Monthly Operating Rept for Sept 1985
ML20138J792
Person / Time
Site: Indian Point Entergy icon.png
Issue date: 09/30/1985
From: Josiger W, Kelly L
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
To:
NRC OFFICE OF ADMINISTRATION (ADM), NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
References
IP-LK-2564, NUDOCS 8510290476
Download: ML20138J792 (10)


Text

._. _. _ _.. _ _ _ _ _ _ _ _

I l

OPERATING DATA REPORT

! DOCKET NO. 50-286 DATE 10-1-85 COMPLETED BY ' vall'-

, TELEPHONE '910 739-8200 OPERATING STATUS Notes

1. Unit Name:

Indian Point No. 3 Nuclear Power Plant September

2. Reporting Period:

3 3025 l 3. Licensed Thermal Power (MWt):

1013 1 4. Narneplate Rating (Gross MWe):

965

5. Design ElectricalRating(Net MWe):

7 1000 j 6. Maximum Dependable Capacity (Gross MWe):

965

7. Maximurn Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratingt (items Number 3 Through 7) Since Last Report. Give Reasons:

4 I 9. Power Level To which Restricted,if Any (Net MWe):

10. Reasons For Restrictions.If Any:

1 This Month Yr..to.Date Cumulative

720 6551 79.656 it. Hours in Reporting Period 3728.10 45,094.33 0
12. Number Of Hours Reactor Was Critical 0 o 0
13. Reactor Reserve Shutdown Hours 0 3704.99 43,552.93
14. Hours Generator On.Lin, 0 o i 0 l 15. Unit Reserve Shutdown Hours 0 10,235,662 115,940,609
16. Gross Thermal Energv Generated (MWH) 36.000.72s l O L 158.410
17. Gross Electrical Energy Generated (MWH) 3,229,876 34,515,992 l 0
18. Net Electrical Energy Generated (MWH1 56.6 54.7 0

', 19. Unit Service Factor 0 56.6 54.7

' 20. Unit Availability Factor 0 51.1 47.02 *

', 21. Unit Capacity Factor (Using MDC Net) 0 51.1 44.9

22. Unit Capacity Factor (Using DER Net) 0 2.3 20.4
23. Unit Forced Outage Rate
24. Shutdowns Scheduled Over Next 6 Months tType. Date,and Duration of Eacht: ,

(Est. Oct. 1985) 25 If Shut Down At End Of Report Period. Estimated Date of Startup:

Forecast Achieved 26 Units in Test Status IPrior to Commercial Operationi:

INITIAL CRITICALITY ' -

INITIAL ELECTRICITY h g COMMERCI AL OPfR ATION 8510290476 850930 l PDR ADOCK 05000286 R PDR t _ -

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-286 Indian Point UNIT No. 3 DATE 10-1-85 COMPLETED BY L. Kelly TELEPHONE (914) 739-8200 MONTH Ronrombor 19 A ci DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL IMWe Net)  : Mwe-Net) 1 0 g7 0 2 0 g3 -O 3 0 19 0 4 n 20 0 5 0 3g 0 6 0 31 0 7 0 23 0 g 0 24 0 9 0 25 0 10 0 26 0 11 n 27 0 0 0 12 33 0 0 13 39 14 0 30 0 15 0 33 16 0 INSTRUCTIONS On this format. list the average daily unit power levelin MWe Net for each day in the reporting inonth. Con.pute to the nearest whole megawatt.

(9/771

i

)

INN'EEI 'IO- ~ " '

UNil SIltJ1 DOWNS /.ND POWER REDtJCllONS

! IJNil' NAME r n,ii,n rnine um 5 DAIE 10-1-85 COMi*l.EIED HY -L- KelIv REPORT MON HI IEl.ErilONE *s l 4-7 l')-820(1 a

c

.$ g };; j E5 f.icensee E ,, {*'l, Cause & Coureceive No. Date g 3g 2g5 livent gy gU8 Attion to H y3 $ @ l's pos t # to U Psebent Hecur ence 6

? 06 85-06-08 S 720 C 2 N/A ZZ ZZZZZZ Unit in a scheduled cycle IV - V I

refueling outage.

