Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARML20248B2371998-03-31031 March 1998 Revised Monthly Operating Rept for March 1998 for Indian Point Station Unit 2 ML20029C7801994-03-31031 March 1994 Monthly Operating Rept for Mar 1994 for Indian Point Unit 1. W/940415 Ltr ML20247G5171989-04-30030 April 1989 Monthly Maint Category I Rept Pages from Monthly Operating Rept for Apr 1989 for Indian Point ML20154M5661988-08-31031 August 1988 Monthly Operating Rept for Aug 1988 for Indian Point Station Unit 2 ML20154M5691988-07-31031 July 1988 Revised Page to Monthly Operating Rept for Jul 1988 for Indian Point Station Unit 2 ML20236P9861987-10-31031 October 1987 Monthly Operating Rept for Oct 1987 ML20235Y9681987-09-30030 September 1987 Monthly Operating Rept for Sept 1987 ML20236A5811987-09-30030 September 1987 Monthly Operating Rept for Sept 1987 ML20234D7771987-08-31031 August 1987 Monthly Operating Rept for Aug 1987 ML20237J6511987-07-31031 July 1987 Monthly Operating Rept for Jul 1987 ML20235U7571987-06-30030 June 1987 Monthly Operating Rept for June 1987 ML20215F3711987-05-31031 May 1987 Monthly Operating Rept for May 1987 ML20214H5111987-04-30030 April 1987 Monthly Operating Rept for Apr 1987 ML20214E9541987-04-30030 April 1987 Monthly Operating Rept for Apr 1987 ML20206Q6951987-03-31031 March 1987 Monthly Operating Rept for Mar 1987 ML20206R6201987-03-31031 March 1987 Monthly Operating Rept for Mar 1987 ML20207T1321987-02-28028 February 1987 Monthly Operating Rept for Feb 1987 ML20207R6861987-02-28028 February 1987 Monthly Operating Rept for Feb 1987 ML20206R6451987-02-28028 February 1987 Revised Monthly Operating Rept for Feb 1987 ML20211E1381987-01-31031 January 1987 Monthly Operating Rept for Jan 1987 ML20211J1481987-01-31031 January 1987 Monthly Operating Rept for Jan 1987 ML20212P8891986-12-31031 December 1986 Monthly Operating Rept for Dec 1986 ML20207P9801986-12-31031 December 1986 Monthly Operating Rept for Dec 1986 ML20215E8501986-11-30030 November 1986 Monthly Operating Rept for Nov 1986 ML20211Q0501986-11-30030 November 1986 Monthly Operating Rept for Nov 1986 ML20212L9131986-10-31031 October 1986 Monthly Operating Rept for Oct 1986 ML20214D0211986-10-31031 October 1986 Monthly Operating Rept for Oct 1986 ML20203P1081986-09-30030 September 1986 Monthly Operating Rept for Sept 1986 ML20207G2961986-09-30030 September 1986 Monthly Operating Rept for Sept 1986 ML20209J0801986-08-31031 August 1986 Monthly Operating Rept for Aug 1986 ML20214K4281986-07-31031 July 1986 Monthly Operating Rept for Jul 1986 ML20207C3021986-06-30030 June 1986 Monthly Operating Rept for June 1986 ML20207C3171986-06-30030 June 1986 Monthly Operating Rept for June 1986 ML20211F7351986-05-31031 May 1986 Monthly Operating Rept for May 1986 ML20198A2731986-04-30030 April 1986 Monthly Operating Rept for Apr 1986 ML20205P6911986-04-30030 April 1986 Monthly Operating Rept for Apr 1986 ML20141E6071986-03-31031 March 1986 Monthly Operating Rept for Mar 1986 ML20141E6121986-03-31031 March 1986 Monthly Operating Rept for Mar 1986 ML20140B8481986-02-28028 February 1986 Monthly Operating Rept for Feb 1986 ML20154P0171986-02-28028 February 1986 Monthly Operating Rept for Feb 1986 ML20141D2331986-01-31031 January 1986 Monthly Operating Rept for Jan 1986 ML20153E3491986-01-31031 January 1986 Monthly Operating Rept for Jan 1986 ML20140B8541986-01-31031 January 1986 Rev I to Monthly Operating Rept for Jan 1986 ML20140A8211985-12-31031 December 1985 Monthly Operating Rept for Dec 1985 ML20141J1861985-12-31031 December 1985 Monthly Operating Rept for Dec 1985 ML20138M5941985-11-30030 November 1985 Monthly Operating Rept for Nov 1985 ML20138P4981985-11-30030 November 1985 Monthly Operating Rept for Nov 1985 ML20136E8811985-10-31031 October 1985 Monthly Operating Rept for Oct 1985 ML20133N6201985-09-30030 September 1985 Monthly Operating Rept for Sept 1985 ML20138J7921985-09-30030 September 1985 Monthly Operating Rept for Sept 1985 1998-03-31
