ML20207C302

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for June 1986
ML20207C302
Person / Time
Site: Indian Point Entergy icon.png
Issue date: 06/30/1986
From: Josiger W, Kelly L
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
To:
NRC OFFICE OF ADMINISTRATION (ADM), NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
References
LK-IP3-160H, LK-IP3-160HZ, WAJ-IP3-039Z, WAJ-IP3-39Z, NUDOCS 8607210331
Download: ML20207C302 (7)


Text

OPERATING DATA REPORT Docket No.

50-286 Date 07-01-86 Completed By L. Kelly Telephone 914-739-8200 OPERATING STATUS 1.

Unit Name:

Indian Point No. 3 Nuclear Power Plant Notes 2.

Reporting Period:

June 1986 3.

Licensed Thermal Power (MWt):

3025 4.

Nameplate Rating (Gross MWe):

1013 5.

Design Electrical Rating (Net MWe):

965 6.

Maximum Dependable Capacity (Gross MWe):

1000 7.

Maximum Dependable Capacity (Net MWe):

965 8.

If Changes Occur in Capacity Ratings (Items Number 3 through 7) Since Last Report.

Give Reasons:

9.

Power Level to Which Restricted, If Any (Net MWe):

515 Net MWe 10.

Reasons for Restrictions, If Any:

  1. 32 Main Transformer is out of service for inspections and replacement, and is unavailable until August 1986.

This Month Yr. to Date Cumulative 11.

Hours In Reporting Period 720 4,343 86,208 12.

Number of Hours Reactor Was Critical 691.74 3,653.31 50,920.69 13.

Reactor Reserve Shutdown Hours 0

0 0

14.

Hours Generator On-Line 669 3,586.56 49,219.53 15.

Unit Reserve Shutdown Hours 0

0 0

16.

Gross Thermal Energy Generated (MWH) 1,179,256.49 9,641,642.96 130,419,418.1 17.

Gross Electrical Energy Generated (MWH) 365,660 3,159,910 40,724,445 18.

Net Electrical Generated (MWH) 344,438 3,042,516 39,057,155 19.

Unit Service Factor 92.9 82.6 57.1 20.

Unit Availability Factor 92.9 82.6 57.1 21.

Unit Capacity Factor (Using MDC Net) 49.6 72.6 48.9*

22.

Unit Capacity Factor (Using DER Net) 49.6 72.6 46.9 23.

Unit Forced Outage Rate 4.1 4.7 18.8 24.

Shutdowns Scheduled Over Next 6 Months (Type,Date,and Duration of Each):

  • Weighted Average 25.

If Shut Down at End of Report Period. Estimated Date of Startup:

26.

Units In Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMFERCIAL OPERATION 8607210331 860630

%EM PDR ADOCK 05000286 f/

R PDR

//

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

50-286 l

Indian Point UNIT No. 3 6

DATE July 01 1986 COMPLETED BY L K llY TELEPHONE (914) 739-8200 MONTH DAY AVERAGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL (MWe Net) i MWe-Net i 467 514 g

37 3

470 gg 514 488 514 3

99 4

507 20 512 2

512 5

3, 508 511 6

20 509 7

23 8

285 34 510 661 512 9

33 10 633 26 512 631 513 g

37 617 g3 33 510 573 512 13 29 1

511 14 30 284 15 3,

513 16 I

i

)

INSTRUCTIONS On this format,hst the average daily unit power levelin MWe Net for each day in the reporting month. Compute to the nearest whole megawatt.

(9 /77 )

l

1

'"~2"b DOCKEl'lo.

i UNil~ SilulDOWNS /.ND POWER REDUCIlONS UNil NAME r,uiian r>n i n t no 3

DA'IE July 01 1986 COMPl.ETED HY L Kellv REPOR l' MON 111 JUNE 1986 p

y y,g _ j 39_g. Ou 2

g jg 3

y $3 Licensee E,.

l*.

Cause & Consective i

N...

Date Q

5g s

255 Evesil 3, y g'3 Action to fI Egc 1:s por: #

mO Pecseni Retursence H

o 2

g u

6 t

07 860607 S

22.20 B

1 N/A XX TRANSF To reconnect #32 Main Transformer af ter completing transformer inspec-tion.

08 860614 F

28.8 A

1 N/A XX TRANSF To disconnect #32 Main Transformer for further inspection and subsecuent replacement.

I n

f I

2 3

4 F: Forced Reason:

Meilmd; 1 slutui - Insiincei uis S: Scliedaded A-Equipment Failure (Explam) 1 -Manual los Pacpasanon ol' Daia B. Maintenance ni Test 2 Manual Sciam.

I nuy Sliceis im 1.icemee i

C-Ref'ucling 3-Automatic Scram.

1:veni Rep.us (l 1 R n lite (NilRI'G-l D-Regulatory Rest:iction 4-Ot her ( Explain) 0161) li-Opesato Tsaining & License Examinition i

F Administsative 5

G.Opesational En ros IExplain)

I sIntui11 Same Somce 19/77) 11 Other (Explain) 1

._- ~. _

MONTHLY I & C CATEGORY I REPORT June 1986 MONTH WR#

DATE EQUIPMENT MALFUNCTION CORRECTIVE ACTION 1

5319 6/1/86 Reactor Coolant System, #34 Seal Indicator drifted low.

Replaced RTD terminal block.

Return Outlet Temperature Indicator TI-125.

5637 6/3/86 Feedwater System, #34 Steam Valve positioner return motion Reattached feedback string.