I i

i 2 3 4 F: Fo ced Reason: Method: Ishitus -Insesnianuns S: Scheduled A-L iuipment Failure (Explain) l Manual 1.u Picpaeainni of D sea H. Maintenance or Tesi 2 Manual Sciam. I nisy Shecis fue laensee I

C-Refueling 3- Automatic Scsam. I seus Itcp.ni ei l 10 l'dc INilRI (;-

! D Regulatory Resisiclism 4-Ot hes Ilimplanil 811611 j I- Opesaios Tsaining & License I uminissini

  • F Adnunist ative s
(; Opcsatiosial linien ( F xplain i I sinius li Same Sinoce l'8/77) ll Olher (limplain)

_ _ - _ _ - - . . _ - - . . _ . . - ~. - - - . .- -

4 MONTHLY I & C CATECORY I REPORT September 1985 MONTH WRf DATE EQUIPMENT MALFUNCTION CORRECTIVE ACTION 4575 9/2/85 Hydrogen Recombiner Out of calibration. Calibrated pressure Pressure Transmitter PT-2A transmitter.

4514 9/11/85 480V AC, Bus 6A, Degraded Relay failed. Replaced relay.

Crid Sensing Relay 27-4/6A 4564 9/13/85 Safety Injection System Does not indicate flow, Calibrated flow transmitter.

Flow Transmitter FT-927 out of calibration.

4560 9/14/85 Charging Valve HCV-142 Valve will not operate. Repaired supply air piping.

4300 9/16/85 Weld Channel Penetration Switch will not function. Switch cleaned and calibrated.

, Pressurization System, Rack 18, PC11505-Z24 4303 9/16/85 Weld Channel Penetration Switch will not function. Switch cleaned and calibrated,

j. Pressurization System, Rack l 18, PC11505-D14

$ 4592 9/20/85 Reactor Coolant System, Input operational amplifier Replaced amplifier and l Wide Range RTD, Resistance is bad. recalibrated.

to Current Converter TE-413B 4577 9/22/85 Pressurizer Relief Tank Alarm setpoints out of Calibrated alarm setpoints.

1 Hi Level Alarm Switch specification.

LA-470B

{!

I 4544 9/23/85 Reactor Protection System, Relay sticks during testing. Replaced relay.

Relay RTSB 4605 9/24/85 Chemical and Volume Indicator pegged high with Re-attached pointer on Barton I Control System, FI-116 zero flow. Floumeter and adjusted "0".

4629 9/28/85 Low Head Safety Injection Indicator in CCR failed low. Tightened loose link on side System Accumulator of transmitter.

Pressure Transmitter 936D

MONTHLY MAINTENANCE CATEGORY I REPORT

September 1985 MONTH MWRf DATE EQUIPMENT MALFUNCTION CORRECTIVE ACTION 6838 9/5!85 Recirculation Pump Suction Flange leaks Replaced gasket Flange 7033 9/10/85 Chemical and Volume Control Solenoid inoperative Repaired wiring and' tubing System, Valve 204B 7106 9/11/85 Boron Injection Tank Valve will not close Cleaned valve seat Inlet Valve 1852A 5264 9/12/85 Service Water to Lube oil Worn gear Replaced gear Coolers, Valve SWT-2 7072 9/14/85 Service Water Pump #35 High vibrations and low Replaced pump with spare discharge pressure 7108 9/14/85 Reactor Coolant Pump #32 Broken valve stem Replaced valve stem and Seal Injection Line, Valve operator then reset limits.

1432.

7107 9/14/85 Residual Heat Removal Unable to operate valve Tighten loose wire Valve MOV-744 6862 9/14/85 Fan Cooler Unit #35 Motor Upper supply hose leaks Replaced flex hose Cooler 6666 9/14/85 Service Water, Fan Cooler Isolation root valve bad Replaced root valve and tubing Unit #31, FT-1121 adaptor 6994 9/16/85 Pressurizer Level Transmitters, Fittings leaked Replaced fittings LT-459, 460, 461 7005 9/16/85 Service Water Pump 134 High vibrations and runs Replaced pump with spare noisy O

,. _-___ ___ - - - - - - _ ~ . _ - - - . - - . . . ..- . - - - . _ - . . - _ . . - _ _ _ _ . _ . - - - . . . . . .

i 4

MONTHLY MAINTENANCE CATEGORY I REPORT September 1985 MONTH

'MERf DATE EQUIPMENT MALFUNCTION CORRECTIVE ACTION 6840 9/16/85 Safety Injection Pump #31 Bearing cooler Icaks Replaced swagelok

, Outboard Bearing Cooler fittings '

i 6933 9/17/85 Chemical.and Volume control Air supply regulator valve has Repaired valve and rewired

} System.. Valve 204B blown diaphram, blows fuses t

l 7098 9/17/85 Chemical and Volume Control Valve has dual indication Adjusted limit switch l System.. Valve 204B 7074 9/17/85 Primary Sampling System. Air line to valve broken Replaced air line RHR Sample Line Isolation Valve 958 7116 9/17/85 C.V.C.S. Excess Letdown Solenoid inoperative Repaired wiring Valve 213A 7118 9/18/85 Main Steam Isolation Valve'31 Valve actuator piston leaks Replaced operator 7132 9/18/85 . Fan Cooler Unit #33, Relief Valve leaks Replaced valve Valve SWN 142 '