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217H8501999-10-14014 October 1999 Safety Evaluation Supporting Amend 197 to License DPR-64 ML20206U2551999-02-0909 February 1999 Safety Evaluation Supporting Amend 187 to License DPR-64 ML20236Y1571998-08-0303 August 1998 Part 21 Rept Re ASTM A351,GR. CF8 Matl at Indian Point Being Out of Specifications in Molybdenum & Chromium.Cause & Corrective Actions Are Not Stated ML20236V4281998-07-13013 July 1998 Safety Evaluation of TRs WCAP-14333P & WCAP-14334NP, PRA of RPS & ESFAS Test Times & Completion Times. Repts Acceptable ML20236T5511998-06-24024 June 1998 Consolidated Edison Co of Ny,Indian Point Unit 2,Drill Scenario Number 1998C ML20248B2371998-03-31031 March 1998 Revised Monthly Operating Rept for March 1998 for Indian Point Station Unit 2 ML17264A9381997-07-10010 July 1997 Deficiency Rept Re Potential Safety Hazard Associated w/FM-Alco 251 Engin,High Pressure Fuel tube-catalog: 4401031-2 in Which Dual Failure Mode Exists.Caused by Incorrect Forming Process ML18153A1431997-06-10010 June 1997 Part 21 Rept Re Possible Machining Defect in Certain Stainless Steel Swagelok Tube Fitting Bodies.Facilities Have Been Notified About Possible Problem ML20210E3591997-03-27027 March 1997 Part 21 Rept Re Sorrento Electronics Inc Has Determined Operation & Maint Manual May Not Adequately Define Requirements for Performing Periodic Surveillance of SR Applications.Caused by Hardware Failures.Revised RM-23A ML1005008001997-02-28028 February 1997 Conditional Extension of Rod Misalignment TS for Indian Point 3. ML20115J3981996-07-22022 July 1996 Interim Part 21 Rept Re 3/4 Schedule 80 Pipe Furnished to Consolidated Power Supply.Investigation Revealed Only One Nuclear Customer Involved in Sale of Matl ML20096E5101995-12-31031 December 1995 Resubmitted Rev 13 to QA Program 05000286/LER-1994-010, :on 941007,concluded That at Least Two EDGs Inoperable During June 1992 Surveillance Test of Carbon Dioxide Fire Protection Sys.Caused by Inadequate Procedural Guidance.Surveillance Test Revised1994-11-0707 November 1994
- on 941007,concluded That at Least Two EDGs Inoperable During June 1992 Surveillance Test of Carbon Dioxide Fire Protection Sys.Caused by Inadequate Procedural Guidance.Surveillance Test Revised
ML17059A3611994-07-0606 July 1994 Emergency Action Level Verification & Validation Rept. ML17311A0181994-05-13013 May 1994 New York State EAL Upgrade Project Verification & Validation Rept. ML20029C7801994-03-31031 March 1994 Monthly Operating Rept for Mar 1994 for Indian Point Unit 1. W/940415 Ltr ML20056E5171993-08-31031 August 1993 Technical Review Rept, Tardy Licensee Actions ML20062J2281993-07-23023 July 1993 Consolidated Edison Co of Ny Indian Point Unit 2,Drill Scenario 1993 ML20044B8461993-03-0404 March 1993 Part 21 Rept Re Possible Safety Implications in Motor Operated Valve Evaluation Software Program Re Use of Total Thrust Multiplier.Utils Advised of Problem & Recommended Corrective Action in Encl Customer Bulletin 