Generator Low Flow Bypass linkage string loose.

Valve.

5689 6/6/86 Boric Acid Heat Trace, Test light working Adjusted current adjustment.

Redundant Circuit #35.

intermittantly.

l 5706 6/9/86

  1. 32 Instrument Las Static No voltage output.

Replaced DC-DC converter Inverter.

board, voltage sensing transformer, and AC output l

fuses.

5571

~6/11/86 Hydrogen Recombiner, #31 H -0 Recorder not working properly.

Replaced controller and 2 2 Flow Ratio Recorder and calibrated.

Controller.

5617 6/11/86 Isolation Valve Seal Water, Transmitter and indicator out of Calibrated transmitter.

Tank Level Transmitter #1078.

calibration.

5687 6/11/86 Plant computer, Qualified Test light comes up when unit Repaired broken wire.

Safety Parameter Display is not in test.

System Channel B.

5719 6/17/86 Radiation Monitoring System, High voltage power supply Replaced power supply.

j V.C. Gas Monitor R-12.

regulating transistor shorted.

5543 5/22/86 Reactor Coolant System, Indicator failed high.

Replaced R/I converter and Pressurizer Safety Valve calibrated.

4 Temperature Indicator TI-465.

5709 6/24/86 Radiation Monitoring System, Erratic readings on high range.

Replaced circuit card.

')

Wide-Range Noble Gas Stack Monitor R-27.

1 4

3 5663 5/31/86 Reactor Coolant System #31 Loose connection on RTD.

Repaired loose connection and Hot Leg Temperature Element 411A.

retested.

MONTHLY MAINTENANCE CATEGORY I REPORT June 1986 MONTH WR#

DATE EQUIPMENT MALFUNCTION CORRECTIVE ACTION l

8411 6/2/86 Main steam valve MS-54.

Body to bonnet leak.

Sealed valve leak.

8427 6/4/86 Central Control Room Air Reduced cooling capacity.

Repaired service water-Conditioning.

strainer to CCR A/C.

8400 6/4/86 Radiation Monitor System Sample pump inoperative.

Replaced pump.

Channel 1 I M nitor.

2 8439 6/5/86 Main Steam Valve MS-54.

Body to bonnet leak.

Sealed valve leak.

8459 6/7/86

  1. 31 Instrument Air Heat Tube bundle needs cleaning.

Cleaned tube bundle.

Exchanger.

8428 6/9/86

  1. 32 Spent Fuel Pit Cooling Pump discharge pressure Cleaned strainer and Pump.

oscillating.

piping.

8464 6/11/86

  1. 32 Spent Fuel Pit Pump.

Pump inoperative.

Repaired pump.

8333 6/12/86 Service Water System Zurn Solenoid does not close Cleaned and re-installed.

Strainer Auto Wash Valve valve PCV-1206.

PCV-1206 Solenoid.

8415 6/16/86

  1. 31 Boric Acid Transfer Pressure gauge inoperative.

Replaced gauge.

Pump Pressure Indicator PI-190A.

e

SUMMARY

OF OPERATING EXPERIENCE JUNE 1986 Indian Point Unit #3 was synchronized to the bus for a total of 669.00 hours0 days <br />0 hours <br />0 weeks <br />0 months <br />, producing a gross generation of 3657660 MWe for this reporting period.

On June 07 at 0320 hours0.0037 days <br />0.0889 hours <br />5.291005e-4 weeks <br />1.2176e-4 months <br /> the unit was taken off line in a controlled shutdown in order to reconnect No. 32 Main Transformer, which was removed from service for inspection on May 25 at 1920 hours0.0222 days <br />0.533 hours <br />0.00317 weeks <br />7.3056e-4 months <br />. No problems were incurred during the reconnection. The unit was returned to service on June 08 at 0132 hours0.00153 days <br />0.0367 hours <br />2.18254e-4 weeks <br />5.0226e-5 months <br />.

On June 14 at 0100 hours0.00116 days <br />0.0278 hours <br />1.653439e-4 weeks <br />3.805e-5 months <br /> the unit was taken off line in a controlled shutdown in order to disconnect No. 32 Main Transformer for further inspection. No problems were incurred during the disconnection. The unit was returned to service on June 15 at 0548 hours0.00634 days <br />0.152 hours <br />9.060847e-4 weeks <br />2.08514e-4 months <br />.

f 4

- - + -

,.-e,

, -.~. -

,n y

r-

.,,me,-+-w--r-,

Indian Point 3 Nuclear Power Plant P.O. Box 215 Buchanan, New York 10511 914 739 8200

  1. > NewYorkPbwer 4# Authority July 15, 1986 WAJ-IP3-039Z LK-IP3-160H Docket No.

50-286 License No. DPR-64 Director, Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, D.C.

20555 Attention: Document Control Desk

Dear Sir:

Enclosed you will find twelve copies of the monthly operating report relating to Indian Point 3 Nuclear Power Plant for the month of June, 1986.

Very truly yours, Will osige dent Ma age LK/rj:2:1 nelosur (12 copies) cc:

Dr. Thomas E. Murley, Regional Administrator Region 1 U.S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, Pennsylvania 19406 IP3 Resident Inspectors' Office George Wilverding (SRC) WPO J.C. Brons, WPO S.V. Fuller, NYO W.R. Yario, NYO INPO Records Center Suite 1500 1100 Circle 75 Parkway Atlanta, Georgia 30339 d

9 f/?1

?

I

\\

i

<