6934 9/18/85 Chemical and Volume Control Solenoid continuously venting Repaired wiring to SOV System, Valve 110B 7120 9/18/85 C.V.C.S. Alternate Charging Dual indication Adjusted limits Valve 204A 7058 9/18/85 . Steam Generator Sample Valves; Dual indication Adjusted limits i PCV-1225A, PCV-1226. PCV-1226A 7081 9/19/85 Boric Acid Transter Pump #31, Heater burned out Replaced heater strip heater 7119 9/19/85 C.V.C.S. Normal Charging Valve Valve operates in reverse Repaired indication

. 204B

_ ____ _ _ _ _ , = . - - - - - - - ,- , w . , , - . . - +,- -e ,-,w

1 MONTHLY MAINTENANCE CATECORY I REPORT September 1985 MONTH MWR# DATE EQUIPMENT MALFUNCTION CORRECTIVE ACTION 6932 9/19/85 Hydrogen Recombiner Isolation Valve leaks Replaced valve seat and Valve IV-5B bonnet to body gasket 7133 9/19/85 Fan Cooler Unit 32, Valve SWN-51 Valve leaks Replaced valve 6993 9/19/85 Boric Acid Transter Pump #31 Strip heater "open circuited" Repaired wiring heat trace, circuit 40 7123 9/19/85 Component Cooling Water Valve Motor bad Replaced motor 769 6950 9/20/85 Auxiliary Boiler Feed Purp, Dual indication Adjusted limit switch Control Valve PCV-1310A 7154 9/20/85 Residual Heat Removal Sample Valve will not stroke Replaced solenoid valve Valve - 958 7144 9/20/85 Containment Isolation Valve Dual indication Rewired correctly 1882A 7158 9/20/85 Component Cooling Water Excess Dual indication Replaced diaphragm Letdown Valve 793 7155 9/20/85 V.C. Ventilation, FCV-1173 Valve will not close Replaced solenoid 7157 9/20/85 Steam Generator Blowdown, Open limit switch inoperative Replaced limit switch Valve 1216A 6244 9/21/85 Weld Channel Low Pressure Sticky switch plunger Replaced switch Alarm Rack 18 Z-27 6951 9/22/85 Steam Generator Blowdown, Valve will not close Replaced SOV PCV-1215

MONTHLY MAINTENANCE CATEGORY I REPORT September 1985 MONTH MWRf DATE EQUIPMENT- MALF'"!CTION CORRECTIVE ACTION-7178 9/22/85 #32 Aux. Boiler Feed Pump Steam Dual indication Adjusted collar on

-Isolation Valves 1310 A &.B stem extension 7150 9/23/85 Component Cooling Water to Blown fuse Rebuilt motor R.H.R. 31 Heat Exchanger.

Valve 822A' 7156 9/23/85 Steam Generator Blowdown, Solenoid operated, valve Replaced SOV Valves 1225 and 1226A inoperative 7135 9/26/85 Hydrogen Recombiner 32, Closed indicating Replaced indicator lamp Bleed valve BV-6 light inoperative 9

9

f .

SLMIARY OF OPERATING EXPERIENCE SEPTEMBER 1985 Indian Point Unit 3 remained shutdown for the Cyle 4/5 refueling outage for the entire reporting period.

  • Indian Point 3 Nucleer Power Plant PO. Box 215 Duchanan, New %)rk 10511 914 739 8200
  1. > NewYorkPower tsf Authority October 15, 1985 IP-LK-2564 Docket No. 50-286 License No. DPR-64 Director, Office of Inspection and Enforcement U. S. Nuc1 car Regulatory Commission Washington, D. C. 20555 Attention: Document Control Desk

Dear Sir:

Enclosed you will find twelve copies of the monthly operating report relating to Indian Point 3 Nucicar Power Plant for the month of September, 1985.

Very truly yours,

/ ,

/,dJO rs-< v William .J iger dsident Ma ager L1QJy Enclosures (12 Copies) cc: Dr. Thomas E. Murley, Regional Administrator Region 1 U. S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, Pennsylvania 19406 IP3 Resident Inspectors' Office George Wilverding (SRC), WP0 J. P. Bayne, WP0 J. C. Brons, WP0 S. V. Fuller, NYO W. R. Yario, NY0 INPO Records Center Suite 1500 1100 circle 75 Parkway Atlanta, Georgia 30339 IE2A