92-06 ML20118A2681992-12-31031 December 1992 Consolidated Edison Co of Ny Indian Point,Unit 2 Exercise Scenario,1992 ML20125C7161992-12-0707 December 1992 Part 21 Rept Re Possibility for Malfunction of Declutching Mechanisms in SMB/SB-000 & SMB/SB/SBD-00 Actuators. Malfunction Only Occurs During Seismic Event.Balanced Levers May Be Purchased from Vendor.List of Affected Utils Encl ML20127P5861992-11-23023 November 1992 Followup to 921005 Part 21 Rept Re Potential Defect in SB/SBD-1 Housing Cover Screws.Procedure Re Replacement of SBD-1 Spring Cover Bolts Encl.All Fasteners Should Be Loosened & Removed.List of Affected Utils Encl ML20096H2301992-05-21021 May 1992 Special Rept:On 920504,south Side Lower Electrical Tunnel Detection Sys 8 Taken Out of Svc for Mod to Reposition Detection Sys Run of Conduit.Detection Sys Declared Operable on 920520 After Mod Completed & Sys Retested ML20079F9181991-05-31031 May 1991 Structural Evaluation of Indian Point,Units 2 & 3 Pressurizer Surge Lines,Considering Effects of Thermal Stratification ML20059E9461990-08-31031 August 1990 Nonproprietary Rev 2 to Indian Point 2 Tube Fatigue Reevaluation ML20059G2011990-07-31031 July 1990 Final Rept on Steam Generator Insp, Repair & Restoration Efforts During 1990 Midcycle Insp ML20058K4121990-06-30030 June 1990 Status Rept,Indian Point Unit 2 Mid-Cycle Steam Generator Insp Presentation to Nrc ML20058K4151990-06-30030 June 1990 Steam Generator Insp,Repair & Restoration Program Presentation to Nrc ML20043A4891990-05-30030 May 1990 Nonproprietary Indian Point Unit 2 Steam Generator Insp, Repair & Restoration Program JPN-90-035, New York Power Authority Annual Rept for 19891989-12-31031 December 1989 New York Power Authority Annual Rept for 1989 ML19332B9371989-11-30030 November 1989 Nonproprietary Info Presented to NRC Re Indian Point Unit 2 Steam Generator Secondary Side Loose Objects. ML19332D6661989-10-31031 October 1989 Nonproprietary Rev 2 to Indian Point Unit 2 Steam Generator Girth Weld/Feedwater Nozzles Rept Spring,1989 Outage. ML20247J8161989-07-31031 July 1989 Safety Evaluation for UHS Temp Increase to 95 F at Indian Point Unit 3 05000286/LER-1989-013-01, :on 890702,contractor Security Guard Was Found Asleep at Duty Post.Caused by Cognitive Personnel Error. Contract Security Officer Involved in Event Was Dismissed. All Security Personnel Reapprised of Responsibilities1989-07-28028 July 1989
- on 890702,contractor Security Guard Was Found Asleep at Duty Post.Caused by Cognitive Personnel Error. Contract Security Officer Involved in Event Was Dismissed. All Security Personnel Reapprised of Responsibilities
ML20248D3631989-06-30030 June 1989 Rev 1,to Indian Point Unit 3 Reactor Vessel Fluence & Ref Temp PTS Evaluations ML20248B3171989-06-30030 June 1989 Rev 1 to Nonproprietary WCAP-12294, Indian Point Unit 2 Steam Generator Girth Weld/Feedwater Nozzles Rept,Spring 1989 Outage ML20247N5331989-05-31031 May 1989 Nonproprietary Indian Point Unit 2 Steam Generator Girth Weld/Feedwater Nozzles Rept Spring,1989 Outage ML20247J8071989-05-31031 May 1989 Containment Margin Improvement Analysis for Indian Point Unit 3 ML20247G5171989-04-30030 April 1989 Monthly Maint Category I Rept Pages from Monthly Operating Rept for Apr 1989 for Indian Point 05000286/LER-1989-007, :on 890321,unauthorized Access Into Protected Area by Former Employee Utilizing Photo Identification Badge of Another Contract Employee Occurred.Caused by Security Guard Error.Security Retrained1989-04-17017 April 1989
