OPERATING DATA REPORT DOCKET NO.

50 247 DATE 9/9/88 COMPLETED BY _ L Kriener TELEPHONE uT14) un-3155 OPERATING STATUS Indian Point Station Notes

)

l

1. Ud h 8"8"'" I'88
2. Reporting Paiod:
3. Licensed Thermal Power (MWt):

2758 i

1013

4. Nameplete Rating (Grom MWe):

873

5. Desien Electrket Rating (Net MWe):

885

6. Manimum Dependable capacity (Grom MWe):

l

7. Maalmun. Dependable Capacity (Net MWe):

848

8. If Changes;,)ccur,in Capacity Ratings (items Number 3 Through 7) Since Last Report. Give Renons:
9. Power Level To Which Rntricted. lf Any (Net MWe):

j

10. Reasons For Restrictions.lf Any:

i

[

This Month Yr. to Date Cumulative

11. Hows in Reporting Period 744 5855 124224
12. Number Of Hours Reactor Was Critical 744 4176.76 85335.93
13. Reector Reserve Shutdown Hours 0

0

14. Hows Genwetor On-Line 144 458.69 8M26.37
15. Unit Rewrve Shutdown Hours 0

0 0

16. Grom Themal Energy Generated (MWH) 2004425 3103925 224621204
17. Groes Electrical Energy Generated (MWH) 625704 3916064 67530642
18. Net Electrical Energy Genneted (MWH) 601258 375482s v4491743
19. Unit Sonice Fue.,

100 77.4 64.8

20. Unit A$ailability Futo, 100 17.4 66.8
21. Unit Capacity Futer (Using MDC Net) 95.2 14.9 60.5 I

j

22. Unit Capacity Fxtor (Uhg DER Nes) 92.6 73.5 59.5
23. Unit Forced Outage Rate 0

9.7 8.7

24. Sh,sdowns Scheduled Oser Nest 6 Months (Type.Dete. sad Duration of Eacht:

l l

25. If Shut Dumn At End Of Report Period. Estimated Date of Startup:
26. Units in Tnt Status (Prior Io Comnwecial Operetion):

Forecad AchiewJ r

I INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY M/A N/A COMMERCI AL OPER ATION N/A N/A 2 wp9 880915 R

M Q 0500o247 (W778 PNt)

AVERAGE DAILY UNIT POWER LEVEL.

DOCKET NO.

50:247 IP Unit #2 WIT DATE e m as COMPLETED BY K+ Kri'#'r (914) 526 5155 TELEPHONE i

gog August 1984 i

DAY AVERAGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL (MWe Net)

(MWe-Net) 3 34 823 gy 8#

8M 2

13 3

>=

i, 4

500' 20 8 39 s

m si 420 83I 6

22 7

als 23 440 m

=

2.

i 8

2s too l

830 26 839 11 830 646 37 833 l

12 28 13 827 835 14 829 33g 3,

I8 31 als 16 a2e INSTRUCDONS On this format, hat the antage daily unit power toelin howe. Net for each day in the reporting uwmth. Compute io the nearest whole megawati,

~'

(997) e

l' l\\

l i

1

'3 DOCKET NO. =_50-247 UNIT SifUTDOWNS AND POWER REDUCTIONS l

UNIT NAME iP Unit #2 DATE _Sigram COMrt.ETED 3Y K. Krteger i

REPORT MONTH August 1968 TE'.EPHONE (914) 526-5155 r

IE 3

E~

IAenset P.,

k Cause & Corrective Dair

(

~2 2

255 Event g?

3 Action to g5,0 5

3e gg Report e in O hU Present Recurrence

  • ~

u c5

[

}

R/A 880803 F

D N/A 88-10 N/A N/A Reduced load due to Tech Spec Nigh River Water talet Temperature.

f i>

4 t.

?

1 3

4 F. Fewted Reason:

Method:

Exhibit G - tastructiora 5: Scheduled A-Equipment Failure (Emptain)

I-Manual fu Preparative of Data 6

B-Maintenance of Tes:

24(anaal Scram.

Entry Sheets for Litmee C.Rcfacting 3-Automatic Scram.

Event Report (LER) F4e (NUREG-D-Regulatory Restriction 40ther(Explaial 0161)

EOperator Training & License Examination F-Adersaistrative 5

Goperational Errur (Eaptain)

Edubri I-Same Soura r8/77)

Ilother (Emplam) 4 3

Summary of Operatina Esperience i

Aunust 1984 i

i The unit was asintained at 1001 reactor power for the anth of August, j

except for the following reductions in power.

)

i On August 3, power was reduced to 732 when the esasured inlet temperature l

to the service water escoeded the limit of 85 degrees specified in the unit Technical Specifications.

power was further reduced to 651 on August 4 due to continued high river water temperatures.

On August 5, af ter NRC waiver was received to operate at 87'F Technical Specification limit on river water temperature, power ascensica to 1002 commenced.

1001 power was achieved on August 6 at 0200.