038678 190756254
- 16. Gross Thermal Energy Generated (MWH) :
y 368990 963490 59220256
- 17. Gross Electrical Energy Generated (MWH) 350503 923065 56513647
- 18. Net Electrical Energy Generated (MWH)
- 19. Unit Service Factor 67.1 82.6 66.0 67.1 82.6 66.0
- 20. Unit Availability Factor 60.4 75.4 59.3
- 21. Unit Capacity Factor (Using MDC Net) 59.7 74.7 58.3
- 22. Unit Capacity Factor (Using DER Net)
- 23. Unit Forced Outage Rate 11.2 4.6 9.1
- 24. Shutdowns Scheduled Oser Next 6 Months (Type. Date.and Duration of Each):
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
- 26. Units in Test Status (Prior to Commercial Operation):
Forecast Achiesed INITIA L CRITICALITY
/
/
INITIA L ELECTRICITY
/
N/A COMMERCIAL OPER ATION
/
/
/
/
(9/77 )
i 50-247 DOCKET NO.
UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT N AME IP Unit #2 f
DATE 3-6-87 t
COMPLETED BY K. Krieaer REPORT MONTH Feb. 1987-TELEPHONE (9141576 9159' "E
. 5.n z g
.=2 _e E
- , s X Licensee g-t, c4 Cause & Corrective ei
. No.
Date g
3g 3
.g g &
Event
- s 7 E.?
Action to H
5 j5 Report e
<N0 0
Present Recurrence C
t 1
870130 S
164.47 H
1 HA Genera-Scheduled outage to inspect generator.
D 2
870210 F
56.63 G
3 87-004 IA Insp
. Operator Error N/A 870227 F
0 A
4 HH HTgxch High steam generator chlorides.
l I
2 3
4 F: Forced Reason:
Method:
Exhibit G - Instructiims S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance of Test 2-Manual Scram.
Entry Sheets for Licensee C-Refueling 3-Automatic Scram.
Event Report (LE R) File (NUREG-D. Regulatory Restriction 4-Other (Explain) 0161)
E-Operator Training & License Examination 5
F-Administrative Exhibit I - Same Source G-Operational Error (Explain)
(9/77) iI-Other (Explain) i e
.o..
MAJOR SAFETY RELATED CORRECTIVE MAINTENANCE MWO SYSTEM COMPONENT DATE WORK PERFORMED 20928 EDG 21 EDG 12-30-86 Replaced Compressor 26665 CCW 21 CC Pump 12-08-86 Replaced Rot. Element 26122 CVCS 204B Valve 12-31-86 Remade Bonnet Joint 26386 CVCS 22 Charging Pump 12-10-86 Welded in New Nipple 27797 CVCS 21 Seal Inj Fltr 12-19-86 Replaced O Ring 18264 MS PCV 1310 B 12-06-86 Repacked Valve 27454 CVCS 21 BATP 12-11-86 Repaired Seal 26254 CVCS 22 Charging Pump 12-10-86 Repacked Pump 24936 RHR 22 RHR Pump 12-18-86 Installed seal 21805 CVCS 23 Charging Pump 12-30-86 Repacked Pump 23373 CRD 23 CRD Fan 12-08-86 Replaced Motor 26667 RHR 21 RHR Pump 12-26-86 Replaced Seal