OPERATING DATA REPORT DOCKET NO. 50-247 DATE 1 5-87 CONIPLETED IlY K.Krieger TELEPfl0NE f 9141526--5155 OPERATING STATUS Indian Point Unit No. 2 Notes

1. Unit Name:
2. Reporting Period: December 1986
3. Licenwd Thennal Power (AlWt): 2758
4. Nameplate Rating (Gross MWe): 1013
5. Design Electrical Rating (Net MWe): 873
6. Maximum Dependable Capacity (Gross MWe): 900
7. Maximum Dependable Capacity (Net MWe): 864
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:

~

9. Power Lesel To Which Restricted,lf Any (Net MWe):
10. Reasons For Restrictions,if Any:

This Month Yr.-to-Date Cumulatise

11. Ilours in Reporting Period 744 8760 109609
12. Number Of Hours Reactor Was Critical 744 5102.04 74271.90
13. Reactor Reserve Shutdown llours 0 290.70 3689.07
14. Ilours Generator On-Line 744 4927.01 72063.69
15. Unit Resene Shutdown flours 0 0 0
16. Grow Thermal Energy Generated (MWil) 1917543 12891279 187717576 17 Gross Electrical Energy Generated (MWil) 6002_90_ , _ ,

4007290 58256766

15. Net Electrical Energy Generated (MWil) 578261 3811596 55590582
19. Unit Service Factor 100 56.2 65.7
20. Unit Asailability Factor 100 56.2 65.7
21. Unit Capacity Factor IUsing MDC Net) 90.0 50.8 59.1
22. Unit Capacity Factor (Using DER Net) 89.0 49.8 58.1
23. Unit Forced Outage Rate 0 11.9 9.2
24. Shutdowns Scheduled Oser Next 6 Months (Type. Date,and Duration of Each):

Generator inspection, February 1987, approximately one week.

25. If Shut Down At End Of Report Period Estimated Date of Startup: -
26. Units In rest Status t Prior to Commercial Operation): Forecast Achiesed INIII A L CRITICALITY N/A INITIA L ELECTRICITY CO\l\lERCIA L OPER ATION 8703160313 861231 PDR ADOCK 05000247 g g ,, /'

R PDR

\D

< AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

50-247 UNIT .TP Unit'No.2 1

DATE l-5-87 COMPLETED BY K. Krieger IELEPHONE (914) 526-5155 MONTH DAY AVER AGE DAll P 'ER LEVEL DAY AVERAGE AILY POWER LEVEL

y 781 289 17 3 789 570 18 780 843

! 3 l 4 787 041 20 841 5

21 788 852 6

786 850 7 23 g

781 845 777 848 9

10 780 847 26 11 791 845 27 12 803 832 28 13 799 , 837 la 793 821 3g 15 781 . 823 3

16 514 INSTRUCTIONS On this format. list the average daily unit power levelin MWe Net for each day in the reporting ino::th. Compute to j the nearest whole megawatt.

01/771 I

l Y

DOCKET NO. 50-247 UNIT SHUTDOhNS AND POWER REDUCTIONS UNI T NAME IP Unit #2 DATE l-5-87 COMPLETED BY K 3 1eger REPORI MONTil December 1986 (914)S26-5155-TELEPHONE

. ~k -

L. Date g

3?

3g 3 ) s')

,g g 5 Licensee Even' 5-r, h4 E ~'

Cause & Corrective 4 y? Action to H uTC L fE E j 5, g Report : Present Recurrence 6

~

N/A 12-16-86 F 0 A 4 RB CRDRVE During Control Rod Exercise Test, Rod M-12 dropped while moving shut--

down bank "A". See attached sununary of operating experience. Rx. remained critical.

N/A 12-17-86 F 0 H 4 RC E"JELXX Xenon oscilation due to dropped rod M-12. Rx. remained critical.

I 2 3 4 E: Forced Reason: Method: Exhibit G - Instructions S: Ssheduled A-Equipment Failure (Explain) 1 Manual for Preparation of Data B4taintenar.ce of Test 2-Man ual Scram. Entry Sheets for Licensee C-Refueling 3 Autonutic Scram. Esent Report (LERI File (NURI G.

D-Regulatory Restriction 4-Other ( Explain) 0161)

E-Operator Training & License Examinatiim F-Adnunistratise 5 G4)perational Error (Esplain ) Exhibit I- Same Source t9/77) Il4)ther iExplain)

I i

o ,

MAJOR SAFETY RELATED CORRECTIVE MAINTENANCE MWO SYSTEM COMPONENT DATE COMPLETED WORK PERFORMED 24894 SIS 22 SIS Pump 10/28/86 Cleaned Cooler 27719 EDG 22 EDL 11/4/86 Cleaned Cooler Rep 1. Crank Case 21222 ELEC 23 SW Pump 11/11/86 Cover Gasket 22418 CRD 21 CRD Cooling 11/11/86 Installed New Fan Mtr Motor

! 22419 CRD 22 CRD Cooling 11/11/86 Installed New Fan Mtr Motor 22420 CRD 23 CRD Cooling 11/11/86 Installed New Fan titr Motor 22421 CRD 24 CRD Cooling 11/11/86 Installed New Fan Mtr Motor 21215 CVCS 22 BAT Pump 11/11/86 Repaired Seal 20577 CRD CR.G5 11/11/86 Repaired Rpl.

Amphonal llRietp 19.251.1.12.1 1

i

r fundeBl_QE_QEEB61LMG.E!EEBIENGE 9tstehrt 1296 in general, Unit 2 operated between 93 percent and 100 percent power throughout the sonth of December with load being adjusted as necessary to limit generator end turn vibration.

Centrol rod M-12 dropped during rod exercise testing on Decemb$r leth due to a faulty electrical connector on the control rod drive cochanise. The connector was adjusted and the control rod withdrawn and .

cade operable in seven hours. Due to the resulting xenon induced radial fluu tilt, reactor power was reduced to less than 50 percent in accordance with the requirements of the Technical Specifications. This restriction was lifted on December 18th permitting a return to full pgwer operation.

Murrey Selman Consohdated Edison Corrpany of New York, Inc.

Indian Poent Station Broadway & Bleakley Avenue Buchanan. NY 10511 Telephone (914 737-8116 January 15, 1987 Rot Indian Point Unit No. 2 Docket No. 50-247 Director, Of fice of Management and Program Analysis U.S. Nuclear Roguintory Commission Washington, D.C. 20555 Encioned are twolvo copion of the Monthly Operating Report for Indian Point Unit No. 2 for the month of December 1986.

Very truly yours, i t. ts (

Encl.

10.251.0.13.1 cc Dr. Thonan E. Murley Regional Adminintrator - Ecgion I U.S. Nuclear Pogulatory Comminnion 631 Park Avenuo King of Prunnia, PA 19406 Senior Penident Innpoctor U.S. Nuclear Pequintory Comninnion P.O. Itox 30 Huchanan, NY 10511

.g 6 ). ,

I I

. - _ _ _ _ _ _ _ - _ _ _ _ _ _ . _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ - _ - _ - - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _______ - __