ML20136E881

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Oct 1985
ML20136E881
Person / Time
Site: Indian Point Entergy icon.png
Issue date: 10/31/1985
From: Josiger W, Kelly L
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
To:
NRC OFFICE OF ADMINISTRATION (ADM), NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
References
IP-LK-2851, NUDOCS 8511210601
Download: ML20136E881 (7)


Text

~

j f

! OPERATING DATA REPORT DOCKET NO. 50-236 DATE 11-1-Hs t- v o i h, COMPLETED 8Y TELEPHONE Sio 7 M-8200 OPERATING STATUS Indian Point No. 3 Nuclear Power Plant bOI" i

I. Unit Name:

Oct bor as

2. Reporting Period:

3025

3. Licensed ThermalPoweriMht):
4. Nameplate Rating (Gross MWe):

1013

5. Desion Electrical RatmgiNet MWe1:

965 1000

6. Maximum Dependable Capacity (Gross MWe):

965

7. Maximum Dependable Capacity (Net MWe):

S. If Changes Occur in Capacity Ratingt titems Number 3 Through 7) Since Last Report. Give Reasons:

9. Power Level To Which Restricted. lf Any (Net MWep:
10. Reasons For Restrictions,if Any:

l This Month Yr..to Date Cumulathe 745 7,296 80,401

11. Hours in Reporting Period 45,309,33 715.3 4,443,4
12. Number 0f Houn Reactor has Critical n o o
13. Reactor Reserve Shutdown Houn 4,345.87 44 ,19 3. n l 640.Hn i 14. Hours Generator on.Line 0 o 0
15. Unit Reserve Shutdown Hours 11n,72n,64T 70'i,oln.27 11,n21,700
16. Gru Thermal Energy Generated iMWH) 266, m 1,sas,1so 16,227,69s
19. Crr.,s Electrical Energy Generated lMWH) ja ,7 24, n 13 20s,n21 3,41a,697
18. Net Electrical Energy Generated (MWHi n6.0 59.6 ss.o
19. Unit Service Factor ,;<; , o
20. Unit Availability Factor 96.0 59.6 _

29.o 4n.n 4 6, n e; *

.l. Unit Capacity Factor (Using MDC Net) 29.0 48.9 44.n

22. Unit Capacity Factor IUsing DER Neti 20.2
23. Unit Forced Outage Rate 2.1 2.3
24. Shutdowns Scheduled Over Nest 6 Months iType. Date,and Duration of Eacht: . Woighted Averaqo Jun Gonorntnr innrncr inn Ournqn one. Anrtl 1906 25 If Shut Down At End Of Report Pesiod Estimated Date of Startup:

26 Units in Test Statusirrior to Commercial Operationi: Forecast Achieved INITIA L CRITICALITY INITIAL ELECTRICITY COMMERCI AL OPERATION 951'1210601 051031 )\

PDR ADOCK 05000286 1

_ _ R___ __

ppg _ - _ _ - _ _ _ _ _ ,

AVERAGE D ALLY UNIT POhER LEVEL I DOCKET NO. 50-286 Indian Point L3lT No- 3 l

!! v. 1, 1985 D ATE l

COMPLETED BY ' rollv TELEPHONE (914) 739-8200 MONTM october 1985 DAY AVERAGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL IMWe Neo IMWe.Neti 1

0 37 20n 2 o 13 2no 3 0 l9 200 4 0 20 209 165 ene, 5 21 6 170 22 301 7 inn 23 427 g 199 34 435 9 201 23 437 10 202 26 412 ll 205 37 437 l2 207 23 464 l3 207 29 706 l4 206 30 073 13 121 3l 671 16 180 INSTRUCTIONS On this format. list the average daily unit power leselin MWe Net for each day in ths reporting inonth. Compute to the nearest whole megawatt.

(01771 1

L_________________________________________ _ _ . _ _ _ _ _ _ _ _ _ _ __

. _ _ _ - -. . ~ - . _ - . - .-_ . _ - _ . _ _ __ __ _.--_~. . - _ . . . - ~ _ - _ . - . _ ~ - --

l i

ilNII S800110WNS /.ND POWER REEMM'HONS # W E-IINII NAML r ofi ,n mine ui 3 94g g 1 NOV 85 t H6ert1TLD IsY L. Kel1y j R EPOftI b80 N IM N MR I El.LPl40NI.
  • 8 I 'I-'l 19-82048 r

$3 'h hE 1kesence E, *l, Cauw & Cenicaeve

(

to. Dese g 3g jg& t.cne gy g'y At s .. s o H 5 U l'.siiws e 1

fE 2 ;p, :f

= vi u u

o hrsen Rc.uesence

6 4

s f

06 850608 S 88.78 C 2 N/A ZZ ZZZZZZ Unit in a scheduled cycle IV - V refueling outage.

l 07 851004 F 5.19 A 3 85-006-00 CH VALVEI F Hi Hi level #33 Steam Generator due tci I

feedwater transient and a sluggish feedwater regulating valve.

08 851015 F 10.15 A 3 85-007-00 HA ZZZZZZ Turbine autostop oil system initiated a unit trip due to foreign matter in the main turbine high pressure (HP)

) oil system.

i i 1 3 4 F: Fiw a d Reasun: becelu=1. I slohis r-In useusi...s S: Salmeiluled A Faguapanens faeliese tt.mplaan) I blaussal I.. l' cpaease... ..s Dana i

18 Maaseennonce or Test 2 Manual Sesaen. I nii> .%uss 6.= 16 cnwe C-Refueleng _l- Ainsammatec Scsana. I scus Rc3w.s e ti I R t I sic INilRI G.