- on 890321,unauthorized Access Into Protected Area by Former Employee Utilizing Photo Identification Badge of Another Contract Employee Occurred.Caused by Security Guard Error.Security Retrained
ML20244C3311989-04-10010 April 1989 Safety Evaluation Supporting Amend 137 to License DPR-26 ML20248F4211989-03-31031 March 1989 NSSS Stretch Rating-3,083.4 Mwt Licensing Rept 05000286/LER-1989-001, :on 890204,initiated Safety Injection Via High Steam Flow Safety Injection Logic.Caused by Uneven Refilling of Steam Flow Instrumentation Lines.Safety Injecton Terminated & Plant Cooldown Proceeded1989-03-0303 March 1989
- on 890204,initiated Safety Injection Via High Steam Flow Safety Injection Logic.Caused by Uneven Refilling of Steam Flow Instrumentation Lines.Safety Injecton Terminated & Plant Cooldown Proceeded
ML20235V5931989-03-0202 March 1989 Special Rept:During Cycle 6/7 Refueling Outage Scheduled from Feb-May 1989,openings Will Be Made in Plant Penetration Fire Barriers in Order to Install Various Mods. Fire Watches Posted & Fire Detection Tests Completed 05000286/LER-1989-003-01, :on 890205,security Gate Found Unlocked.Caused by Cognitive Personnel Error.Upgrade of Security Procedure 4, Compensatory Measures to Clearly Define Methods of Establishing,Maintaining & Closing Posts Performed1989-02-23023 February 1989
- on 890205,security Gate Found Unlocked.Caused by Cognitive Personnel Error.Upgrade of Security Procedure 4, Compensatory Measures to Clearly Define Methods of Establishing,Maintaining & Closing Posts Performed
ML20248F3001988-12-31031 December 1988 10CFR50.59(b) Rept of Changes,Tests & Experiments Completed in 1988 ML20246E2711988-12-31031 December 1988 Con Edison 1988 Annual Rept ML20196D3011988-10-31031 October 1988 Reactor Vessel Matl Surveillance Program for Indian Point Unit 2 Analysis of Capsule V ML20155H2541988-09-30030 September 1988 Rev 2 to Indian Point Unit 2 (NRC Bulletin 88-008 Thermal Stresses in Piping Connected to RCS) Indentification of Unisolable Piping & Determination of Insp Locations ML20154M5661988-08-31031 August 1988 Monthly Operating Rept for Aug 1988 for Indian Point Station Unit 2 1999-02-09
[Table view] |
Text
.-
~~
OPERATING DATA REPORT Docket No.
50-286-Date 04-01-87 Completed By L. Kelly Telephone 914-736-8340 OPERATING STATUS 1..
Unit Name:
Indian, Point No. 3 Nuclear Power Plant Notes 2.
Rsporting Period:
March 1987
.3.
Licensed Thermal Power.(MWt):
3025 4.
Nsmeplate Rating (Gross MWe):
1013
.5..
Dasign Electrical Rating (Net MWe):
-965 t
6.
M:ximum Dependable Capacity (Gross MWe): 965 7.' 'M:ximum Dependable Capacity (Net MWe):
930 8.
If Changes Occur in Capacity Ratings (Items Number 3 through 7) Since Last Report.
'Give Reasons:
9.
Power Level to Which Restricted, If Any (Net MWe): 930 Net MWe-
- 10. Reasons for Restrictions, If Any:
- 33 Low Pressure Turbine was modified by replacing two rows of blades with baffle assemblies.
1 This Month Yr. to Date Cumulative i
11.
Hours In Reporting Period 744 2,160 92,785 I?, Number of Hours Reactor Was Critical 643.35 1,983.10 55,832.26 13.-
Reactor Reserve Shutdown Hours 0
0 0
14.
Hours Generator On-Line 642.80 1,968.68 54,030.21**-
- 15. Unit Reserve Shutdown Hours 0
0 0
- 16. Gross Thermal Energy Generated (MWH) 1,930,676.778 5,828,653 144,361,514 17.
Gross Electrical Energy Generated (MWH) 615,210 1,858,940 45,163,555 18.
Net Electrical Generated (MWH) 593,376 1,792,283 43,332,563
- 19. Unit Service Factor 86.4 91.1 58.2 20.
Unit Availability Factor 86.4 91.1 58.2 21.
Unit Capacity Factor (Using MDC Net) 85.8 89.2 50.39*
l 22.
Unit Capacity Factor (Using DER Net) 82.6 86.0 48.4 23.
Unit Forced Outage Rate 0
4.4 19.4 24.
Shutdowns Scheduled Over Next 6 Months (Type,Date,and Duration of Each):
- Includes Four (4) hr. corrections July 86 l
Cycle 5/6 Refueling Outage starting 5/1/87 25.
If Shut Down at End of Report Period. Estimated Date of Startup:
26.
Units In Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITIC /J.ITY INITIAL FLECTR1JITY COMMERCIAL OPERATION 87042202]BD 0 86 PDR AD PDR
- I: EI51kf e//
-r
~. -
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-286 UNIT-IP-3 DATE 04-01-87 COMPLETED BY L. Kelly TELEPHONE (914) 736-8340 MONTH March 1987 DAY AVERAGE. DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1 929 17 925 2
932 18 928 3
930 19 926 4
930 20 927 5
930 21 928 6
928 22 926 7
929 23 926 8'
928 24 934 9
931 25 923 10 931 26 919 11 931 27 606 12 930 28 0
13 927 29 0
14 928 30 0
15 927 31 0
16 927 INSTRUCTIONS:
On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
-_ 7 _ _ _ _ _ _.._ _ _ _ ___ _ _.__ _ ___
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-286 UNIT NAME Indien Paint 3 DATE- 04-01-87 REPORT MONTH tt%RCH 1987 TELEPHONE 914-736-8340 I
l l
~
I Et un a0e E
oUE Licensee a
Ee Cause & Corrective
=
l
[
e$
I
.E Event
al jiE Report i O
Prevent Recurrence 11o.
Date 03 870327 S
101.20 B
1 NA CB Pumpxx B The unit was taken off the line in a controlled shutdown in order to replace No. 33 Reactor Coolant Pump Sea:
i Package which had been exhibiting j
increases in s'eal return flow.
4 i
4 i
1 l
)
1 i
1 2
3 4
)
F: Forced Reason:
Method:
Exhibit F - Instructions S Be h led A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance of Test 2-Manual Scram Entry Sheets for Licensee
- l C-Refueling 3-Automatic Scram Event Report (LER) File (NUREG D-Ragulatory Restriction 4-Other (Explain) 0161)
E-Operator Training & License Examination i
F-Administrative i
G-Operational Error (Explain) 5 j
H-Other (Explain)
Exhibit H - Same Source 1
y MONTHLY MAINTENANCE CATEGORY I REPORT March 1987 MONTH WR#
DATE EQUIPMENT-MALFUNCTION CORRECTIVE ACTION
- 9151 03/02/87 Fuel Storage Building.
Lower louver motor on' air Replaced lower louver motor Ventilation System.
tempering unit fan #31 on air tempering inoperable unit fan #31 9843 03/02/87 Fuel Storage Building Lower louver motor on F.S.B.
Replaced' lower' louver motor Ventilation System air tempering unit fan #32 on air tempering inoperable unit fan #32 9282 03/06/87
- 36 Service Water Pump Motor Oil leak at flange-Replaced pump motor 9028 03/09/87 Radiation Monitoring System, Faulty limit switch Replaced limit switch Fuel Storage Building Monitor, R-5 9618 03/11/87
- 31 Emergency Diesel Service water leak on outlet Cleaned and sealed Generator expansion joint of heat during scheduled preventive exchanger maintenance / inspection:
7393 03/12/87
- 32 Emergency Diesel Air regulator leaks by Replaced regulator Generator during scheduled preventive maintenance / inspection 9916 03/13/87 Fuel Storage Building Worn bearings Replaced bearings Exhaust Fan 10050 03/13/87
- 32 Emergency Diesel Immersion jacket water heaters, Replaced heaters during Generator leak scheduled preventive maintenance / inspection 10054 03/13/87
- 31 Emergency Diesel Cylinder.#4R indicator cock Replaced indicator cock during Generator
'does not operate correctly scheduled preventive maintenance / inspection O
9
MONTHLY I'&'C CATEGORY I REPORT March 1987
. MONTH WRf DATE EQUIPMENT MALFUNCTION CORRECTIVE ACTION I
6616 03/09/87 Radiation Monitoring System, Faulty connection on CPU board Repaired connection Wide Range Noble Gas Monitor, R-27.