D itegulas.wy itesse Aseine 4 Delics ( E aptami) tiltil n j i Opcias..e Teassiosag A LAenw laanenacensi

  • F-AJasse.asseasive i G Opesassoonal Essew IF mgdesa) I statin 11 - Lnic %=n.c t'8/77) II Oslees(I:mi dania)

MONTHLY MAINTENANCE CATECORY I REPORT OCTOBER 1985 MONTH WRf DATE EQUIPMENT MALFUNCTION CORRECTIVE ACTION 6570 10/4/85 Steam Cenerator Blow Down, Body to bonnet leak. Injected sealant.  ;

Valve 1217 7231 10/7/85 Service Water, Pump 31, Motor had high vibrations. Replaced motor.

Motor 7263, 10/9/85 Weld Channel Penetration Coil had open circuit. Replaced coil.

Pressurization System, Valve SOV-1538 7103 10/18/85 Boric Acid Heat Trace, Open circuit at terminal block. Repaired broken termination Circuit #40. at terminal block.

7019 10/21/85 Radiation Monitor RE-46 Drive belt assembly broken. Repair drive shaft and pulley.

6956 10/22/85 Purge Supply and Exhaust Lamp Socket was broken. Replaced lamp socket.

Fan, CCR Indication 7337 10/29/85 Charging Line Pressure Weld leak at sensing Replaced piping.

l Transmitter, PT-142 line taps.

l l

1 I

l I

e 9

MONTHLY I & C CATECORY I REPORT October 1985 MONTH v

4 ~-

WRf DATE EQUIPMENT MALFUNCTION CORRECTIVE ACTION 4636 9/26/85 Reactor Protection System, Could not properly adjust Replaced coil and adjusted

. Reactor Trip Bypass Breaker trip setpoint.' trip setpoint.

BYE

.c.

~ '

4662 10/7/85 ,#34, Steam Generator, Faulty deviation bistable. Replaced bistable.

,, Level Controller LC-447 I/J.

4663 10/9/85 Hydrogen Recombiner 31 Low output when in. automatic. Cleaned port on pneumatic Temperature Recorder - -

relay. f_

4638 10/9/85 RodControl,PowerCabine$ Blown power fuse. Replacedfude.

2AC 4661 10/11/85 #32 Steam Generator, Recorder spiking during Calibrated I/I converter Level Recorder, LR-427B starr,-up. .and replaced LM-427F.

4692 10/17/85 Pressuri er Pressure, Indicator spiking high. - Replaced' power supply, Channel II - alarm box, and I/I converter.

4-4 A

4 r

SUMMARY

OF OPERATING EXPERIENCE OCTOBER 1985 On October 4 at 1647 hours0.0191 days <br />0.458 hours <br />0.00272 weeks <br />6.266835e-4 months <br /> Indian Point Unit 3 was returned to service after a 118 day Refueling and Maintenance Outage.

On October 4 at 1812 hours0.021 days <br />0.503 hours <br />0.003 weeks <br />6.89466e-4 months <br /> a unit trip occurred due to a feedwater transient causing a Hi-Hi Steam Generator level in #33 Steam Generator. It was determined that #33 feedwater regulating valve responded sluggishly to its control input signals. Subsequent investigation of No. 33 feedwater regulator revealed that positioner linkage assembly had overspanned its full travel lie t. The positioner assembly was replaced, the other linkage assemblies were inspected, and all four feedwater regulating valves were cycled to verify operability. The unit was returned to service at 2323 hours0.0269 days <br />0.645 hours <br />0.00384 weeks <br />8.839015e-4 months <br />.

On October 15 at 1516 hours0.0175 days <br />0.421 hours <br />0.00251 weeks <br />5.76838e-4 months <br /> a unit trip occurred due to a Turbine Control Oil Autostop Trip. The cause of the trip was determined to be foreign matter in the main turbine high pressure oil system, which blocked orifices in the multiple orifice and check valve assemblies.

The oil strainers and other system components were inspected cleaned and flushed. The reactor was brought critical at 1855 hours0.0215 days <br />0.515 hours <br />0.00307 weeks <br />7.058275e-4 months <br />. At 0125 hours0.00145 days <br />0.0347 hours <br />2.066799e-4 weeks <br />4.75625e-5 months <br /> on October 16 the main generator was synchronized to the grid and subsequently the plant was returned to pre-trip conditions.

Indian Point Unit #3 was synchronized to the bus for a total of 640.88 hours0.00102 days <br />0.0244 hours <br />1.455026e-4 weeks <br />3.3484e-5 months <br /> producing a gross generation of 226,970 MWH for this reporting period.

' 6 Indian Ibint 3

' Nuclear Ibwer Plant P.O. Box 215 Buchanan, New Wrk 10511 914 739.8200

  1. D NewYorkPbwer rae":.fff;,-

4# Authonty November 15, 1985 IP-LK-2851 Docket No. 50-286 License No. DPR-64 Director, Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Attention: Document Control Desk

Dear Sir:

\

Enclosed you will find twelve copies of the Monthly Operating Report relating to Indian Point 3 Nuclear Power Plant for the month of October, 1985.

. Very truly yours, 1 -

MJG - n Wil A Jos ger sident an er

/

LK/jmd Epelo res (12 Copies) cc: Dr. Thomas E. Murley, Regional Administrator Region 1 U. S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, Pennsylvania 19406 IP3 Resident Inspectors' Office George Wilverding (SRC), WP0 J. P. Bayne, WP0 J. C. Brons, WPO S. V. Fuller, NYO W. R. Yario, NYO

, INP0 Records Center Suite 1500 1100 Circle 75 Parkway Atlanta, Georgia 30339 yb

' 1 i

I