6761 03/11/87 Radiation Monitoring System. Bad power supply card Replaced power supply; card Component Cooling Liquid Monitor, R-17B 6757 03/13/87 Reactor Coolant System.
Temperature recorder TR-413 Recalibrated' temperature Loop 1 Cold Leg Wide out of calibration recorder, TR-413 Range Temperature Element, TE-413B 6758 03/16/87 Radiation Monitoring System, Local alarm does not sound Replaced buzzer.
Condenser Air Ejector Gas Monitor, R-15' 6788 03/19/87
- 31 Emergency Diesel Service water outlet temperature Replaced gauge Generator gauge broken 6544 03/23/87 H Analyzer "A". Train Flow indicator inoperable Replaced flow indicator 7
FIow Indicator 6766 03/24/87 Control Rod Position Indicator sticks' Replaced indicator Indication, Step Indicator, B-10 O
4 9
I 9
smi
MONTHLY MAINTENANCE CATEGORY I REPORT March-
'1987-MONTH' WR#
DATE EQUIPMENT MALFUNCTION CORRECTIVE ACTION 9914 03/17/87
- 33 Emergency Diesel Pre-lube oil pump shaft seal Replaced pump during.
Generator leaks scheduled preventive maintenance / inspection 10140 03/31/87 Primary Sampling Valve 950 Packing leak Repacked. valve.
10141 03/31/87
- 32 Reactor Coolant Pump Packing leak Repacked valve
- 1 Seal By-pass Drain Valve - CH-144 1
~
i 1
9 9
e 9
oi L J'i
.o_
1 s
SUMMARY
OF OPERATING EXPERIENCE
't MARCH 1987 t
c Indian Point' Unit'#3 was synchronized to the bus for a total of.642.80 hours9.259259e-4 days <br />0.0222 hours <br />1.322751e-4 weeks <br />3.044e-5 months <br />,
? producing a; gross generation of 615,210 MWe for this reporting period.
Early.in March small temporary flow transients were observed on No. 33 Reactor:
Coolant Pump (RCP).No. 33. On March 16th, the seal return flow on RCP No. 33 started to increase. RCP seal return flows were trended and thermal barrier delta,P and seal outlet temperatures were closely monitored. Based on RCP No.
33 seal return flow trends, a decision was made to conduct an RCP seal' maintenance outage.
On March 27th at 1848 hours0.0214 days <br />0.513 hours <br />0.00306 weeks <br />7.03164e-4 months <br />'the Unit was taken off line in a controlled shutdown.
.in order to repair No. 33 Reactor Coolant Pump Seal _ Package.- The' Unit proceeded.
to a cold shutdown condition in order for Maintenance crews to disassemble the-pump and replace the pump seal package. A decision was made to also replace No.
32 RCP Seal Package during this maintenance outage as a preventive maintenance
' effort. _ Equipment locations and maintenance logistics'would allow for the additional activities on No. 32 RCP without. impacting the RCP Seal Outage Schedule.
The Unit remained shutdown'for the remainder of the reporting period.
Indian Point 3 Nuclear Power Plant e
P.O. Bo:t 215 Buchanan, New Wrk 10511 4
914 739.8200
- > NewWrkPbwer 4sf Authority April 10, 1987 IP3-WAJ-183Z IP3-LMK-0102H Docket No.
50-286 License No. DPR-64 Director, Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, D.C.
20555
Dear Sir:
Enclosed you will find the monthly operating report relating to Indian Poi 3 Nuclear Power Plant for the month of March, 1987.
[!
/Very ly
- urs, aju Wi iam A. Josiger Resident Manager Indian Point 3 nuclear Power Plant LK/sn:3:09 Enclosure cc:
U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C.
20555 Dr. Thomas E. Murley, Regional Administrator Region 1 U.S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, Pennsylvania 19406 INP0 Records Center Suite 1500 1100 Circle 75 Parkway Atlanta, Georgia 30339 QNi i
i
_ _ _ _ _ _ _ _ _ - _